# US 2026/0064475 A1 · Methods, systems, and storage media for service adjustment based on iiot data centers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0064475 A1
- Document ID: US20260064475A1
- Status: Published application
- Kind: A1
- Application number: 19/382,219
- Filed: 2025-11-06
- Published: 2026-03-05
- Earliest claimed: 2025-04-14
- Assignees: Chengdu Qinchuan Iot Technology Co., Ltd.
- Applicants: Chengdu Qinchuan Iot Technology Co., Ltd.
- Inventors: Hanshu SHAO
- Web page: https://patentgrep.com/patent/US20260064475A1

## CPC

- G06F 9/5027: {the resource being a machine, e.g. CPUs, Servers, Terminals}
- G06F 9/5066: {Algorithms for mapping a plurality of inter-dependent sub-tasks onto a plurality of physical CPUs (mappping at compile time, see G06F8/451)}
- G06F 9/48: Program initiating; Program switching, e.g. by interrupt
- G06F 9/4881: {Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues}
- G06F 9/50: Allocation of resources, e.g. of the central processing unit [CPU]
- G06F 9/5005: {to service a request}
- G06F 9/5038: {considering the execution order of a plurality of tasks, e.g. taking priority or time dependency constraints into consideration (scheduling strategies G06F9/4881 and subgroups)}
- G06F 9/5044: {considering hardware capabilities}
- G06F 9/505: {considering the load}
- G06F 9/5061: {Partitioning or combining of resources}
- G06F 9/5077: {Logical partitioning of resources; Management or configuration of virtualized resources (specific details on emulation or internal functioning of virtual machines G06F9/455)}
- G06F 2209/5017: Task decomposition
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

Provided are a method, a system, and a storage medium for service adjustment based on an IIoT data center. The system includes a management platform, the IIoT data center, and a plurality of data sub-platforms in communication with each other. The management platform is configured to: obtain operational features of the plurality of data sub-platforms; determine a first sub-platform and one or more second sub-platforms based on the operational features; determine at least one service to be split, and split the at least one service to be split into a plurality of sub-services; determine processing resource demands corresponding to the sub-services; determine a service adjustment parameter; and generate a service adjustment instruction based on the service adjustment parameter, and send the service adjustment instruction to the first sub-platform and the one or more second sub-platforms, so as to allocate the plurality of sub-services to the one or more second sub-platforms.

## Claims

### Claim 1

A system for service adjustment based on an Industrial Internet of Things (IIoT) data center, comprising a management platform, the IIoT data center, and a plurality of data sub-platforms, wherein the management platform, the IIoT data center, and the plurality of data sub-platforms are in communication with each other, the management platform is configured on a server or a processor, the IIoT data center is configured as a storage device, the plurality of data sub-platforms are configured on a plurality of servers or a plurality of processors, respectively, and the management platform is configured to:
obtain operational features of the plurality of data sub-platforms via the plurality of data sub-platforms;
determine a first sub-platform and one or more second sub-platforms among the plurality of data sub-platforms based on the operational features, wherein the first sub-platform refers to a data sub-platform that requires offloading service to other sub-platforms;
determine at least one service to be split based on the operational features and service features corresponding to a plurality of services of the first sub-platform, and split the at least one service to be split into a plurality of sub-services;
determine processing resource demands corresponding to the plurality of sub-services;
determine a service adjustment parameter based on the processing resource demands and the operational features; and
generate a service adjustment instruction based on the service adjustment parameter, and send the service adjustment instruction to the first sub-platform and the one or more second sub-platforms, so as to allocate the plurality of sub-services to the one or more second sub-platforms.

### Claim 2 (depends on 1)

The system of claim 1, wherein
the first sub-platform is configured to:
obtain a plurality of data packages by performing data processing on the plurality of sub-services based on the service adjustment instruction; and
send the plurality of data packages to the second sub-platform;
the one or more second sub-platforms are configured to:
receive the plurality of data packages;
determine data volumes of the plurality of data packages by parsing the plurality of data packages;
obtain parsed data by allocating corresponding parsing memory for the plurality of data packages based on the data volumes and parsing the plurality of data packages;
establish processes corresponding to the plurality of sub-services based on the parsed data; and
determine processing resources for executing the processes based on the service adjustment instruction.

