# US 2026/0036115 A1 · Method for determining the production availability of an offshore wind farm

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0036115 A1
- Document ID: US20260036115A1
- Status: Published application
- Kind: A1
- Application number: 18/996,008
- Filed: 2023-07-20
- Published: 2026-02-05
- Earliest claimed: 2022-07-20
- Assignees: Totalenergies Onetech
- Applicants: TotalEnergies OneTech
- Inventors: Guillaume CLEMENT; Alexis BENHAMOU; Maïder ESTECAHANDY
- Web page: https://patentgrep.com/patent/US20260036115A1

## CPC

- F03D 17/006: {Estimation methods}
- F03D 17/026: {for assessing power production capabilities}
- F03D 17/007: {Wind farm monitoring}
- F03D 80/509: {Maintenance scheduling}
- G01W 1/02: Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed (G01W1/10 takes precedence)
- G06Q 10/0639: Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q 50/06: Energy or water supply
- B63B 2035/446: {for converting wind energy into electric energy}
- B63B 2209/20: wind energy
- F03D 13/256: {on a floating support, i.e. floating wind motors}
- F05B 2240/93: on a structure floating on a liquid surface
- F05B 2240/95: offshore
- F05B 2240/96: as part of a wind turbine farm
- F05B 2260/80: Diagnostics
- F05B 2260/84: Modelling or simulation
- F05B 2270/32: Wind speeds
- F05B 2270/342: Wave conditions, e.g. amplitude, frequency or direction
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- F03D: WIND MOTORS
- G01W: METEOROLOGY (radar, sonar, lidar or analogous systems, designed for meteorological use G01S13/95, G01S15/88, G01S17/95)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- B63B: SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING (arrangements of vessel ventilation, heating, cooling, or air-conditioning B63J2/00; floating substructures as supports of dredgers or soil-shifting machines E02F9/06)
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The present invention concerns a method for determining the production availability of an offshore wind farm comprising at least one floating wind turbine, the method comprising: obtaining wind farm data, obtaining strategy data relative to operation and maintenance resources to carry out an action on the floating wind turbine(s), obtaining meteorological data relative to an offshore environment for the offshore wind farm over a given period of time, determining motion parameters as a function of the wind farm data and of the meteorological data, and determining the production availability of the offshore wind farm in the offshore environment over the given period of time on the basis of the wind farm data, of the strategy data, of the meteorological data, and of the determined motion parameters.

## Claims

### Claim 1

A method for determining the production availability of an offshore wind farm, the offshore wind farm comprising at least one floating wind turbine, the method comprising the following steps which are computer-implemented:
obtaining wind farm data relative to features of the offshore wind farm,
obtaining strategy data relative to operation and maintenance resources to carry out an action on the floating wind turbine(s) of the offshore wind farm,
obtaining meteorological data relative to an offshore environment for the offshore wind farm over a given period of time,
determining motion parameters as a function of the wind farm data and of the meteorological data, the motion parameters being parameters quantifying the motions of at least an element, such as the nacelle or the floater, of a floating wind turbine of the offshore wind farm and/or the motions of a vessel aiming to reach said floating wind turbine to perform operation and/or maintenance actions on said floating wind turbine, and
determining the production availability of the offshore wind farm in the offshore environment over the given period of time on the basis of the wind farm data, of the strategy data, of the meteorological data, and of the determined motion parameters.

### Claim 2 (depends on 1)

A method according to claim 1, wherein the step for determining the production availability comprises, for each time step of the given period of time:
determining any eventual non-productive events on the basis of the wind farm data, of the strategy data and of the meteorological data, a non-productive event being any event affecting the production of the offshore wind farm and for which an operation and/or maintenance action is requested, and
at least in the case where a non-productive event has been determined, determining, on the basis of the motion parameters, the accessibility of the offshore wind farm for an operation and/or a maintenance action, the determined accessibility of the offshore wind farm for the considered time step affecting the production availability.

### Claim 3 (depends on 2)

A method according to claim 2, wherein the accessibility of the offshore wind farm is determined by evaluating whether the motions parameters for the considered time step reach predetermined accessibility criteria.

### Claim 4 (depends on 2)

A method according to claim 2, wherein the motion parameters are determined only for each time step of the given period of time for which a non-productive event has been determined at the preceding time step.

### Claim 5 (depends on 1)

A method according to claim 1, wherein the computer has access to a database in which predetermined meteorological conditions are associated to predetermined motion parameters for the offshore wind farm, the motion parameters being determined by comparing the meteorological data with the predetermined meteorological conditions of the database in order to obtain the predetermined meteorological conditions the closest from the meteorological data, the determined motion parameters being the predetermined motion parameters corresponding to the closest predetermined meteorological conditions.

### Claim 6 (depends on 1)

A method according to claim 1, wherein each floating wind turbine comprises a nacelle and a floater, the motion parameters comprising at least one of the following parameters:
a parameter relative to the displacement of the nacelle of a floating wind turbine,
a parameter relative to the acceleration of the nacelle of a floating wind turbine,
a parameter relative to the displacement of the floater of a floating wind turbine,
a parameter relative to the acceleration of the floater of a floating wind turbine,
a parameter relative to the relative displacement of the floater of a floating wind turbine with respect to a given vessel aiming to reach said floating wind turbine,
a parameter relative to the relative acceleration of the floater of a floating wind turbine with respect to a given vessel aiming to reach said floating wind turbine, and
a parameter relative to a slowdown of the cruising speed of a given vessel aiming to reach a floating wind turbine.

### Claim 7 (depends on 1)

A method according to claim 1, wherein the meteorological data comprise wind data and sea data, the sea data being relative to waves data and/or sea current.

### Claim 8 (depends on 1)

A method according to claim 1, wherein the strategy data comprise data relative to staffing and logistic means and data relative to offshore base and spare part.

### Claim 9 (depends on 1)

A method according to claim 1, wherein the wind farm data comprise at least one of the following elements:
data relative to the floating wind turbines,
data relative to wind farm design,
data relative to failure rates of the floating wind turbines,
data relative to scheduled maintenance and inspection,
data relative to safety test,
data relative to spare part management, and
data relative to curative maintenance.

### Claim 10 (depends on 1)

A method according to claim 1, wherein at least a non-productive event, is one of the following events:
inspection and preventive maintenance,
breakdown and production shutdown, and
curative maintenance.

### Claim 11 (depends on 1)

A method according to claim 1, wherein the step for determining the motion parameters is performed using an hydrodynamic model and the step for determining the production availability is performed using an operation and maintenance model.

### Claim 12 (depends on 1)

A method according to claim 1, wherein the determined production availability of the offshore wind farm is intended to be used for setting up operation and maintenance resources for carrying out operation and maintenance actions on the offshore wind farm.

### Claim 13 (depends on 1)

A method according to claim 1, wherein the method comprises a step for setting up operation and maintenance resources for carrying out operation and maintenance actions on the offshore wind farm as a function of the determined production availability of the offshore wind farm.

### Claim 14 (depends on 1)

A method according to claim 1, wherein the wind farm data and/or the meteorological data comprise at least one piece of data obtained through a measurement performed by a sensor.

### Claim 15 (depends on 1)

A readable information carrier on which a computer program product is stored, the computer program causing execution of at least the obtaining and determining steps of a method according to claim 1 when the computer program is carried out on a data processing unit.