# US 2026/0074685 A1 · Managing energy consumption of equipment using pulse width modulation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0074685 A1
- Document ID: US20260074685A1
- Status: Published application
- Kind: A1
- Application number: 19/323,733
- Filed: 2025-09-09
- Published: 2026-03-12
- Earliest claimed: 2024-09-11
- Assignees: GlacierGrid Inc.
- Applicants: GlacierGrid Inc.
- Inventors: Manik Varun Suri; Aaron Morris Cohen; Christophe Niglio; Chander Chawla; Laurent Parenteau; Lucas Tepman
- Web page: https://patentgrep.com/patent/US20260074685A1

## CPC

- H03K 7/08: Duration or width modulation {; Duty cycle modulation}
- F24F 11/46: Improving electric energy efficiency or saving
- F24F 11/63: Electronic processing
- F24F 11/64: using pre-stored data
- F24F 11/80: for controlling the temperature of the supplied air
- F24F 11/88: Electrical aspects, e.g. circuits
- F24F 2110/12: of the outside air
- H03K: PULSE TECHNIQUE (measuring pulse characteristics G01R; modulating sinusoidal oscillations with pulses H03C; transmission of digital information H04L; discriminator circuits detecting phase difference between two signals by counting or integrating cycles of oscillation H03D3/04; automatic control, starting, synchronisation or stabilisation of generators of electronic oscillations or pulses where the type of generator is irrelevant or unspecified H03L; coding, decoding or code conversion, in general H03M)
- F24F: AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING (removing dirt or fumes from areas where they are produced B08B15/00; vertical ducts for carrying away waste gases from buildings E04F17/02; tops for chimneys or ventilating shafts, terminals for flues F23L17/02)

## Abstract

A system uses pulse width modulation (PWM) to control the power demand of an equipment. The system receives a thermostat setting for controlling the equipment. The system provides output of the controller to a pulse width modulator. The pulse width modulator causes the signal provided as input to the equipment to be turned off for a portion of a time interval. The portion of cycle during which the signal is turned off is determined based on a duty cycle of the pulse width modulator. The system provides the controller output modulated by the pulse width modulator as input to the equipment. The modulated output of the controlled causes the demand of the equipment to decrease.

## Claims

### Claim 1

A computer-implemented method, comprising:
receiving a thermostat setting for controlling an equipment for changing temperature of a space associated with the equipment, the equipment controlled by a signal provided as input to the equipment;
generating a modulated signal based on the thermostat setting by performing pulse width modulation of the signal provided as input to the equipment by causing the signal to be turned off for a portion of time interval and turned on for remaining time interval, the portion of time interval determined based on a duty cycle; and
providing the modulated signal as input to the equipment, causing a demand of the equipment to decrease, wherein the demand is a moving average of power consumption of the equipment determined over a time interval of a predetermined length.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the equipment is one of:
an air conditioning equipment,
a heating equipment,
a refrigeration equipment, or
a heating, ventilation, and air conditioning (HVAC) equipment.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, further comprising:
determining a time of peak power consumption of a facility; and
modifying the duty cycle based on the time of peak power consumption.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3, wherein the time of peak power consumption is predicted using a machine learning based model.

### Claim 5 (depends on 1)

The computer-implemented method of claim 1, wherein the equipment is used in a facility comprising one or more other equipments, wherein the duty cycle is determined based on one or more other equipments of the facility.

### Claim 6 (depends on 5)

The computer-implemented method of claim 5, wherein the facility includes one or more other equipments, the computer-implemented method further comprising:
staggering the portion of each time interval during which the input provided to each equipment is shut off.

### Claim 7 (depends on 1)

The computer-implemented method of claim 1, further comprising:
receiving a measure of a temperature of the space controlled by the equipment; and
determining the duty cycle based on temperature of the space controlled by the equipment.

