# US 2026/0043207 A1 · Shoreline habitation constructions units, structures made therefrom and uses thereof

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0043207 A1
- Document ID: US20260043207A1
- Status: Published application
- Kind: A1
- Application number: 19/295,080
- Filed: 2025-08-08
- Published: 2026-02-12
- Earliest claimed: 2024-08-09
- Assignees: The Davey Tree Expert Company
- Applicants: The Davey Tree Expert Company
- Inventors: FREDERICK WORTH CREECH, JR.; MARY-MARGARET SYKES MCKINNEY
- Web page: https://patentgrep.com/patent/US20260043207A1

## CPC

- E02B 3/06: Moles; Piers; Quays; Quay walls; Groynes; Breakwaters {; Wave dissipating walls; Quay equipment}
- A01K 61/70: Artificial fishing banks or reefs
- A01K 61/73: assembled of components (A01K61/72 takes precedence)
- A01K 61/77: of monolithic form, e.g. blocks
- E02B 3/046: {Artificial reefs}
- E02B 3/14: Preformed blocks {or slabs for forming essentially continuous surfaces}; Arrangements thereof {(preassembled to constitute flexible mats E02B3/122; pavements E01C5/00)}
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- A01K: ANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS

## Abstract

A construction unit for construction of eco-friendly structures in a body of water is provided, wherein the construction unit is formed from at least a cementitious material, wherein the construction unit forms a rectangular prism having two or more extensions extending from a long face of the rectangular prism, wherein a first two of the two or more extensions are located at opposite ends of the long face of the rectangular prism, and, when present, additional extensions are located between the first two of the plurality of extensions, along with structures formed from the construction unit and methods for making the construction unit.

## Claims

### Claim 1

A construction unit for construction of eco-friendly structures in a body of water comprising:
a cementitious material;
wherein the construction unit comprises a rectangular prism having two or more extensions extending from a long face of the rectangular prism, wherein a first two of the two or more extensions are located at opposite ends of the long face of the rectangular prism, and, when present, additional extensions are located between the first two of the plurality of extensions.

### Claim 2 (depends on 1)

The construction unit according to claim 1, wherein the construction unit is of a size and weight suitable for handling and installation by an individual without a need for heavy machinery or other equipment.

### Claim 3 (depends on 1)

The construction unit according to claim 1, wherein the cementitious material comprises a primarily calcium carbonate material and a cement that is capable of holding the primarily calcium carbonate material.

### Claim 4 (depends on 3)

The construction unit according to claim 3, wherein the primarily calcium carbonate material is obtained from once living material from an organism.

### Claim 5 (depends on 3)

The construction unit according to claim 3, wherein the primarily calcium carbonate material comprises aquatic shells.

### Claim 6 (depends on 3)

The construction unit according to claim 3, wherein the cement is a bio-cement.

### Claim 7 (depends on 1)

The construction unit according to claim 1, wherein the construction unit comprises a rectangular prism having two extensions extending from a first long face of the rectangular prism, wherein each of the two extensions are located at opposite ends of the long face of the rectangular prism, and wherein the rectangular prism has a second long face of the rectangular prism on an opposite side from the first long face, wherein the rectangular face has at each end an angular face extending from the second long face to an end face at an angle greater than 0 and less than 90 degrees relative to the second long face.

### Claim 8 (depends on 7)

The construction unit according to claim 7, wherein each angular face extends from the second long face to an end face at an angle from 30 to 60 degrees relative to the second long face.

### Claim 9 (depends on 7)

The construction unit according to claim 7, wherein each angular face extends from the second long face to an end face at an angle of approximately 45 degrees relative to the second long face.

### Claim 10 (depends on 1)

A method of making the construction unit according to claim 1, comprising:
a) providing a plurality of primarily calcium carbonate material;
b) placing the primarily calcium carbonate material in a mold structure;
c) pouring the cement into the mold in a sufficient amount that when the cement hardens the construction unit can be removed from the mold; and
d) removing the construction unit from the mold,
wherein the construction unit comprises a rectangular prism having two or more extensions extending from a long face of the rectangular prism, wherein a first two of the two or more extensions are located at opposite ends of the long face of the rectangular prism, and, when present, additional extensions are located between the first two of the plurality of extensions.

### Claim 11 (depends on 10)

The method according to claim 10, wherein the construction unit is of a size and weight suitable for handling and installation by an individual without a need for heavy machinery or other equipment.

### Claim 12 (depends on 11)

The method according to claim 11, wherein the primarily calcium carbonate material is obtained from once living material from an organism.

### Claim 13 (depends on 11)

The method according to claim 11, wherein the primarily calcium carbonate material is aquatic shells.

### Claim 14 (depends on 10)

The method according to claim 10, wherein the cement is a bio-cement.

### Claim 15 (depends on 1)

A shoreline stabilization structure, artificial reef structure, revetment structure, sill structure, or shoreline habitation unit formed from a plurality of construction units according to claim 1.

### Claim 16 (depends on 1)

A method of making the construction unit according to claim 1, comprising:
a) providing a mold structure;
b) pouring the cementitious material into the mold in a sufficient amount that when the cement hardens the construction unit can be removed from the mold; and
c) removing the construction unit from the mold,
wherein the construction unit comprises a rectangular prism having two or more extensions extending from a long face of the rectangular prism, wherein a first two of the two or more extensions are located at opposite ends of the long face of the rectangular prism, and, when present, additional extensions are located between the first two of the plurality of extensions.

### Claim 17 (depends on 16)

The method according to claim 16, wherein the construction unit is of a size and weight suitable for handling and installation by an individual without a need for heavy machinery or other equipment.

### Claim 18 (depends on 1)

A habitat structure comprising:
(i) a base structure having a perimeter and one or more horizontal support structures extending from a first inner side of the perimeter to an opposite second inner side of the perimeter;
(ii) a vertical support structure extending from a centerpoint of the base structure to a desired height;
(iii) a plurality of construction units of claim 1 placed around the top surface of the perimeter of the base structure, having a first gap between each two adjacent construction units and resting on the two or more extensions of the construction unit;
(iv) a first plurality of cementitious units placed atop the plurality of construction units of part (iii), such that a first end of a cementitious unit rests atop one construction unit and a second end of the cementitious unit rests atop an adjacent construction unit spanning the first gap, until each gap formed between each two adjacent construction units is spanned by one of the plurality of cementitious units, and there is a second gap between each pair of adjacent first plurality of cementitious units;
(v) a second plurality of cementitious units placed atop the first plurality of cementitious units such that a first end of a cementitious unit rests atop one cementitious unit of the first plurality of cementitious units and a second end of the cementitious unit rests atop an adjacent cementitious unit of the first plurality of cementitious units spanning the second gap therebetween, until each second gap formed between each two adjacent first plurality of cementitious units is spanned by one of the second plurality of cementitious units, and there is a third gap between each pair of adjacent second plurality of cementitious units;
(vi) repeating step (v) until a desired height is attained.

### Claim 19 (depends on 18)

The habitat structure of claim 18, wherein pieces of the habitat structure are adhered one to another using a cementitious material.

### Claim 20 (depends on 18)

The habitat structure of claim 18, further comprising one or more stabilization structures for stabilizing the vertical support structure relative to the base structure.

### Claim 21 (depends on 18)

The habitat structure of claim 18, wherein the base structure and vertical support structure are formed as a unitary structure.

### Claim 22 (depends on 20)

The habitat structure of claim 20, wherein the base structure, vertical support structure, and one or more stabilization structures are formed as a unitary structure.
