# US 2026/0065234 A1 · Risk management based work order prioritization

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0065234 A1
- Document ID: US20260065234A1
- Status: Published application
- Kind: A1
- Application number: 18/824,641
- Filed: 2024-09-04
- Published: 2026-03-05
- Earliest claimed: 2024-09-04
- Assignees: Rockwell Automation Technologies, Inc.
- Applicants: Rockwell Automation Technologies, Inc.
- Inventors: Liudmila Domakhina; Mohammad Esmalifalak; Stuart Fergusson; Min Hua Yu; Hyo Jung S Son; Tareq Al-Masri
- Web page: https://patentgrep.com/patent/US20260065234A1

## CPC

- G06Q 10/20: Administration of product repair or maintenance
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 10/0635: Risk analysis of enterprise or organisation activities
- G06Q 10/087: Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A work order management system automates the process of scheduling maintenance tasks and generating corresponding work orders via analysis of monitored data generated by the industrial assets. The work order management system can monitor status and operational data from industrial devices on the plant floor and initiate creation of work orders based on a determination that the monitored industrial data indicates a current or predicted performance risk requiring investigation or maintenance. The system can leverage generative artificial intelligence (AI) or other types of AI in connection with determining when and how to schedule a maintenance task intended to mitigate asset risk. The system dynamically updates the work orders in response to changing contextual conditions within the plant to ensure that work order priority, scheduling, and resource allocations satisfy a defined maintenance optimization criterion.

## Claims

### Claim 1

A system, comprising:
a memory that stores executable components and work order data defining open work orders for performing maintenance tasks on industrial assets within an industrial facility; and
a processor, operatively coupled to the memory, that executes the executable components, the executable components comprising:
a user interface configured to receive, via interaction with a user interface rendered by the user interface component, inspection result data indicating results of an inspection performed on an industrial machine within the industrial facility;
an analysis component configured to, in response to determining that the inspection result data is indicative of a performance risk associated with the industrial machine, formulate one or more maintenance tasks designed to mitigate the performance risk; and
a work order generation component configured to generate a first work order to perform the one or more maintenance tasks and add the first work order to the open work orders,
wherein
the analysis component is further configured to, in response to generation of the first work order, determine, based on the one or more maintenance tasks, a modification to a second work order, of the open work orders, that causes the open work orders to implement a holistic maintenance strategy that satisfies defined maintenance optimization criteria, wherein the defined maintenance optimization criteria comprises at least minimization of a number of technicians required to execute the open work orders,
the work order generation component is further configured to implement the modification to the second work order, and
the analysis component is further configured to formulate and submit, based on the one or more maintenance tasks defined by the first work order, a prompt to a generative artificial intelligence (AI) model designed to obtain a response from the generative AI model used to determine the modification to the second work order.

### Claim 2 (depends on 1)

The system of claim 1, wherein the modification is at least one of a change to a priority level of the second work order, a change to a completion date of the second work order, a change to a scheduled time to perform maintenance tasks defined by the second work order, a change to an assignment of technicians to open second work order, or a change to a resource allocation for the second work order.

### Claim 3 (depends on 1)

The system of claim 1, wherein the inspection is at least one of a visual or tactile inspection of a component of the industrial machine, a test of manual or semi-automatic machine controls, a verification that a pathway for material or parts processed by the industrial machine is clear of obstructions, a machine safety check, or a fluid level check.

### Claim 4 (depends on 1)

The system of claim 1, wherein the defined maintenance optimization criteria further comprises at least one of maximization of overall maintenance efficiency, minimization of a total time to execute the open work orders, minimization of labor or material costs associated with execution of the open work orders, minimization of a number of autonomous vehicles required to execute the open work orders, or minimization of a number of steps taken by the technicians to complete the open work orders.

