- Number: US 2026/0066658 A1
- Document ID: US20260066658A1
- Status: Published application
- Kind: A1
- Application number: 19/103,264
- Filed: 2022-08-24
- Published: 2026-03-05
- Earliest claimed: 2022-08-24
- Assignees: Siemens Aktiengesellschaft
- Applicants: Siemens Corporation
- Inventors: Ang Li; Yubo Wang; Siddharth Bhela
- Web page: https://patentgrep.com/patent/US20260066658A1

## CPC

- G06Q 50/06: Energy or water supply
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 3/004: {Generation forecast, e.g. methods or systems for forecasting future energy generation}
- H01M 2220/10: Batteries in stationary systems, e.g. emergency power source in plant
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02E 40/10: Flexible AC transmission systems [FACTS]
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H01M: PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

According to a method to aid installation of large-scale BESS in a power network, a hyperparameter optimization engine generates a feasible configuration of BESS defined by location and sizing parameters subject to an installation constraint. A power system simulation engine conducts an energy market simulation for the power network with the generated configuration over a defined simulation horizon to determine a configuration value. The power system simulation engine comprises one or more subroutines characterizing the impact of the BESS on the market clearing mechanism, to compute an expected generation cost associated with the BESS. The configuration value is determined based on the expected generation cost and a total installation cost of the BESS. The hyperparameter optimization engine is iteratively executed to generate an updated configuration based on the configuration values of previous configurations, to determine a final configuration of BESS defined by a set of optimal location and sizing parameters.

## Claims

### Claim 1

A computer-implemented method to support installation of new battery energy storage systems (BESS) in a power network, comprising:
executing a hyperparameter optimization engine for generating a feasible configuration of BESS defined by a set of location and sizing parameters subject to an installation constraint,
executing a power system simulation engine for simulating an energy market for the power network with the generated configuration over a defined simulation horizon to determine a configuration value, by:
via a first simulator, solving an economic dispatch problem to minimize a total generation cost in the power network using bidding parameters associated with the BESS computed via a second simulator, to therefrom compute a locational marginal price (LMP) of the energy market,
via a second simulator, solving a BESS scheduling problem to minimize a generation cost associated with the BESS using the LMP computed via the first simulator, to therefrom compute the bidding parameters associated with the BESS,
iteratively updating the first simulator with the bidding parameters computed via the second simulator and updating the second simulator with the LMP computed via the first simulator to converge on an expected generation cost associated with the BESS, and
determining the configuration value based on the expected generation cost associated with the BESS and a total installation cost associated with the BESS,
wherein the hyperparameter optimization engine is executed over a number of iterations to generate, at each iteration, an updated configuration based on the configuration values of previous configurations, to determine a final configuration of BESS defined by a set of optimal location and sizing parameters.

### Claim 2 (depends on 1)

The method according to claim 1, wherein the location parameters are defined by nodes of the power network.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the sizing parameters include battery size of the BESS defined by battery capacity.

### Claim 4 (depends on 1)

The method according to claim 1, wherein the sizing parameters include inverter size of the BESS.

### Claim 5 (depends on 4)

The method according to claim 4,
wherein the inverter size defined by a first coefficient indicative of a ratio between a battery charging power limit and battery capacity and a second coefficient indicative of a ratio between a battery discharging power limit and battery capacity,
wherein second simulator is utilized to solve the BESS scheduling problem to minimize the generation cost associated with the BESS subject to constraints for battery charging rate and battery discharging rate defined respectively by the first and second coefficients.

### Claim 6 (depends on 1)

The method according to claim 1, wherein the installation constraint includes a maximum total installation cost associated with the BESS.

### Claim 7 (depends on 1)

The method according to claim 1, wherein the hyperparameter optimization engine comprises a Bayesian optimization engine.

### Claim 8 (depends on 1)

The method according to claim 1,
wherein the first simulator is utilized to solve the economic dispatch problem to minimize the total generation cost in the power network subject to a first constraint defined by a power balance and a second constraint defined by line power flow limits,
wherein the LMP is computed by computing dual variables to the relationships defining the first and second constraints.

### Claim 9 (depends on 1)

The method according to claim 1, wherein the bidding parameters are determined as a function of the LMP computed via the first simulator and charging and discharging schedules of the BESS computed via the second simulator to minimize the generation cost associated with the BESS.

### Claim 10 (depends on 1)

The method according to claim 1,
wherein the bidding parameters computed via the second simulator comprise a charging cost per unit of power and a discharging cost per unit of power for respective locations of the BESS,
wherein the total generation cost in the power network minimized via the first simulator is determined using the charging cost per unit of power and the discharging cost per unit of power for respective locations of the BESS.

### Claim 11 (depends on 10)

The method according to claim 10,
wherein the bidding parameters computed via the second simulator further comprise maximum and minimum charging rate limits and maximum and minimum discharging rate limits of respective BESS,
wherein the first simulator is utilized to solve the economic dispatch problem to minimize the total generation cost in the power network subject to constraints defined by the
the charging rate limits and discharging rate limits.

### Claim 12 (depends on 1)

The method according to claim 1, wherein the total installation cost associated with the BESS is determined based on sum of a battery capacity cost and an inverter size cost.

### Claim 13 (depends on 1)

The method according to claim 1, further comprising:
executing a simulation dispatch engine for decomposing the simulation horizon into a number of intervals to generate simulation subroutines corresponding to the respective intervals,
wherein the subroutines are independently processed in parallel via the simulation engine to determine an expected generation cost associated with the BESS for each interval, to therefrom determine the configuration value over the simulation horizon.

### Claim 14 (depends on 1)

A non-transitory computer-readable storage medium including instructions that, when processed by a computing system, configure the computing system to perform the method according to claim 1.

### Claim 15

A system to support installation of new battery energy storage systems (BESS) in a power network, comprising:
one or more processors, and
memory storing algorithmic modules executable by the one or more processors, the algorithmic modules comprising:
a hyperparameter optimization engine configured to generate a feasible configuration defined by a set of location and sizing parameters of the BESS subject to an installation constraint, and
a power system simulation engine configured to simulate an energy market for the power network with the generated configuration over a defined simulation horizon to determine a configuration value, the power system simulation engine comprising:
a first simulator configured to solve economic dispatch problem to minimize a total generation cost in the power network using bidding parameters associated with the BESS computed via a second simulator, to therefrom compute a locational marginal price (LMP) of the energy market, and
a second simulator configured to solve a BESS scheduling problem to minimize a generation cost associated with the BESS using the LMP computed via the first simulator, to therefrom compute the bidding parameters associated with the BESS,
wherein the first and second simulators are executable iteratively to update the first simulator with the bidding parameters computed via the second simulator and update the second simulator with the LMP computed via the first simulator to converge on an expected generation cost associated with the BESS,
wherein the configuration value is determined based on the expected generation cost associated with the BESS and a total installation cost associated with the BESS, and
wherein the hyperparameter optimization engine executable over a number of iterations to generate, at each iteration, an updated configuration based on the configuration values of previous configurations, to determine a final configuration defined by a set of optimal location and sizing parameters of BESS.

### Claim 16 (depends on 15)

The system according to claim 15, wherein the algorithmic modules further comprise a simulation dispatch engine configured to decompose the simulation horizon into a number of intervals to generate simulation subroutines corresponding to the respective intervals, wherein the subroutines are independently processed in parallel via the simulation engine to determine an expected generation cost associated with the BESS for each interval, to therefrom determine the configuration value over the horizon.