# US 2026/0065192 A1 · Control device and control method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0065192 A1
- Document ID: US20260065192A1
- Status: Published application
- Kind: A1
- Application number: 19/265,284
- Filed: 2025-07-10
- Published: 2026-03-05
- Earliest claimed: 2024-08-29
- Assignees: Toyota Jidosha Kabushiki Kaisha
- Applicants: Toyota Jidosha Kabushiki Kaisha
- Inventors: Yoshihiko ENDO
- Web page: https://patentgrep.com/patent/US20260065192A1

## CPC

- B60L 53/67: Controlling two or more charging stations
- G06Q 10/06315: {Needs-based resource requirements planning or analysis}
- G06Q 50/06: Energy or water supply
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A control device includes a control unit that compares a total electric power supply amount to be supplied from a system of a first area to the first area, and a total electric power consumption expected amount in the whole of the first area, calculates a first adjustment amount that is a difference when the total electric power supply amount exceeds the total electric power consumption expected amount, determines a second area that is a transmission destination of an electric power amount corresponding to all or part of the calculated first adjustment amount, and causes the system of the first area to obtain the electric power amount corresponding to all or part of the first adjustment amount preferentially from an electric power generation facility that utilizes electric power generation using natural energy and transmit the obtained electric power amount to a system of the second area.

## Claims

### Claim 1

A control device comprising a control unit that acquires a total electric power supply amount to be supplied from a system of a first area to the first area, the total electric power supply amount being measured by an electric power sensor, compares the acquired total electric power supply amount and a total electric power consumption expected amount calculated based on a charging plan of an electricity storage body present in the first area, the total electric power consumption expected amount being an electric power consumption expected amount of the whole of the first area including an electric power supply expected amount to the electricity storage body, calculates a first adjustment amount that is a difference when the total electric power supply amount exceeds the total electric power consumption expected amount, determines a second area that is an electric power transmission destination of an electric power amount corresponding to all or part of the calculated first adjustment amount, causes the system of the first area to obtain the electric power amount corresponding to all or part of the first adjustment amount preferentially from an electric power generation facility that utilizes electric power generation using natural energy, and causes the system of the first area to transmit the obtained electric power amount to a system of the second area.

### Claim 2

A control device comprising a control unit that compares a total electric power supply amount to be supplied from a system of a first area to the first area, and a total electric power consumption expected amount calculated based on a charging plan of an electricity storage body present in the first area, the total electric power consumption expected amount being an electric power consumption expected amount of the whole of the first area including an electric power supply expected amount to the electricity storage body, calculates a first adjustment amount that is a difference when the total electric power supply amount exceeds the total electric power consumption expected amount, determines a second area that is an electric power transmission destination of an electric power amount corresponding to all or part of the calculated first adjustment amount, causes the system of the first area to obtain the electric power amount corresponding to all or part of the first adjustment amount preferentially from an electric power generation facility that utilizes electric power generation using natural energy, and causes the system of the first area to transmit the obtained electric power amount to a system of the second area.

### Claim 3 (depends on 2)

The control device according to claim 2, wherein the control unit calculates a second adjustment amount that is a difference when the total electric power supply amount falls below the total electric power consumption expected amount, and requests a control device of an area other than the first area to transmit an electric power amount corresponding to all or part of the calculated second adjustment amount to the system of the first area from a system of the area.

### Claim 4 (depends on 2)

The control device according to claim 2, wherein the second area is an area in which a length of an electric power line connecting the system of the area and the system of the first area is the shortest or an area for which the second adjustment amount is the largest among areas for which the second adjustment amount that is a difference when the total electric power supply amount falls below the total electric power consumption expected amount is calculated.

### Claim 5 (depends on 2)

The control device according to claim 2, wherein the control unit notifies control devices of all areas of identification information of the second area and an electric power amount to be transmitted to the system of the second area.

### Claim 6

A control method to be executed by a control device, the control method comprising:
comparing a total electric power supply amount to be supplied from a system of a first area to the first area, and a total electric power consumption expected amount calculated based on a charging plan of an electricity storage body present in the first area, the total electric power consumption expected amount being an electric power consumption expected amount of the whole of the first area including an electric power supply expected amount to the electricity storage body;
calculating a first adjustment amount that is a difference when the total electric power supply amount exceeds the total electric power consumption expected amount;
determining a second area that is an electric power transmission destination of an electric power amount corresponding to all or part of the calculated first adjustment amount;
causing the system of the first area to obtain the electric power amount corresponding to all or part of the first adjustment amount preferentially from an electric power generation facility that utilizes electric power generation using natural energy; and
causing the system of the first area to transmit the obtained electric power amount to a system of the second area.