# US 2026/0062615 A1 · Treatment process for the stabilization of soils

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0062615 A1
- Document ID: US20260062615A1
- Status: Published application
- Kind: A1
- Application number: 19/315,274
- Filed: 2025-08-29
- Published: 2026-03-05
- Earliest claimed: 2024-08-29
- Assignees: Holcim Technology Ltd
- Applicants: Holcim Technology Ltd.
- Inventors: Mehran Movahedrad; Nouffou Tapsoba; Nicolas Richard; Jean-Pierre Charvolin
- Web page: https://patentgrep.com/patent/US20260062615A1

## CPC

- C09K 17/10: Cements, e.g. Portland cement
- C04B 14/361: {Soil, e.g. laterite}
- C04B 28/04: Portland cements
- C04B 28/08: Slag cements
- E01C 3/04: Foundations produced by soil stabilisation {(soil stabilisation for road building in general E01C7/36)}
- E01C 21/00: Apparatus or processes for surface {soil} stabilisation for road building or like purposes, e.g. mixing local aggregate with binder ({recycling in place or on the road involving soil stabilisation E01C23/065} ; stabilising soil under existing surfacing E01C23/10; soil-conditioning or soil-stabilising materials C09K17/00; soil consolidation in general E02D3/12)
- E02D 3/12: Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D5/46; soil-conditioning or soil-stabilising materials C09K17/00; consolidation of ground around boreholes or wells E21B43/025)
- C04B 2111/0006: {for obtaining materials with the consistency of soil}
- C04B 2111/00732: {for soil stabilisation}
- C04B 2111/00741: {Preventing erosion}
- C09K: MATERIALS FOR MISCELLANEOUS APPLICATIONS, NOT PROVIDED FOR ELSEWHERE
- C04B: LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE {(roofing granules E04D7/005)}; CERAMICS (devitrified glass-ceramics C03C10/00); REFRACTORIES; TREATMENT OF NATURAL STONE
- E01C: CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR (forming roads or like surfaces by compacting or grading snow or ice E01H)
- E02D: FOUNDATIONS; EXCAVATIONS; EMBANKMENTS (specially adapted for hydraulic engineering E02B); UNDERGROUND OR UNDERWATER STRUCTURES {(tunnels, tunnelling, mining E21)}

## Abstract

A process for stabilizing soil, including (i) pre-treating the soil with calcium carbide slag, then (ii) treating the pre-treated soil of step (i) with a hydraulic road binder. The use of calcium carbide slag as pre-treatment for stabilizing soil.

## Claims

### Claim 1

A process for stabilizing soil, comprising:
i. pre-treating the soil with calcium carbide slag, then
ii. treating the pre-treated soil of step (i) with a hydraulic road binder.

### Claim 2 (depends on 1)

The process according to claim 1, wherein the hydraulic road binder is a hydraulic road binder as defined in NF EN 13282-1 of May 2014 or NF EN 13282-2 of September 2015.

### Claim 3 (depends on 1)

The process according to claim 1, wherein the hydraulic road binder is a CEM II as defined in NF EN 197-1 of April 2012.

### Claim 4 (depends on 1)

The process according to claim 1, wherein the pre-treatment step (i) comprises contacting the soil with calcium carbide slag for at least 2 hours and up to 7 days.

### Claim 5 (depends on 1)

The process according to claim 1, wherein the pre-treatment step (i) consists in mixing the soil with calcium carbide slag, in an amount ranging from 0.5 to 7 wt. % of calcium carbide slag, by weight relative to the amount of the dry soil weight.

### Claim 6 (depends on 1)

The process according to claim 1, wherein the pre-treatment step (i) consists in mixing the soil with calcium carbide slag, in an amount ranging from 1 to 6 wt. % of calcium carbide slag, by weight relative to the amount of the dry soil weight.

### Claim 7 (depends on 1)

The process according to claim 1, wherein the treatment step (ii) consists in mixing the pre-treated soil with the hydraulic road binder, in an amount ranging from 2 to 15 wt. %, by weight relative to the amount of the dry soil weight.

### Claim 8 (depends on 1)

The process according to claim 1, further comprising step (iii) of compacting the treated soil of step (ii).

### Claim 9 (depends on 1)

The process according to claim 1, wherein the soil is an unstable soil:
having a plasticity index greater than 20 according to standard NF EN ISO 17892-12 of March 2022, and/or
being clay-rich having a Methylene Blue Value greater than 4 g/100 g of dry soil, according to standard NF EN 17542-3 of June 2022, and/or
containing more than 0.3 wt. % of total organic carbon, and/or
having 35 wt. % or more of fines, defined by the weight ratio relative to the total dry mass of the soil of particles passing at 0.08 mm by dry sieving according to standard NF EN 933-1 of May 2012

### Claim 10 (depends on 9)

The process according to claim 9, wherein the unstable soil is a black cotton soil.

### Claim 11 (depends on 1)

A process for constructing a civil engineering structure, comprising stabilizing the soil according to claim 1, prior to constructing said engineering structure.

### Claim 12

Use of calcium carbide slag as a pre-treatment agent for stabilizing soil, wherein the use further comprises a subsequent treatment of the calcium carbide slag-pre-treated soil with a hydraulic road binder.

### Claim 13 (depends on 12)

The use according to claim 12, wherein calcium carbide slag is in an amount ranging from 0.5 to 7 wt. % of calcium carbide slag, by weight relative to the amount of the dry soil weight.

### Claim 14 (depends on 3)

The process of claim 3, wherein the hydraulic road binder is CEM II B/L cement.

### Claim 15 (depends on 7)

The process according to claim 7, wherein the amount of the hydraulic road binder ranges from 3 to 10 wt. %, by weight relative to the amount of the dry soil weight.

### Claim 16 (depends on 9)

The process according to claim 9, the unstable soil being an A4 soil according to the GTR standard NF P 11 300 (September 1992).