# US 2026/0076135 A1 · Semiconductor reaction chamber and semiconductor processing apparatus and methods

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0076135 A1
- Document ID: US20260076135A1
- Status: Published application
- Kind: A1
- Application number: 19/388,448
- Filed: 2025-11-13
- Published: 2026-03-12
- Earliest claimed: 2020-08-25
- Assignees: Beijing Naura Microelectronics Equipment Co., Ltd.
- Applicants: Beijing Naura Microelectronics Equipment Co., Ltd.
- Inventors: Jian LIU
- Web page: https://patentgrep.com/patent/US20260076135A1

## CPC

- H10P 72/0421: {for drying etching}
- H10P 72/0432: {mainly by conduction}
- H10P 72/0434: {mainly by convection}
- H10P 72/0462: {characterised by the construction of the processing chambers, e.g. modular processing chambers}
- H10P 72/722: {Details of electrostatic chucks}
- H10P 72/7624: {characterised by the mechanical construction of the susceptor, stage or support}
- H10P: GENERIC PROCESSES OR APPARATUS FOR THE MANUFACTURE OR TREATMENT OF DEVICES COVERED BY CLASS H10

## Abstract

A method for a semiconductor reaction chamber includes monitoring a first pressure in an inner chamber, monitoring a second pressure in an accommodation chamber, and in response to detection of a pressure difference between the first pressure and the second pressure greater than a threshold value, balancing the first pressure and the second pressure. The inner chamber is arranged for processing a workpiece. An electrostatic chuck is disposed in the inner chamber for placing the workpiece and includes a functional layer and a base body. The functional layer is fixed on the base body. The accommodation chamber is arranged under the functional layer and enclosed by the functional layer and the base body. A functional wire is disposed in the accommodation chamber and connected with the functional layer. The accommodation chamber is isolated from the inner chamber.

## Claims

### Claim 1

A method for a semiconductor reaction chamber including an inner chamber and an accommodation chamber, comprising:
monitoring a first pressure in the inner chamber, wherein the inner chamber is arranged for processing a workpiece, an electrostatic chuck is disposed in the inner chamber for placing the workpiece and includes a functional layer and a base body, and the functional layer is fixed on the base body;
monitoring a second pressure in the accommodation chamber, wherein the accommodation chamber is arranged under the functional layer and enclosed by the functional layer and the base body, a functional wire is disposed in the accommodation chamber and connected with the functional layer, and the accommodation chamber is isolated from the inner chamber; and
in response to detection of a pressure difference between the first pressure and the second pressure greater than a threshold value, balancing the second pressure in the accommodation chamber and the first pressure in the inner chamber.

### Claim 2 (depends on 1)

The method according to claim 1, further comprising:
in response to detection of a pressure difference between the first pressure and the second pressure greater than the threshold value and the first pressure being higher than the second pressure, increasing the second pressure to reduce the pressure difference by supplying a gas to the accommodation chamber through an air inflation device; or
in response to detection of a pressure difference between the first pressure and the second pressure greater than the threshold value and the first pressure being lower than the second pressure, decreasing the second pressure to reduce the pressure difference by extracting a gas from the accommodation chamber through an air extraction device.

### Claim 3 (depends on 1)

The method according to claim 1, further comprising:
when the semiconductor reaction chamber is in a working state, controlling the inner chamber to remain in a vacuum state and using an air extraction device to extract a gas in the accommodation chamber; and
when the semiconductor reaction chamber is in a non-working state, controlling the inner chamber to remain in an atmospheric pressure state and using an air inflation device to inflate the accommodation chamber to cause the accommodation chamber to have atmospheric pressure.

### Claim 4 (depends on 1)

The method according to claim 1, further comprising:
adjusting the second pressure in the accommodation chamber through adjusting a flow rate of a gas via a flow controller of an air inflation device.

### Claim 5 (depends on 4)

The method according to claim 4, further comprising:
maintaining an extracting state of an air extraction device when the second pressure in the accommodation chamber is adjusted by the flow controller of the air inflation device.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the semiconductor reaction chamber further comprises a chamber controller and the method further comprises:
monitoring the first pressure and the second pressure and adjusting the second pressure in the accommodation chamber to reduce the pressure difference automatically by the chamber controller.

