# US 2026/0074794 A1 · Time to fail and edge impact sequence predictions for optical transceivers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0074794 A1
- Document ID: US20260074794A1
- Status: Published application
- Kind: A1
- Application number: 18/936,768
- Filed: 2024-11-04
- Published: 2026-03-12
- Earliest claimed: 2024-09-12
- Assignees: Hewlett Packard Enterprise Development LP
- Applicants: Hewlett Packard Enterprise Development LP
- Inventors: Venugopal Vembrakat Ranganath Prabhu; David McMullen; Nagaraj Davanakatti; Chandan Kenchegowda; Pavithra Halappa Jakallannavar; Narasimhasastry Kasavajjhula; Varsha Kulkarni; Chuan Peng
- Web page: https://patentgrep.com/patent/US20260074794A1

## CPC

- H04B 10/40: Transceivers
- H04B 10/0793: {Network aspects, e.g. central monitoring of transmission parameters}
- H04B 10/07955: {Monitoring or measuring power}
- H04B: TRANSMISSION

## Abstract

Systems and methods are provided for predicting a time until failure of an optical transceiver that is used within a context of a storage area network. In order to proactively take the optical transceiver offline or otherwise replace the transceiver before its failure affects the larger network, a long short-term memory recurrent neural network is executed to predict the time that remains until a predicted failure of the transceiver. The degradation in transmission power of the transceiver is monitored until a point at which the value falls below a threshold. This then causes the neural network to be executed and an alert message to be provided to a customer, informing them of the predicted time until failure of the particular component within their larger network.

## Claims

### Claim 1

A method, comprising:
predicting a time until failure of an optical transceiver within a Fibre Channel (FC) network, wherein the predicting comprises:
polling the optical transceiver for transmission power values;
determining that a given one of the transmission power values is below a threshold operability value;
storing the given transmission power value and an associated time stamp; and
executing a neural network based, at least in part, on the given transmission power value and the associated time stamp, wherein the neural network outputs a predicted time until failure of the optical transceiver; and
providing an indication to a customer of the FC network of the predicted time until failure of the optical transceiver, the provided indication prompting replacement of the optical transceiver prior to the predicted time until failure.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining an expected impact to the FC network given a failure of the optical transceiver, wherein the determination comprises:
polling the optical transceiver for log files;
encoding the log files into a first set of numerical representations;
identifying, based on a historical record of other log files, patterns pertaining to sequences of events localized around times of failure of other optical transceivers;
encoding the event sequence patterns into a second set of numerical representations; and
identifying, via the first and second sets of numerical representations, the expected impact; and
additionally providing the determined expected impact within the indication to the customer.

### Claim 3 (depends on 2)

The method of claim 2, wherein the events within the event sequence patterns comprise one or more of:
a first alert that transmission power of a given optical transceiver of the other optical transceivers is below the threshold operability value;
a second alert that the given optical transceiver recorded a frame timeout; or
a third alert that a port that the given optical transceiver is connected to has been turned off.

### Claim 4 (depends on 2)

The method of claim 2, wherein the identifying the expected impact comprises calculating a cosine similarity between the first and second sets of numerical representations and ranking results of the calculation.

### Claim 5 (depends on 2)

The method of claim 2, further comprising determining, via a comparison between one or more events in the log files and the predicted time until failure, that the optical transceiver, and not another hardware component that is local to the optical transceiver, is on track towards failure.

### Claim 6 (depends on 2)

The method of claim 2, further comprising:
determining, via a comparison between one or more events in the log files and the predicted time until failure, that another hardware component that is local to the optical transceiver, and not the optical transceiver, is on track towards failure; and
reformulating the indication that is to be provided to the customer to indicate that the other hardware component that is local to the optical transceiver is on track towards failure.

### Claim 7 (depends on 1)

The method of claim 1, wherein the neural network is a long short-term memory (LSTM) recurrent neural network.

### Claim 8 (depends on 1)

The method of claim 1, wherein the predicting the time until failure further comprises:
responsive to determining that the given one of the transmission power values is below the threshold operability value, continuing to poll for and store additional transmission power values and associated time stamps; and
causing the neural network to be re-executed based, at least in part, on the additional transmission power values and the associated time stamps, wherein the neural network outputs an updated predicted time until failure of the optical transceiver.

