# US 2026/0075000 A1 · Systems and Methods for Directly Estimating Power Utilization Effectiveness of One or More Data Handling Facilities of a Communication System

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0075000 A1
- Document ID: US20260075000A1
- Status: Published application
- Kind: A1
- Application number: 18/882,589
- Filed: 2024-09-11
- Published: 2026-03-12
- Earliest claimed: 2024-09-11
- Assignees: T-Mobile Innovations LLC
- Applicants: T-Mobile Innovations LLC
- Inventors: John COSTER; Sean Michael Clarke SEEMANN; Yun-ling Jocelyn WANG
- Web page: https://patentgrep.com/patent/US20260075000A1

## CPC

- H04L 47/125: by balancing the load, e.g. traffic engineering
- H04L 67/12: specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- G06Q 50/06: Energy or water supply
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method for directly estimating PUE of one or more data handling facilities of a communication system. The method includes receiving a facility power dataset generated by a plurality of power monitors connected between electrically powered equipment of data handling facility of the one or more data handling facilities, and classifying data as belonging to either a productive power consumption group or a nonproductive power consumption group to provide a labeled facility power dataset. The method additionally includes creating by a PUE profile engine a PUE profile of the data handling facility using at least the labeled facility power dataset, the PUE profile containing an estimated PUE of the data handling facility based on the labeled facility power dataset, and continually and automatically updating by the PUE profile engine the estimated PUE of the PUE profile as the facility power dataset is received and provide the labeled facility power dataset.

## Claims

### Claim 1

A method for directly estimating power utilization effectiveness (PUE) of one or more data handling facilities of a communication system, the method comprising:
receiving by a PUE monitoring system a first facility power dataset generated by a plurality of power monitors connected between electrically powered equipment of first data handling facility of the one or more data handling facilities, wherein the first facility power dataset is representative of electrical power consumed by the electrically powered equipment of the first data handling facility;
classifying by the PUE monitoring system data contained in the received first facility power dataset as belonging to either a productive power consumption group of the first data handling facility or a nonproductive power consumption group of the first data handling facility to provide a labeled first facility power dataset;
creating by a PUE profile engine of the PUE monitoring system a first PUE profile of the first data handling facility using at least the labeled first facility power dataset, the first PUE profile containing an estimated first PUE of the first data handling facility based on the labeled first facility power dataset; and
continually and automatically updating by the PUE profile engine the estimated first PUE of the PUE profile as the PUE monitoring system continues to receive the first facility power dataset and provide the labeled first facility power dataset.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
reallocating at least one of telecommunication equipment, power system equipment, and cooling system equipment between the first data handling facility and another of the one or more data handling facilities of the communication system based on the estimated PUE of the first data handling facility as updated by the PUE profile engine.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
continually and automatically updating within twenty-four hours by the PUE profile engine the estimated first PUE of the PUE profile.

### Claim 4 (depends on 1)

The method of claim 1, wherein the estimated first PUE of the PUE profile is based on climatic data associated with a physical location of the first data handling facility.

### Claim 5 (depends on 1)

The method of claim 1, further comprising:
receiving by a query tool of the PUE monitoring system a query from a user pertaining to the first data handling facility and including a PUE parameter corresponding to at least one of an equipment feature of the first data handling facility and an operating environment feature of the first data handling facility; and
estimating by the PUE profile engine a predicted PUE of the first data handling facility using the PUE parameter and a first PUE model of the first data handling facility contained in the first PUE profile.

### Claim 6

A method for directly estimating power utilization effectiveness (PUE) of one or more data handling facilities of a communication system, the method comprising:
receiving by a PUE monitoring system a first facility power dataset generated by a plurality of power monitors connected between electrically powered equipment of first data handling facility of the one or more data handling facilities, wherein the first facility power dataset is representative of electrical power consumed by the electrically powered equipment of the first data handling facility;
classifying by the PUE monitoring system data contained in the received first facility power dataset as belonging to either a productive power consumption group of the first data handling facility or a nonproductive power consumption group of the first data handling facility to provide a labeled first facility power dataset;
creating by a PUE profile engine of the PUE monitoring system a first PUE profile of the first data handling facility using at least the labeled first facility power dataset, the first PUE profile containing a first PUE model of the first data handling facility that is based on the labeled first facility power dataset;
receiving by a query tool of the PUE monitoring system a query from a user pertaining to the first data handling facility and including a user-defined PUE parameter corresponding to at least one of an equipment feature and an operating environment feature of the first data handling facility; and
estimating by the PUE profile engine a predicted PUE of the first data handling facility using the first PUE model and the PUE parameter.

