# US 2026/0065387 A1 · Project management in a material allocation system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0065387 A1
- Document ID: US20260065387A1
- Status: Published application
- Kind: A1
- Application number: 18/823,392
- Filed: 2024-09-03
- Published: 2026-03-05
- Earliest claimed: 2024-09-03
- Assignees: T-Mobile Innovations LLC
- Applicants: T-Mobile Innovations LLC
- Inventors: Stephen Matthew JONES
- Web page: https://patentgrep.com/patent/US20260065387A1

## CPC

- G06Q 50/08: Construction
- G06Q 10/06313: {Resource planning in a project environment}
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

Embodiments of the present disclosure are directed to systems and methods for generating project management attributes within a material allocation system for building a new telecommunications cell site. In order to generate project management attributes within a material allocation system, a project management engine of a network processes a database to determine a design of a new cell site, to communicate to third parties messages seeking approvals to begin construction of the new cell site, to determine resources that are required to complete construction of the new cell site, and to generate responses to queries related to the construction of the new cell site. In order to accomplish this, neural networks are used in conjunction with a generative artificial intelligence.

## Claims

### Claim 1

A system for generating project management attributes within a material allocation system, the system comprising:
one or more base stations receiving a measurement from each of a plurality of connections and aggregating the measurements to form a database within a wireless communications network to detect areas of relative service weakness; and
one or more computer processing components configured to perform operations comprising:
determining a design of a new cell site based on data stored in the database;
communicating to one or more third parties at least one message seeking one or more approvals to begin construction of the new cell site;
determining a plurality of resources that are required to complete construction of the new cell site based on data stored in the database; and
generating one or more responses to one or more queries related to the construction of the new cell site, the one or more responses based on data stored in the database.

### Claim 2 (depends on 1)

The system of claim 1, wherein a neural network determines the design of the new cell site, communicates the one or more documents to the one or more third parties, and determines the plurality of resources required to complete construction of the new cell site.

### Claim 3 (depends on 2)

The system of claim 2, wherein the data stored in the database further comprises field data, population data, data associated with a plurality of resources, data associated with a plurality of materials, and data associated with a return on investment.

### Claim 4 (depends on 2)

The system of claim 2, wherein determining the design of the new cell site further comprises determining when to begin construction of the new cell site, where to construct the new cell site, and how to construct the new cell site.

### Claim 5 (depends on 2)

The system of claim 2, wherein the data stored in the database is updated with a status of construction, wherein the status of construction comprises information associated with the construction of the new cell site.

### Claim 6 (depends on 2)

The system of claim 2, wherein the at least one message is based on the design of the new cell site.

### Claim 7 (depends on 2)

The system of claim 2, wherein the at least one message comprises an automatic email.

### Claim 8 (depends on 2)

The system of claim 2, wherein a generative artificial intelligence (AI) generates the one or more responses to the one or more queries.

### Claim 9 (depends on 2)

The system of claim 2, wherein an application programming interface (API) is used to cause display of the one or more responses to the one or more queries.

### Claim 10

A method for generating project management attributes within a material allocation system, the method comprising:
determining a design of a new cell site based on one or more base stations receiving a measurement from each of a plurality of connections and aggregating the measurements to form a database within a wireless communications network to detect areas of relative service weakness;
communicating to one or more third parties at least one message seeking one or more approvals to begin construction of the new cell site;
determining a plurality of resources that are required to complete construction of the new cell site based on data stored in the database; and
generating one or more responses to one or more queries related to the construction of the new cell site, the one or more responses based on data stored in the database.

### Claim 11 (depends on 10)

The method of claim 10, wherein a neural network determines the design of the new cell site, communicates the one or more documents to the one or more third parties, and determines the plurality of resources required to complete construction of the new cell site.

### Claim 12 (depends on 11)

The method of claim 11, wherein the data stored in the database further comprises field data, population data, data associated with a plurality of resources, data associated with a plurality of materials, and data associated with a return on investment.

### Claim 13 (depends on 11)

The method of claim 11, wherein determining the design of the new cell site further comprises determining when to begin construction of the new cell site, where to construct the new cell site, and how to construct the new cell site.

### Claim 14 (depends on 11)

The method of claim 11, wherein the data stored in the database is updated with a status of construction, wherein the status of construction comprises information associated with the construction of the new cell site.

### Claim 15 (depends on 11)

The method of claim 11, wherein the at least one message comprises an automatic email.

### Claim 16 (depends on 11)

The method of claim 11, wherein a generative artificial intelligence (AI) generates the one or more responses to the one or more queries.

### Claim 17 (depends on 11)

The method of claim 11, wherein an application programming interface (API) is used to cause display of the one or more responses to the one or more queries.

### Claim 18

A non-transitory computer readable media having instructions stored thereon that, when executed by one or more computer processing components, cause the one or more computer processing components to perform a method for generating project management attributes within a material allocation system, the method comprising:
determining a design of a new cell site based on one or more base stations receiving a measurement from each of a plurality of connections and aggregating the measurements to form a database within a wireless communications network to detect areas of relative service weakness;
communicating to one or more third parties at least one message seeking one or more approvals to begin construction of the new cell site;
determining a plurality of resources that are required to complete construction of the new cell site based on data stored in the database; and
generating one or more responses to one or more queries related to the construction of the new cell site, the one or more responses based on data stored in the database.

### Claim 19 (depends on 18)

The non-transitory computer storage media of claim 18, wherein a neural network determines the design of the new cell site, communicates the one or more documents to the one or more third parties, and determines the plurality of resources required to complete construction of the new cell site.

### Claim 20 (depends on 19)

The non-transitory computer storage media of claim 19, wherein a generative artificial intelligence (AI) generates the one or more responses to the one or more queries.