### Claim 9

A method comprising:
predicting, via execution of a long short-term memory (LSTM) recurrent neural network, a time until failure of an optical transceiver within a Fibre Channel (FC) network;
determining, via a historical record of log files corresponding to the optical transceiver, an expected impact to the FC network given the failure of the optical transceiver;
providing an indication to a customer of the FC network of the predicted time until failure of the optical transceiver and the determined expected impact; and
receiving confirmation that the optical transceiver has been replaced.

### Claim 10 (depends on 9)

The method of claim 9, wherein the predicting the time until failure of the optical transceiver comprises:
polling the optical transceiver for transmission power values;
storing received transmission power values; and
executing a neural network based, at least in part, on the transmission power values, wherein the neural network outputs a predicted time until failure of the optical transceiver.

### Claim 11 (depends on 10)

The method of claim 10, further comprising:
responsive to determining that a first of the transmission power values is above a threshold operability value, continuing to poll the optical transceiver for additional transmission power values;
responsive to determining that a first of the additional transmission power values is below the threshold operability value, storing the first of the additional transmission power values and an associated time stamp; and
causing the neural network to be executed.

### Claim 12 (depends on 10)

The method of claim 10, further comprising:
generating a training dataset for the LSTM recurrent neural network based on the stored transmission power values and their associated time stamps; and
retraining the LSTM recurrent neural network using the generated training dataset.

### Claim 13 (depends on 9)

The method of claim 9, wherein the determining the expected impact to the FC network comprises:
determining an expected impact to the FC network given a failure of the optical transceiver, wherein the determination comprises:
polling the optical transceiver for log files;
encoding the log files into a first set of numerical representations;
identifying, based on a historical record of other log files, patterns pertaining to sequences of events localized around times of failure of other optical transceivers;
encoding the event sequence patterns into a second set of numerical representations; and
identifying, via the first and second sets of numerical representations, the expected impact; and
additionally providing the determined expected impact within the indication to the customer.

### Claim 14 (depends on 13)

The method of claim 13, wherein the events within the event sequence patterns comprise one or more of:
a first alert that transmission power of a given optical transceiver of the other optical transceivers is below a threshold operability value;
a second alert that the given optical transceiver recorded a frame timeout; or
a third alert that a port that the given optical transceiver is connected to has been turned off.

### Claim 15

A system, comprising:
an optical transceiver within a Fibre Channel (FC) network, configured to periodically send transmission power values and log files;
one or more processors; and
memory having program instructions that, when executed by the one or more processors, cause the one or more processors to:
predict a time until failure of the optical transceiver by receiving the transmission power values and executing a neural network based, at least in part, on the transmission power values, wherein the neural network outputs a predicted time until failure of the optical transceiver;
determine an expected impact to the FC network given a failure of the optical transceiver by receiving the log files and identifying, via natural language processing, patterns of event sequences within the log files;
provide an indication to a customer of the FC network of the predicted time until failure of the optical transceiver and the expected impact given the failure of the optical transceiver; and
receive confirmation that the optical transceiver has been replaced.

### Claim 16 (depends on 15)

The system of claim 15, wherein to determine the expected impact, the program instructions further cause the one or more processors to:
encode the log files into a first set of numerical representations;
identify, based on a historical record of other log files, patterns pertaining to sequences of events localized around times of failure of other optical transceivers;
encode the event sequence patterns into a second set of numerical representations; and
identify, via the first and second sets of numerical representations, the expected impact.

### Claim 17 (depends on 15)

The system of claim 15, wherein the program instructions further cause the one or more processors to:
determine, via a comparison between one or more events in the log files and the predicted time until failure, that the optical transceiver, and not another hardware component that is local to the optical transceiver, is on track towards failure.

### Claim 18 (depends on 15)

The system of claim 15, wherein the program instructions further cause the one or more processors to:
determine, via a comparison between one or more events in the log files and the predicted time until failure, that another hardware component that is local to the optical transceiver, and not the optical transceiver, is on track towards failure; and
reformulate the indication that is to be provided to the customer to indicate that the other hardware component that is local to the optical transceiver is on track towards failure.

### Claim 19 (depends on 15)

The system of claim 15, wherein the optical transceiver comprises a transmitter optical subassembly (TOSA) and a receiver optical subassembly (ROSA).

### Claim 20 (depends on 15)

The system of claim 15, wherein the neural network is a long short-term memory (LSTM) recurrent neural network.