### Claim 7 (depends on 6)

The method of claim 6, further comprising:
reallocating at least one of telecommunication equipment, power system equipment, and cooling system equipment between the first data handling facility and another of the one or more data handling facilities of the communication system based on the predicted PUE of the first data handling facility.

### Claim 8 (depends on 6)

The method of claim 6, wherein the PUE parameter corresponds to the equipment feature which comprises a user-defined alteration to at least one of telecommunication equipment, power system equipment, and cooling system equipment of the first data handling facility.

### Claim 9 (depends on 6)

The method of claim 6, wherein the PUE parameter corresponds to the operating environment feature and comprises a user-defined future date whereby the predicted PUE corresponds to a predicted PUE of the first data handling facility on the future date.

### Claim 10 (depends on 6)

The method of claim 6, wherein the first PUE model comprises a temperature-dependent first PUE model and the PUE parameter corresponds to the operating environment feature and comprises a user-defined ambient weather condition associated with a physical location of the first data handling facility whereby the predicted PUE corresponds to a predicted PUE of the first data handling facility as the first data handling facility encounters the ambient weather condition.

### Claim 11

A method for estimating power utilization effectiveness (PUE) of one or more data handling facilities, the method comprising:
receiving by a PUE monitoring system a first facility power dataset generated by one or more sensors, wherein the first facility power dataset is representative of electrical power consumed by the electrically powered equipment of the first data handling facility;
classifying by the PUE monitoring system data contained in the received first facility power dataset as belonging to either a first power consumption group of the first data handling facility or a separate second power consumption group of the first data handling facility to provide a labeled first facility power dataset;
creating by a PUE profile engine of the PUE monitoring system a first PUE profile of the first data handling facility using at least the labeled first facility power dataset, the first PUE profile containing an environmentally dependent first PUE model of the first data handling facility that is based on both the labeled first facility power dataset and climatic data associated with a physical location of the first data handling facility; and
providing by the PUE profile engine an estimated first PUE of the first data handling facility using the labeled first facility power dataset, the climatic data, and the first PUE profile.

### Claim 12 (depends on 11)

The method of claim 11, further comprising:
reallocating at least one of telecommunication equipment, power system equipment, and cooling system equipment between the first data handling facility and another of the one or more data handling facilities of the communication system based on the estimated PUE of the first data handling facility.

### Claim 13 (depends on 11)

The method of claim 11, further comprising:
continually updating by the PUE profile engine the estimated first PUE of the PUE profile as the PUE monitoring system continues to receive the first facility power dataset and provide the labeled first facility power dataset.

### Claim 14 (depends on 11)

The method of claim 11, further comprising:
receiving by a query tool of the PUE monitoring system a query from a user pertaining to the first data handling facility and including a user-defined PUE parameter corresponding to at least one of an equipment feature and an operating environment feature of the first data handling facility; and
estimating by the PUE profile engine a predicted PUE of the first data handling facility using the first PUE model and the PUE parameter.

### Claim 15 (depends on 11)

The method of claim 11, wherein the climatic data comprises temperature trend data in outdoor ambient temperature for the physical location of the first data handling facility that extend at least a decade in length.

### Claim 16 (depends on 11)

The method of claim 11, further comprising:
receiving by a query tool of the PUE monitoring system a query from a user pertaining to the first data handling facility and including a user-defined PUE parameter comprising a user-defined future date; and
estimating by the PUE profile engine a predicted PUE of the first data handling facility using the first PUE model and the PUE parameter, wherein the predicted PUE corresponds to a predicted PUE of the first data handling facility on the future date and that is based on the climatic data.

### Claim 17 (depends on 11)

The method of claim 11, wherein the one or more sensors comprise one or more electrical power monitors.

### Claim 18 (depends on 11)

The method of claim 11, wherein the one or more sensors comprises a plurality of power monitors connected between electrically powered equipment of first data handling facility of the one or more data handling facilities.

### Claim 19 (depends on 11)

The method of claim 11, wherein the first power consumption group comprises a productive power consumption group of the first data handling facility and the second power consumption group comprises a nonproductive power consumption group of the first data handling facility.

### Claim 20 (depends on 11)

The method of claim 11, wherein the environmentally dependent first PUE model comprises a temperature-dependent first PUE model.