### Claim 5 (depends on 1)

The system of claim 1, further comprising a monitoring component configured to monitor industrial asset data generated by the industrial assets, wherein the industrial asset data comprises operational and status information for the industrial assets,
wherein
the analysis component is further configured to, in response to a determination, based on analysis of the industrial asset data, that a subset of the industrial asset data satisfies a condition indicative of a current or predicted risk to a first industrial asset of the industrial assets, formulate a maintenance task predicted to mitigate the current or predicted risk, and
the work order generation component is configured to, in response to the determination by the analysis component that the subset of the industrial data satisfies the condition, generate another work order prescribing the maintenance task.

### Claim 6 (depends on 1)

The system of claim 1,
further comprising a monitoring component is further configured to monitor schedule data that records current work schedules for technicians,
wherein
the analysis component is further configured to, in response to detecting, based on analysis of the schedule data, a change in a scheduled availability of one or more of the technicians, determine another modification to an open work order, of the open work orders, that causes the holistic maintenance strategy implemented by the open work orders to satisfy the defined maintenance optimization criteria based on the change in the scheduled availability, and
the work order generation component is further configured to implement the other modification on the open work order.

### Claim 7 (depends on 1)

The system of claim 1, wherein
further comprising a monitoring component is further configured to monitor inventory data that records current inventory levels of parts or materials used to perform maintenance tasks,
wherein
the analysis component is further configured to, in response to detecting, based on analysis of the inventory data, a change in the current inventory levels, determine another modification to an open work order, of the open work orders, that causes the holistic maintenance strategy implemented by the open work to satisfy the defined maintenance optimization criteria based on the change in the current inventory levels, and
the work order generation component is further configured to implement the other modification to the open work order.

### Claim 8

(canceled)

### Claim 9 (depends on 1)

The system of claim 1, wherein the analysis component is configured to determine the modification to the open work order based on a model trained with training data comprising at least one of technical specification data for the industrial assets, information from past work orders that were generated for the industrial assets, historical operational or status data for the industrial assets, information about technicians employed by the plant facility, or financial data for the plant facility.

### Claim 10

A method, comprising:
maintaining, by a system comprising a processor, open work orders for performing maintenance tasks on industrial assets within an industrial facility;
receiving, by the system via interaction with a user interface, inspection result data indicating results of an inspection performed on an industrial machine within the industrial facility; and
in response to determining that the inspection result data is indicative of a performance risk associated with the industrial machine:
formulating, by the system, one or more maintenance tasks designed to mitigate the performance risk;
generating, by the system, a first work order to perform the one or more maintenance tasks and adding the first work order to the open work orders;
in response to the generating of the first work order, determining, by the system based on the one or more maintenance tasks, a modification to a second work order, of the open work orders, that causes the open work orders to implement a holistic maintenance strategy that satisfies defined maintenance optimization criteria, wherein
the defined maintenance optimization criteria comprise at least minimization of a number of technicians required to execute the open work orders, and
the determining comprises formulating and submitting, based on the one or more maintenance tasks defined by the first work order, a prompt to a generative artificial intelligence (AI) model designed to obtain a response from the generative AI model used to determine the modification to the second work order; and
implementing, by the system, the modification to the second work order.

### Claim 11 (depends on 10)

The method of claim 10, wherein the modification is at least one of a change to a priority level of the second work order, a change to a completion date of second open work order, a change to a scheduled time to perform maintenance tasks defined by the second work order, a change to an assignment of technicians to the second work order, or a change to a resource allocation for the second work order.

### Claim 12 (depends on 10)

The method of claim 10, wherein the inspection is at least one of a visual or tactile inspection of a component of the industrial machine, a test of manual or semi-automatic machine controls, a verification that a pathway for material or parts processed by the industrial machine is clear of obstructions, a machine safety check, or a fluid level check.

