# US 2026/0043315 A1 · Remote Well Stimulation Method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0043315 A1
- Document ID: US20260043315A1
- Status: Published application
- Kind: A1
- Application number: 19/099,872
- Filed: 2023-07-29
- Published: 2026-02-12
- Earliest claimed: 2022-08-01
- Assignees: C-Innovation, LLC
- Applicants: C-Innovation, LLC
- Inventors: Nathan Wolford; David Sheetz
- Web page: https://patentgrep.com/patent/US20260043315A1

## CPC

- E21B 43/013: Connecting a production flow line to an underwater well head
- E21B 41/0007: {for underwater installations (E21B41/005, E21B41/04, E21B41/06, E21B41/08, E21B41/10 take precedence)}
- E21B 41/04: Manipulators for underwater operations, e.g. temporarily connected to well heads
- E21B 43/017: Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
- E21B 43/25: Methods for stimulating production {(by vibrating earth formations E21B43/003)}
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

## Abstract

A method for stimulation of a subsea oil and gas well is provided, comprising the deploying a tree cap on a subsea well using a remotely operated vehicle (ROV), wherein the tree cap includes one or more fluid receptacles; deploying a rigless stimulation tool (RST) in a predetermined location on the sea floor away from the well and other subsea production system infrastructure; deploying at least one flexible well service jumper (WSJ) conduit having a first end connector and a second end connector from a well stimulation vessel (WSV), where the WSJ conduit includes a plurality of attached buoyant members sufficient to enable movement by the ROV under an overhead obstacle, such as a mobile offshore drilling unit (MODU) or platform; operating the ROV to move the first end connector of the WSJ conduit to a first location near the tree cap and temporarily securing the securing the first end connector to the tree frame sufficient to enable flushing of the WSJ conduit with a hydrate inhibitor fluid; connecting the first end of the WSJ conduit to the tree cap; operating the ROV to connect fluid stimulation conduits to the RST to enable a fluidic connection; and delivering a well stimulation fluid via the fluid stimulation conduits through the RST and via the WSJ conduit to the well.

## Claims

### Claim 1

A method for stimulation of a subsea oil and gas well, comprising:
(a) deploying a tree cap on a subsea well using a remotely operated vehicle (ROV), wherein the tree cap includes one or more fluid receptacles;
(b) deploying a rigless stimulation tool (RST) in a predetermined location on the sea floor away from the well and other subsea production system infrastructure;
(c) deploying at least one flexible well service jumper (WSJ) conduit having a first end connector and a second end connector from a well stimulation vessel (WSV), where the WSJ conduit includes a plurality of attached buoyant members sufficient to enable movement by the ROV under an overhead obstacle, such as a mobile offshore drilling unit (MODU) or platform;
(d) operating the ROV to move the first end connector of the WSJ conduit to a first location near the tree cap and temporarily securing the securing the first end connector to the tree frame sufficient to enable flushing of the WSJ conduit with a hydrate inhibitor fluid;
(e) operating a crane on the WSV to lower the WSJ conduit along a predetermined route away from the tree cap toward the RST;
(f) operating the ROV to connect the second end connector of the WSJ conduit to the RST to enable a fluidic connection;
(g) operating the ROV having an onboard supply of the hydrate inhibitor fluid and delivering the fluid through the WSJ conduit to displace water within the WSJ conduit;
(h) connecting the first end of the WSJ conduit to the tree cap;
(i) positioning the WSV in a safe overboarding zone (SOZ);
(j) while the WSV is positioned in a SOZ, deploying one or more fluid stimulation conduits from the WSV, wherein each of the fluid stimulation conduits has a first end connector and a second end connector, and wherein the first end connector is fluidically connected to a coiled tubing line on the WSV;
(k) operating the ROV to connect the second end connectors of the fluid stimulation conduits to the RST to enable a fluidic connection; and

### Claim at position 2

(1) delivering a well stimulation fluid via the fluid stimulation conduits through the RST and via the WSJ conduit to the well.

### Claim 2 (depends on 1)

The method of claim 1, wherein the RST is mounted on a mudmat or suction pile.

### Claim 3 (depends on 1)

The method of claim 1, wherein during deployment of the WSJ conduit between the well and the RST by the ROV, the WSJ conduit is supported by one or more buoyant members.

### Claim 4 (depends on 1)

The method of claim 1, wherein the fluid stimulation conduits are connected to the coiled tubing lines via passive breakaway, such as mid line weak link (MLWL), connectors.

### Claim 5 (depends on 1)

The method of claim 1, wherein each of the coiled tubing lines include clump weights, and wherein the fluid stimulation conduits are lowered to a position where the clump weights are about 50-100 feet above the sea floor.

### Claim 6 (depends on 1)

The method of claim 1, wherein the fluid stimulation conduits are deployed via a pendant cable from the WSV, and wherein the pendant cable is disconnected when the fluid stimulation conduits are in a substantially vertical orientation.

### Claim 7 (depends on 1)

The method of claim 1, wherein the fluid stimulation conduits are deployed via a crane positioned on the WSV, and wherein the crane is disconnected when the fluid stimulation conduits are in a substantially vertical orientation.

### Claim 8 (depends on 1)

The method of claim 1, wherein the WSJ conduit is supported by a plurality of buoyant members as required to avoid contact with or relieve weight on other subsea assets.

### Claim 9 (depends on 1)

The method of claim 1, wherein the ROV is operated to position and install the WSJ conduit under the MODU or platform.

### Claim 10 (depends on 1)

The method of claim 1, wherein multiple WSJ conduits are connected between the tree cap and the RST.