### Claim 3 (depends on 1)

The system of claim 1, wherein the management platform is further configured to:
for a service to be split among the at least one service to be split:
obtain a plurality of candidate splitting schemes;
determine a target splitting scheme based on a plurality of data transmission durations and a plurality of service operation efficiencies corresponding to the plurality of candidate splitting schemes; and
obtain a plurality of sub-services corresponding to the service to be split by splitting the service to be split based on the target splitting scheme.

### Claim 4 (depends on 3)

The system of claim 3, wherein the management platform is further configured to:
for a candidate splitting scheme among the at least one candidate splitting scheme:
determine sub-service data volumes corresponding to a plurality of candidate sub-services based on sub-service features corresponding to the plurality of candidate sub-services in the candidate splitting scheme and a data feature of the service to be split;
determine a first transmission volume based on the sub-service data volumes;
determine a data transmission duration corresponding to the candidate splitting scheme based on the first transmission volume and an available communication bandwidth; and
determine a service operation efficiency corresponding to the candidate splitting scheme based on a service feature of the service to be split, the operational features, and the sub-service features corresponding to the plurality of candidate sub-services.

### Claim 5 (depends on 4)

The system of claim 4, wherein the management platform is further configured to:
obtain a plurality of candidate transmission schemes;
determine second transmission volumes corresponding to the plurality of candidate transmission schemes based on the sub-service data volumes; and
obtain the first transmission volume based on the second transmission volumes.

### Claim 6 (depends on 4)

The system of claim 4, wherein the management platform is further configured to:
determine the service operation efficiency via an efficiency prediction model based on processing resource demands corresponding to the plurality of candidate sub-services and the operational features, the efficiency prediction model being a machine learning model.

### Claim 7 (depends on 3)

The system of claim 3, wherein the management platform is further configured to:
obtain the plurality of candidate splitting schemes by performing a plurality of splits on the service to be split through functional-item division and data-item division.

### Claim 8 (depends on 7)

The system of claim 7, wherein the management platform is further configured to:
divide data items of the service to be split based on historical invocation information and a data-item feature of the service to be split.

### Claim 9 (depends on 1)

The system of claim 1, wherein the management platform is further configured to:
determine a plurality of candidate allocation relationships based on the processing resource demands and the operational features, and determine predicted operational information corresponding to the plurality of candidate allocation relationships;
determine a target allocation relationship based on the predicted operational information; and
determine the service adjustment parameter based on the target allocation relationship.

### Claim 10

A method for service adjustment based on an Industrial Internet of Things (IIoT) data center, the method being executed by a management platform of a system for service adjustment based on the IIoT data center, wherein the system comprises the management platform, the IIoT data center, and a plurality of data sub-platforms, the management platform, the IIoT data center, and the plurality of data sub-platforms are in communication with each other, and the method comprises:
obtaining operational features of the plurality of data sub-platforms via the plurality of data sub-platforms;
determining a first sub-platform and one or more second sub-platforms among the plurality of data sub-platforms based on the operational features, wherein the first sub-platform refers to a data sub-platform that requires offloading service to other sub-platforms;
determining at least one service to be split based on the operational features and service features corresponding to a plurality of services of the first sub-platform, and splitting the at least one service to be split into a plurality of sub-services;
determining processing resource demands corresponding to the plurality of sub-services;
determining a service adjustment parameter based on the processing resource demands and the operational features; and
generating a service adjustment instruction based on the service adjustment parameter, and sending the service adjustment instruction to the first sub-platform and the one or more second sub-platforms, so as to allocate the plurality of sub-services to the one or more second sub-platforms.

### Claim 11 (depends on 10)

The method of claim 10, wherein
the first sub-platform is configured to:
obtain a plurality of data packages by performing data processing on the plurality of sub-services based on the service adjustment instruction; and
send the plurality of data packages to the second sub-platform;
the one or more second sub-platforms are configured to:
receive the plurality of data packages;
determine data volumes of the plurality of data packages by parsing the plurality of data packages;
obtain parsed data by allocating corresponding parsing memory for the plurality of data packages based on the data volumes and parsing the plurality of data packages;
establish processes corresponding to the plurality of sub-services based on the parsed data; and
determine processing resources for executing the processes based on the service adjustment instruction.