### Claim 13 (depends on 10)

The method of claim 10, wherein the defined maintenance optimization criteria further comprise at least one of maximization of overall maintenance efficiency, minimization of a total time to execute the open work orders, minimization of labor or material costs associated with execution of the open work orders, minimization of a number of autonomous vehicles required to execute the open work orders, or minimization of a number of steps taken by the technicians to complete the open work orders.

### Claim 14 (depends on 10)

The method of claim 10, further comprising:
monitoring, by the system, industrial asset data generated by the industrial assets, wherein the industrial asset data comprises operational and status information for the industrial assets; and
in response to determining, based on analysis of the industrial asset data, that a subset of the industrial asset data satisfies a condition indicative of a current or predicted risk to a first industrial asset of the industrial assets:
formulating, by the system, a maintenance task predicted to mitigate the current or predicted risk; and
generating, by the system, another work order prescribing the maintenance task.

### Claim 15 (depends on 10)

The method of claim 10, further comprising:
monitoring, by the system, schedule data that records current work schedules for technicians; and
in response to detecting, based on analysis of the schedule data, a change in a scheduled availability of one or more of the technicians:
determining, by the system, another modification to an open work order, of the open work orders, that causes the holistic maintenance strategy implemented by the open work orders to satisfy the defined maintenance optimization criteria based on the change in the scheduled availability; and
implementing, by the system, the other modification to the open work order.

### Claim 16 (depends on 10)

The method of claim 10, further comprising:
monitoring, by the system, inventory data that records current inventory levels of parts or materials used to perform maintenance tasks; and
in response to detecting, based on analysis of the inventory data, a change in the current inventory levels:
determining, by the system, another modification to an open work order, of the open work orders, that causes the holistic maintenance strategy implemented by the open work orders to satisfy the defined maintenance optimization criteria based on the change in the current inventory levels; and
implementing, by the system, the other modification to the open work order.

### Claim 17

(canceled)

### Claim 18 (depends on 10)

The method of claim 10, wherein the determining of the modification to the second work order further comprises determining of the modification to the second work order based on a model trained with training data comprising at least one of technical specification data for the industrial assets, information from past work orders that were generated for the industrial assets, historical operational or status data for the industrial assets, information about technicians employed by the industrial facility, or financial data for the industrial facility.

### Claim 19

A non-transitory computer-readable medium having stored thereon instructions that, in response to execution, cause a work order management system comprising a processor to perform operations, the operations comprising:
maintaining open work orders for performing maintenance tasks on industrial assets within an industrial facility;
receiving, via interaction with a user interface rendered by the user interface component, inspection result data indicating results of an inspection performed on an industrial machine within the industrial facility; and
in response to determining that the inspection result data is indicative of a performance risk associated with the industrial machine:
formulating one or more maintenance tasks designed to mitigate the performance risk;
generating a first work order to perform the one or more maintenance tasks and adding the first work order to the open work orders;
in response to the generating of the first work order, determining a modification to a second work order, of the open work orders, that causes the open work orders to implement a holistic maintenance strategy that satisfies defined maintenance optimization criteria, wherein
the defined maintenance optimization criteria comprise at least minimization of a number of technicians required to execute the open work orders, and
the determining of the modification comprises formulating and submitting, based on the one or more maintenance tasks defined by the first work order, a prompt to a generative artificial intelligence (AI) model designed to obtain a response from the generative AI model used to determine the modification to the second work order; and
implementing the modification to the second work order.

### Claim 20 (depends on 19)

The non-transitory computer-readable medium of claim 19, wherein the modification is at least one of a change to a priority level of the second work order, a change to a completion date of the second work order, a change to a scheduled time to perform maintenance tasks defined by the second work order, a change to an assignment of technicians to the second work order, or a change to a resource allocation for the second work order.

### Claim 21 (depends on 9)

The system of claim 9, wherein the analysis component is configured to formulate the prompt further based on content of the model.

### Claim 22 (depends on 18)

The method of claim 18, wherein the formulating of the prompt comprises formulating the prompt further based on content of the model.
