# US 2026/0064092 A1 · Predictive hydrogen grid optimization

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0064092 A1
- Document ID: US20260064092A1
- Status: Published application
- Kind: A1
- Application number: 18/818,249
- Filed: 2024-08-28
- Published: 2026-03-05
- Earliest claimed: 2024-08-28
- Assignees: ZeroAvia, Inc.
- Applicants: ZeroAvia, Inc.
- Inventors: Ro Kirchev; Parker Bryant; Arnab Chatterjee; Ewan Harry-Thomas; Aleksei Bolisov; Oleksii Kononenko; Alexey Vorobyev; Yury Maximov; Aleksei Ivanov
- Web page: https://patentgrep.com/patent/US20260064092A1

## CPC

- G05B 13/048: {using a predictor}
- G05B 13/042: {in which a parameter or coefficient is automatically adjusted to optimise the performance}
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Methods and systems for optimizing hydrogen fuel production facilities include processing user input data and sensor data from hardware sensors of a hydrogen fuel production facility with a computerized device to model at least one microgrid hydrogen-generating plant. A three-stage convex optimization model is operated on the computerized device to determine at least one implementation parameter of the microgrid hydrogen-generating plant. At least one hardware component of the microgrid hydrogen-generating plant is modeled. The hardware components include at least an electrolyzer. A model predictive control (MPC) controller is used to determine an optimal power flow schedule for a selected control scenario and schedule module, thereby optimizing the generated sensor data and the user input data over a time series window.

## Claims

### Claim 1

A method for optimizing a hydrogen fuel production facility, the method comprising:
generating sensor data from at least one hardware sensor of a hydrogen fuel production facility;
receiving, in a computerized device, the generated sensor data and user input data, wherein the generated sensor data and the user input data are stored on a non-transitory memory of the computerized device;
processing, with at least one processor of the computerized device, at least a portion of the generated sensor data and the user input data to model at least one microgrid hydrogen-generating plant by:
using a three-stage convex optimization model operated on the computerized device to determine at least one implementation parameter of the microgrid hydrogen-generating plant;
modeling at least one hardware component of the microgrid hydrogen-generating plant, wherein the at least one hardware component include at least an electrolyzer; and
using a model predictive control (MPC) controller to determine an optimal power flow schedule for a selected control scenario and schedule module, thereby optimizing the generated sensor data and the user input data over a time series window.

### Claim 2 (depends on 1)

The method of claim 1, wherein the time series window further comprises at least one of: a real-time or operator-defined time scale.

### Claim 3 (depends on 1)

The method of claim 1, wherein modeling the hardware component of the microgrid hydrogen-generating plant further comprises simulating the hardware component to predict performance of the microgrid hydrogen-generating plant.

### Claim 4 (depends on 3)

The method of claim 3, wherein the hardware component of the microgrid hydrogen-generating plant further comprises a flow meter, wherein modeling the at least one hardware component further comprises using a sampling module to sample hydrogen demand based at least on a reading from the flow meter.

### Claim 5 (depends on 1)

The method of claim 1, wherein the at least one implementation parameter of the microgrid hydrogen-generating plant further comprises at least one of aviation hydrogen fuel demand, hydrogen-fuel-powered aircraft parameters, airport parameters, or hydrogen fuel storage infrastructure parameters.

### Claim 6 (depends on 1)

The method of claim 1, wherein modeling the at least one hardware component of the microgrid hydrogen-generating plant further comprises modeling at least one of an electric energy generation subsystem, a battery energy storage system, or a hydrogen fuel cell.

### Claim 7 (depends on 1)

The method of claim 1, wherein using the MPC controller further comprises analyzing a techno-economic condition and a plant energy management system with at least one artificial intelligence (AI) data model.

### Claim 8 (depends on 7)

The method of claim 7, wherein analyzing the plant energy management system further comprises analysis of actions, environmental parameters, feedback parameters, and internal states of the microgrid hydrogen-generating plant.

### Claim 9 (depends on 1)

The method of claim 1, wherein modeling the microgrid hydrogen-generating plant further comprises detecting anomalies using an observation database.

### Claim 10 (depends on 1)

The method of claim 1, wherein modeling the hardware component of the microgrid hydrogen-generating plant further comprises generating a constant approximation of electrolyzer efficiency as a function of power.

### Claim 11

A system for optimizing a hydrogen fuel production facility comprising:
at least one hardware sensor of a hydrogen fuel production facility generating sensor data;
a computerized device receiving the generated sensor data and user input data, wherein the generated sensor data and the user input data are stored on a non-transitory memory of the computerized device;
at least one processor of the computerized device, wherein at least a portion of the generated sensor data and the user input data are used to model at least one microgrid hydrogen-generating plant by:
using a three-stage convex optimization model operated on the computerized device to determine at least one implementation parameter of the microgrid hydrogen-generating plant;
modeling at least one hardware component of the microgrid hydrogen-generating plant, wherein the hardware components include at least an electrolyzer; and
using a model predictive control (MPC) controller to determine an optimal power flow schedule for a selected control scenario and schedule module, thereby optimizing the generated sensor data and the user input data over a time series window.

### Claim 12 (depends on 11)

The system of claim 11, wherein the time series window further comprises at least one of: a real-time or an operator-defined time scale.

### Claim 13 (depends on 11)

The system of claim 11, wherein modeling the hardware component of the microgrid hydrogen-generating plant further comprises simulating the hardware component to predict performance of the microgrid hydrogen-generating plant.

### Claim 14 (depends on 13)

The system of claim 13, wherein the hardware component of the microgrid hydrogen-generating plant further comprises a flow meter, wherein modeling the at least one hardware component further comprises using a sampling module to sample hydrogen demand based at least on a reading from the flow meter.

### Claim 15 (depends on 11)

The system of claim 11, wherein the at least one implementation parameter of the microgrid hydrogen-generating plant further comprises at least one of aviation hydrogen fuel demand, hydrogen-fuel-powered aircraft parameters, airport parameters, or hydrogen fuel storage infrastructure parameters.

### Claim 16 (depends on 11)

The system of claim 11, wherein modeling the at least one hardware component of the microgrid hydrogen-generating plant further comprises modeling at least one of an electric energy generation subsystem, a battery energy storage system, or a hydrogen fuel cell.

### Claim 17 (depends on 11)

The system of claim 11, wherein using the MPC controller further comprises analyzing a techno-economic condition and a plant energy management system with at least one artificial intelligence (AI) data model.

### Claim 18 (depends on 17)

The system of claim 17, wherein analyzing the plant energy management system further comprises analysis of actions, environmental parameters, feedback parameters, and internal states of the microgrid hydrogen-generating plant.

### Claim 19 (depends on 11)

The system of claim 11, wherein modeling the microgrid hydrogen-generating plant further comprises detecting anomalies using an observation database.

### Claim 20 (depends on 11)

The system of claim 11, wherein modeling the hardware component of the microgrid hydrogen-generating plant further comprises generating a constant approximation of electrolyzer efficiency as a function of power.