### Claim 12 (depends on 10)

The method of claim 10, wherein the splitting the at least one service to be split into a plurality of sub-services includes:
for a service to be split among the at least one service to be split:
obtaining a plurality of candidate splitting schemes;
determining a target splitting scheme based on a plurality of data transmission durations and a plurality of service operation efficiencies corresponding to the plurality of candidate splitting schemes; and
obtaining a plurality of sub-services corresponding to the service to be split by splitting the service to be split based on the target splitting scheme.

### Claim 13 (depends on 12)

The method of claim 12, further comprising:
for a candidate splitting scheme among the at least one candidate splitting scheme:
determining sub-service data volumes corresponding to the plurality of candidate sub-services based on sub-service features corresponding to a plurality of candidate sub-services in the candidate splitting scheme and a data feature of the service to be split;
determining a first transmission volume based on the sub-service data volumes;
determining a data transmission duration corresponding to the candidate splitting scheme based on the first transmission volume and an available communication bandwidth; and
determining a service operation efficiency of the service to be split based on a service feature of the service to be split, the operational features, and the sub-service features corresponding to the plurality of candidate sub-services.

### Claim 14 (depends on 13)

The method of claim 13, wherein the determining a first transmission volume based on the sub-service data volumes includes:
obtaining a plurality of candidate transmission schemes;
determining second transmission volumes corresponding to the plurality of candidate transmission schemes based on the sub-service data volumes; and
obtaining the first transmission volume based on the second transmission volumes.

### Claim 15 (depends on 13)

The method of claim 13, wherein the determining a service operation efficiency of the service to be split based on a service feature of the service to be split, the operational features, and the sub-service features corresponding to the plurality of candidate sub-services includes:
determining the service operation efficiency via an efficiency prediction model based on processing resource demands corresponding to the plurality of candidate sub-services and the operational features, the efficiency prediction model being a machine learning model.

### Claim 16 (depends on 12)

The method of claim 12, wherein the obtaining a plurality of candidate splitting schemes includes:
obtaining the plurality of candidate splitting schemes by performing a plurality of splits on the service to be split through functional-item division and data-item division.

### Claim 17 (depends on 16)

The method of claim 16, wherein the data-item division includes:
dividing data items of the service to be split based on historical invocation information and a data-item feature of the service to be split.

### Claim 18 (depends on 10)

The method of claim 10, wherein the determining a service adjustment parameter based on the processing resource demands and the operational features includes:
determining a plurality of candidate allocation relationships based on the processing resource demands and the operational features, and determining predicted operational information corresponding to the plurality of candidate allocation relationships;
determining a target allocation relationship based on the predicted operational information; and
determining the service adjustment parameter based on the target allocation relationship.

### Claim 19

A non-transitory computer-readable storage medium storing one or more sets of computer instructions, wherein when reading the one or more sets of computer instructions in the storage medium, a computer implements a method for service adjustment based on an Industrial Internet of Things (IIoT) data center, the method is executed by a management platform of a system for service adjustment based on the IIoT data center, the system comprises the management platform, the IIoT data center, and a plurality of data sub-platforms, the management platform, the IIoT data center, and the plurality of data sub-platforms are in communication with each other, and the method comprises:
obtaining operational features of the plurality of data sub-platforms via the plurality of data sub-platforms;
determining a first sub-platform and one or more second sub-platforms among the plurality of data sub-platforms based on the operational features, wherein the first sub-platform refers to a data sub-platform that requires offloading service to other sub-platforms;
determining at least one service to be split based on the operational features and service features corresponding to a plurality of services of the first sub-platform, and splitting the at least one service to be split into a plurality of sub-services;
determining processing resource demands corresponding to the plurality of sub-services;
determining a service adjustment parameter based on the processing resource demands and the operational features; and
generating a service adjustment instruction based on the service adjustment parameter and sending the service adjustment instruction to the first sub-platform and the one or more second sub-platforms, so as to allocate the plurality of sub-services to the one or more second sub-platforms.