### Claim 7 (depends on 1)

The method according to claim 1, further comprising:
monitoring the first pressure through a first pressure sensor in the inner chamber; and
monitoring the second pressure through a second pressure sensor in the accommodation chamber.

### Claim 8

A semiconductor reaction chamber comprising:
an inner chamber for processing a workpiece;
an electrostatic chuck including a functional layer and a base body and arranged in the inner chamber for placing the workpiece, the functional layer fixed on the base body;
an accommodation chamber under the functional layer and surrounded by the functional layer and the base body, the accommodation chamber isolated from the inner chamber;
an air inflation device for supplying a gas to the accommodation chamber;
an air extraction device for extracting the gas from the accommodation chamber; and
a chamber controller including a processor and a memory for storing computer programs that, when being executed, cause the processor to perform:
monitoring a first pressure in the inner chamber;
monitoring a second pressure in the accommodation chamber; and
in response to detection of a pressure difference between the first pressure and the second pressure greater than a threshold value, adjusting the second pressure in the accommodation chamber to reduce the pressure difference through the air inflation device or the air extraction device.

### Claim 9 (depends on 8)

The semiconductor reaction chamber according to claim 8, wherein the processor is further configured to perform:
adjusting the second pressure in the accommodation chamber through adjusting a flow rate of the gas via a flow controller of the air inflation device.

### Claim 10 (depends on 9)

The semiconductor reaction chamber according to claim 9, wherein the processor is further configured to perform:
maintaining an extracting state of the air extraction device when the second pressure in the accommodation chamber is adjusted by the air inflation device.

### Claim 11 (depends on 8)

The semiconductor reaction chamber according to claim 8, wherein the processor is further configured to perform:
monitoring the first pressure through a first pressure sensor in the inner chamber; and
monitoring the second pressure through a second pressure sensor in the accommodation chamber.

### Claim 12 (depends on 8)

The semiconductor reaction chamber according to claim 8, wherein the functional layer includes a heating layer for heating the workpiece.

### Claim 13 (depends on 8)

The semiconductor reaction chamber according to claim 8, wherein the processor is further configured to perform:
in response to the pressure difference exceeding the threshold value, generating an optical or audible alarm signal.

### Claim 14 (depends on 8)

The semiconductor reaction chamber according to claim 8, wherein the processor is further configured to perform:
in response to the pressure difference exceeding the threshold value and the chamber controller failing to decreasing the pressure difference, generating an optical or audio alarm signal.

### Claim 15

A method for a semiconductor reaction chamber including an inner chamber and an accommodation chamber, comprising:
monitoring a first pressure in the inner chamber, wherein the inner chamber is arranged for processing a workpiece, an electrostatic chuck is disposed in the inner chamber for placing the workpiece and includes a functional layer and a base body, and the functional layer is fixed on the base body;
monitoring a second pressure in the accommodation chamber, wherein the accommodation chamber is arranged under the functional layer and surrounded by the functional layer and the base body, and the accommodation chamber is isolated from the inner chamber;
supplying a gas from a gas source to the accommodation chamber through an air inflation device;
extracting the gas from the accommodation chamber through an air extraction device; and
adjusting the second pressure to reduce a pressure difference between the first pressure and the second pressure by adjusting a flow rate of the gas through the air inflation device.

### Claim 16 (depends on 15)

The method according to claim 15, further comprising:
maintaining an extracting state of the air extraction device when adjusting the flow rate of the gas through the air inflation device.

### Claim 17 (depends on 15)

The method according to claim 15, wherein the semiconductor reaction chamber further comprises a chamber controller and the method further comprises:
monitoring the first pressure and the second pressure and adjusting the second pressure in the accommodation chamber to reduce the pressure difference automatically by the chamber controller.

### Claim 18 (depends on 15)

The method according to claim 15, further comprising:
in response to the pressure difference exceeding a threshold value, generating an optical or audio alarm signal.

### Claim 19 (depends on 17)

The method of claim 17, further comprising:
in response to the pressure difference exceeding a threshold value and the chamber controller failing to decreasing the pressure difference, generating an optical or audio alarm signal.

### Claim 20 (depends on 15)

The method according to claim 15, further comprising:
in response to the pressure difference exceeding a threshold value, adjusting the second pressure to reduce the pressure difference by adjusting the flow rate of the gas through the air inflation device.
