# US 2026/0065193 A1 · System and Method of Discrete Planning for Process Industry

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0065193 A1
- Document ID: US20260065193A1
- Status: Published application
- Kind: A1
- Application number: 19/380,486
- Filed: 2025-11-05
- Published: 2026-03-05
- Earliest claimed: 2020-05-27
- Assignees: Blue Yonder Group, Inc.
- Applicants: Blue Yonder Group, Inc.
- Inventors: Raja Sekhar Kovvuri; Vikash Jalan; Nimish Bhatnagar; Aakash Garg
- Web page: https://patentgrep.com/patent/US20260065193A1

## CPC

- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06F 16/285: {Clustering or classification}
- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G06Q 10/08726: {for replenishment processing, procedures, or recommendations using forecasting or optimisation}
- G06Q 10/0875: Itemisation or classification of parts, supplies or services, e.g. bill of materials
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A system and method of supply chain planning of process industry production include a processor and memory and are configured to model a supply chain planning problem for two or more products of a process industry, wherein a coproduct is produced for at least one of the products, group the two or more products into groups, receive a weight and a yield for each raw material that produces each of the products in at least one of the groups, cluster each of the raw materials using weight-yield clustering, generate BOM grouping, and assign one BOM grouping to each of the raw materials of a single cluster.

## Claims

### Claim 1

A system for bill of material grouping, comprising:
a computer, comprising a processor and memory, the computer configured to:
determine part types for two or more raw materials;
determine cut types for the two or more raw materials;
calculate weights of finished goods produced from the raw materials;
generate clusters of finished goods using weight-yield clustering;
create bill of material groupings using the generated clusters;
model a supply chain planning problem using the bill of material groupings;
solve the supply chain planning problem; and
generate instructions based, at least in part, on the solved supply chain planning problem, wherein the generated instructions instruct one or more automated machines to produce processed goods for a meat processor.

### Claim 2 (depends on 1)

The system of claim 1, wherein the cut types comprise one or more of: block, sizing, dice and strip.

### Claim 3 (depends on 1)

The system of claim 1, wherein the part types comprise levels of importance.

### Claim 4 (depends on 1)

The system of claim 1, wherein solving the supply chain planning problem utilizes a flush technique that reduces an amount of meat produced.

### Claim 5 (depends on 1)

The system of claim 1, wherein the computer is further configured to:
in response to a missing weight value, calculate the missing weight value using a density and volume of a finished good.

### Claim 6 (depends on 1)

The system of claim 1, wherein the weight-yield clustering is calculated using a K-means method.

### Claim 7 (depends on 1)

The system of claim 1, wherein the computer is further configured to:
model the bill of material grouping into reverse bills of material to allow discrete planning of products of batch and continuous processing.

### Claim 8

A method for bill of material grouping, comprising:
determining, by a computer comprising a processor and memory, part types for two or more raw materials;
determining, by the computer, cut types for the two or more raw materials;
calculating, by the computer, weights of finished goods produced from the raw materials;
generating, by the computer, clusters of finished goods using weight-yield clustering;
creating, by the computer, bill of material groupings using the generated clusters;
modelling, by the computer, a supply chain planning problem using the bill of material groupings;
solving, by the computer, the supply chain planning problem, and
generating, by the computer, instructions based, at least in part, on the solved supply chain planning problem, wherein the generated instructions instruct one or more automated machines to produce processed goods for a meat processor.

### Claim 9 (depends on 8)

The method of claim 8, wherein the cut types comprise one or more of: block, sizing, dice and strip.

### Claim 10 (depends on 8)

The method of claim 8, wherein the part types comprise levels of importance.

### Claim 11 (depends on 8)

The method of claim 8, wherein solving the supply chain planning problem utilizes a flush technique that reduces an amount of meat produced.

### Claim 12 (depends on 8)

The method of claim 8, further comprising:
in response to a missing weight value, calculating, by the computer, the missing weight value using a density and volume of a finished good.

### Claim 13 (depends on 8)

The method of claim 8, wherein the weight-yield clustering is calculated using a K-means method.

### Claim 14 (depends on 8)

The method of claim 8, further comprising:
modelling, by the computer, the bill of material grouping into reverse bills of material to allow discrete planning of products of batch and continuous processing.

### Claim 15

A non-transitory computer-readable medium embodied with software for bill of material grouping, the software when executed:
determines part types for two or more raw materials;
determines cut types for the two or more raw materials;
calculates weights of finished goods produced from the raw materials;
generates clusters of finished goods using weight-yield clustering;
creates bill of material groupings using the generated clusters;
models a supply chain planning problem using the bill of material groupings;
solves the supply chain planning problem; and
generates instructions based, at least in part, on the solved supply chain planning problem, wherein the generated instructions instruct one or more automated machines to produce processed goods for a meat processor.

### Claim 16 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the cut types comprise one or more of: block, sizing, dice and strip.

### Claim 17 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the part types comprise levels of importance.

### Claim 18 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein solving the supply chain planning problem utilizes a flush technique that reduces an amount of meat produced.

### Claim 19 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the software when executed is further configured to:
in response to a missing weight value, calculate the missing weight value using a density and volume of a finished good.

### Claim 20 (depends on 15)

The non-transitory computer-readable medium of claim 15, wherein the weight-yield clustering is calculated using a K-means method.