### Claim 8

A non-transitory computer readable storage medium storing instructions that when executed by one or more computer processors cause the one or more computer processors to perform steps comprising:
receiving a thermostat setting for controlling an equipment for changing temperature of a space associated with the equipment, the equipment controlled by a signal provided as input to the equipment;
generating a modulated signal based on the thermostat setting by performing pulse width modulation of the signal provided as input to the equipment by causing the signal to be turned off for a portion of time interval and turned on for remaining time interval, the portion of time interval determined based on a duty cycle; and
providing the modulated signal as input to the equipment, causing a demand of the equipment to decrease, wherein the demand is a moving average of power consumption of the equipment determined over a time interval of a predetermined length.

### Claim 9 (depends on 8)

The non-transitory computer readable storage medium of claim 8, wherein the equipment is one of:
an air conditioning equipment,
a heating equipment,
a refrigeration equipment, or
a heating, ventilation, and air conditioning (HVAC) equipment.

### Claim 10 (depends on 8)

The non-transitory computer readable storage medium of claim 8, wherein the instructions cause the one or more computer processors to further perform steps comprising:
determining a time of peak power consumption of a facility; and
modifying the duty cycle based on the time of peak power consumption.

### Claim 11 (depends on 10)

The non-transitory computer readable storage medium of claim 10, wherein the time of peak power consumption is predicted using a machine learning based model.

### Claim 12 (depends on 8)

The non-transitory computer readable storage medium of claim 8, wherein the equipment is used in a facility comprising one or more other equipments, wherein the duty cycle is determined based on one or more other equipments of the facility.

### Claim 13 (depends on 12)

The non-transitory computer readable storage medium of claim 12, wherein the facility includes one or more other equipments, wherein the instructions cause the one or more computer processors to further perform steps comprising:
staggering the portion of each time interval during which the input provided to each equipment is shut off.

### Claim 14 (depends on 8)

The non-transitory computer readable storage medium of claim 8, wherein the instructions cause the one or more computer processors to further perform steps comprising:
receiving a measure of a temperature of the space controlled by the equipment; and
determining the duty cycle based on temperature of the space controlled by the equipment.

### Claim 15

A computer system comprising:
one or more computer processors; and
a non-transitory computer readable storage medium storing instructions that when executed by one or more computer processors cause the one or more computer processors to perform steps, comprising:
receiving a thermostat setting for controlling an equipment for changing temperature of a space associated with the equipment, the equipment controlled by a signal provided as input to the equipment;
generating a modulated signal based on the thermostat setting by performing pulse width modulation of the signal provided as input to the equipment by causing the signal to be turned off for a portion of time interval and turned on for remaining time interval, the portion of time interval determined based on a duty cycle; and
providing the modulated signal as input to the equipment, causing a demand of the equipment to decrease, wherein the demand is a moving average of power consumption of the equipment determined over a time interval of a predetermined length.

### Claim 16 (depends on 15)

The computer system of claim 15, wherein the equipment is one of:
an air conditioning equipment,
a heating equipment,
a refrigeration equipment, or
a heating, ventilation, and air conditioning (HVAC) equipment.

### Claim 17 (depends on 15)

The computer system of claim 15, wherein the instructions cause the one or more computer processors to further perform steps comprising:
determining a time of peak power consumption of a facility, wherein the time of peak power consumption is predicted using a machine learning based model; and
modifying the duty cycle based on the time of peak power consumption.

### Claim 18 (depends on 15)

The computer system of claim 15, wherein the equipment is used in a facility comprising one or more other equipments, wherein the duty cycle is determined based on one or more other equipments of the facility.

### Claim 19 (depends on 18)

The computer system of claim 18, wherein the facility includes one or more other equipments, wherein the instructions cause the one or more computer processors to further perform steps comprising:
staggering the portion of each time interval during which the input provided to each equipment is shut off.

### Claim 20 (depends on 15)

The computer system of claim 15, wherein the instructions cause the one or more computer processors to further perform steps comprising:
receiving a measure of a temperature of the space controlled by the equipment; and
determining the duty cycle based on temperature of the space controlled by the equipment.