# US 2026/0064148 A1 · System and method for a charging station

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0064148 A1
- Document ID: US20260064148A1
- Status: Published application
- Kind: A1
- Application number: 19/297,608
- Filed: 2025-08-12
- Published: 2026-03-05
- Earliest claimed: 2014-06-20
- Assignees: Transportation IP Holdings, LLC
- Applicants: Transportation IP Holdings, LLC
- Inventors: Santosh Sambamoorthy Veda; Robert Dean King; Irene Michelle Berry; Zhi Zhou; Matthew Christian Nielsen; Lembit Salasoo
- Web page: https://patentgrep.com/patent/US20260064148A1

## CPC

- G05F 1/70: Regulating power factor; Regulating reactive current or power
- G05F 1/66: Regulating electric power
- G06F 1/26: Power supply means, e.g. regulation thereof (for memories G11C)
- G06Q 50/06: Energy or water supply
- H02J 3/008: Circuit arrangements for power supply or distribution technologies responsive to energy trading
- H02J 3/16: by adjustment of reactive power
- H02J 3/322: {the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging}
- H02J 3/388: Arrangements for the handling of islanding, e.g. for disconnection or for avoiding the disconnection of power
- H02J 3/48: Controlling the sharing of active power
- H02J 3/50: Controlling the sharing of reactive power
- H02J 7/02: for charging batteries from AC mains by converters
- H02J 13/00: Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J 13/1321: {using a wired telecommunication network or a data transmission bus}
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/12: Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
- Y02B 70/30: Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 40/70: Smart grids as climate change mitigation technology in the energy generation sector
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02P 80/10: Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- Y02T 90/14: Plug-in electric vehicles
- Y02T 90/16: Information or communication technologies improving the operation of electric vehicles
- Y02T 90/167: Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
- Y04S 10/123: the energy generation units being or involving renewable energy sources
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 20/12: Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
- Y04S 20/221: General power management systems
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- Y04S 30/12: Remote or cooperative charging
- Y04S 40/124: using wired telecommunication networks or data transmission busses
- Y04S 50/10: Energy trading, including energy flowing from end-user application to grid
- G05F: SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A system is provided having one or more charging stations that are electrically coupled with a power distribution grid and that may selectively couple with one or more energy storage devices; and a controller that may control transfer of electric power between the one or more charging stations, the one or more energy storage devices, and the power distribution grid. The controller may determine the amount of electric power transferred based at least in part on one or both of an assessment value.

## Claims

### Claim 1

A method comprising:
controlling transfer of electric power between one or more charging stations, one or more energy storage devices, and a power distribution grid that is electrically coupled to the one or more charging stations, and the one or more energy storage devices being disposed on a vehicle;
charging or discharging, selectively, one or more energy storage devices via the one or more charging stations;
scheduling one or times that the vehicle can supply to or draw from the power distribution grid the electric power via the one or more charging stations, and thereby to obtain a scheduled time;
determining a draw magnitude to or from the power distribution grid via the one or more charging stations; and
controlling active power, reactive power, or both active and reactive power of the electric power based at least in part on the scheduled time and the draw magnitude.

### Claim 2 (depends on 1)

The method of claim 1, further comprising determining one or more transfer times for the vehicle based at least in part on the scheduled time and on the draw magnitude.

### Claim 3 (depends on 2)

The method of claim 2, generating a control signal based at least in part on at least one of the transfer time, the scheduled time, and the draw magnitude.

### Claim 4

A method of power control for a charging station, comprising the steps of:
conducting an assessment of electrical loads on a power distribution grid, the power distribution grid being electrically coupled to the charging station;
determining an available capacity of an energy storage device that is connected to the charging station to provide active power support, reactive power support, or both, to the power distribution grid;
selecting one or more types of power control to be carried out; and
issuing a power dispatch command to the charging station to provide active power support, reactive power support, or both, to the power distribution grid, and the power dispatch command being based at least in part on the determined available capacity of the energy storage device.

### Claim 5 (depends on 4)

The method of claim 4, wherein the energy storage device is one of a plurality of energy storage devices and the charging station is one of a plurality of charging stations coupled to the power distribution grid, and the determining the available capacity comprises summing individual capacities of all of the plurality of energy storage devices electrically connected to the power distribution grid through one of the plurality of charging stations.

### Claim 6 (depends on 4)

The method of claim 4, wherein conducting the assessment of electrical loads on the power distribution grid comprises one or more of a load assessment, capacity assessment, reactive capacity assessment, voltage assessment, and reactive power assessment.

### Claim 7 (depends on 6)

The method of claim 6, wherein the power control type selection is based at least in part on the assessment.

### Claim 8 (depends on 6)

The method of claim 6, wherein the assessment is conducted in real-time.

### Claim 9 (depends on 6)

The method of claim 6, wherein the assessment is based at least in part on a charging profile, load cycle profile, asset information, and status of the energy storage device.
