# US 2026/0066698 A1 · Voltage control device, method for determining the optimized multi-measurement operating point with capability for artificial intelligence and voltage control system in branched network for voltage regulators

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0066698 A1
- Document ID: US20260066698A1
- Status: Published application
- Kind: A1
- Application number: 19/314,894
- Filed: 2025-08-29
- Published: 2026-03-05
- Earliest claimed: 2024-09-02
- Assignees: Transformadores E ServiçOs De Energia Das AméRicas S.A.
- Applicants: Transformadores E ServiçOs De Energia Das AméRicas S.A.
- Inventors: Felipe Vilaça MARCHEZINI
- Web page: https://patentgrep.com/patent/US20260066698A1

## CPC

- H02J 3/1878: using tap changing or phase shifting transformers
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 3/12: Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J 13/1335: {involving a local wireless network, e.g. Wi-Fi®, ZigBee® or Bluetooth®}
- H02J 13/333: the equipment forming part of substations
- H02J 13/34: the equipment being switches, relays or circuit breakers
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- H02J 2103/35: Grid-level management of power transmission or distribution systems, e.g. load flow analysis or active network management
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

A voltage controller device, a method for determining the optimized operating point and a voltage control system for branched electrical energy distribution networks including voltage meters installed at the points where it is of interest to control the voltage, internally having communication in the LPWA standard. An LPWA modem collects this information and passes it on to the Branched Network Voltage Controller, which internally has the specialist algorithm for the calculation of the Tap that must be selected in the Voltage Regulator so that the voltages at all points of interest are as much as possible within the specified limits. For this, it sends a command to the Voltage Regulator controller in the form of a voltage at the input of the TP, being compatible with the legacy in the field, or in the form of a command in an application protocol for compatible Voltage Regulator controllers.

## Claims

### Claim 1

A voltage controller device, comprising:
a. Means for remote communication with meters and/or with an intermediate point that has already collected information;
b. Means for performing a method for determining an optimized operating point or an optimized TAP for operation of a Voltage Regulator or a Voltage Regulators bank; and
c. Means for communication with a controller of the Voltage Regulator.

### Claim 2 (depends on 1)

The voltage controller device according to claim 1, wherein the means for remote communication comprise LPWA communication and/or mesh network.

### Claim 3 (depends on 1)

The voltage controller device according to claim 1, further comprising means for learning and memorizing an impact of voltage changes at each point of a network.

### Claim 4 (depends on 1)

The voltage controller device according to claim 1, further comprising a digital to analog converter (DAC) and/or an analog signal converter and conditioner (AFE).

### Claim 5

A method for determining an optimized operating point or an optimized TAP, comprising steps of:
a. Obtaining data from meters;
b. Calculation of a voltage regulation range;
c. Calculation of a weighted average voltage for sensors;
d. Calculation of a number of Taps to be switched; and
e. Verifying that the voltages are within the voltage regulation range.

### Claim 6 (depends on 5)

The method of claim 5, further comprising an additional step of excluding values of meters with very discrepant readings compared to others between steps a) and b).

### Claim 7 (depends on 5)

The method of claim 5, further comprising an additional step of excluding a point with a value outside the voltage regulation range and sending an alarm to SCADA, between steps a) and b).

### Claim 8 (depends on 5)

The method of claim 5, further comprising an additional step of changing a direction of the Tap if voltage variations are not in an expected direction of those from an expected voltage regulation, between steps d) and e).

### Claim 9 (depends on 5)

The method of claim 5, further comprising the steps of: memorizing an impact of changes at each point of a network by means of artificial intelligence or machine learning, performed between steps a) and e), and using this information in calculating the weighted average voltage for the sensors.

### Claim 10

A branched network voltage control system, comprising:
a. A voltage controller device comprising means for determining an optimized operating point;
b. A plurality of field meters;
c. Means for sending information from the field meters to the voltage controller device; and
d. A voltage regulator,
wherein the control system is independent from a SCADA system, and further comprises an autonomous control system having an actuation radius of up to 15 km.