# US 2026/0036113 A1 · Improvements Relating to Modular Wind Turbine Blades

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0036113 A1
- Document ID: US20260036113A1
- Status: Published application
- Kind: A1
- Application number: 18/997,361
- Filed: 2023-07-20
- Published: 2026-02-05
- Earliest claimed: 2022-07-22
- Assignees: Vestas Wind Systems A/S
- Applicants: Vestas Wind Systems A/S
- Inventors: Leon Barton; Stephen Sandercock
- Web page: https://patentgrep.com/patent/US20260036113A1

## CPC

- F03D 1/0675: {of the blades}
- F03D 13/104: {Rotor installation, e.g. installation of blades}
- F03D 1/0677: {Longitudinally segmented blades; Connectors therefor}
- F03D 1/0681: {Spar caps}
- F05B 2230/60: Assembly methods
- F05B 2240/302: Segmented or sectional blades
- F05B 2250/292: tapered
- Y02E 10/72: Wind turbines with rotation axis in wind direction
- Y02P 70/50: Manufacturing or production processes characterised by the final manufactured product
- F03D: WIND MOTORS
- F05B: INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

According to the present invention there is provided a method of assembling a modular wind turbine blade comprising first and second blade modules connectable together at an interface to form at least part of the modular wind turbine blade. The method comprises providing a first blade module and a second blade module. Each blade module comprises an outer shell defining an outer surface of the blade module, a connecting region of the outer shell defining an interface end of the blade module, and a longitudinally-extending spar cap embedded in the outer shell. The spar cap has a tapered end portion in the connecting region in which the thickness of the spar cap decreases towards the interface end of the blade module such that a tapered recess is defined in the outer surface of the blade module. The method further comprises arranging the first and second blade modules end-to-end with the tapered recesses aligned to define a bridge recess. The tapered recess of the first blade module defines a first end of the bridge recess, and the tapered recess of the second blade module defines a second end of the bridge recess. The method further comprises arranging a stack of layers in the bridge recess and spanning the interface between the first and second blade modules. The stack of layers comprises a plurality of pre-cured layers interleaved with pre-preg interlayers. The pre-preg interlayers comprise fibrous material that is pre-impregnated with uncured resin. The method further comprises applying heat to the stack of layers in the bridge recess such that the resin in the pre-preg interlayers mobilises in the bridge recess. The method further comprises curing the resin to integrate the pre-cured layers with each other to form a spar bridge spanning the interface, the spar bridge serving to connect the spar caps of the first and second blade modules.

## Claims

### Claim 1

A method of assembling a modular wind turbine blade comprising first and second blade modules connectable together at an interface to form at least part of the modular wind turbine blade, the method comprising:
providing a first blade module and a second blade module, each blade module comprising an outer shell defining an outer surface of the blade module, a connecting region of the outer shell defining an interface end of the blade module, and a longitudinally-extending spar cap embedded in the outer shell, the spar cap having a tapered end portion in the connecting region in which the thickness of the spar cap decreases towards the interface end of the blade module such that a tapered recess is defined in the outer surface of the blade module;
arranging the first and second blade modules end-to-end with the tapered recesses aligned to define a bridge recess, the tapered recess of the first blade module defining a first end of the bridge recess, and the tapered recess of the second blade module defining a second end of the bridge recess;
arranging a stack of layers in the bridge recess and spanning the interface between the first and second blade modules, the stack of layers comprising a plurality of pre-cured layers interleaved with pre-preg interlayers, wherein the pre-preg interlayers comprise fibrous material that is pre-impregnated with uncured resin;
applying heat to the stack of layers in the bridge recess such that the resin in the pre-preg interlayers mobilises in the bridge recess; and
curing the resin to integrate the pre-cured layers with each other to form a spar bridge spanning the interface, the spar bridge serving to connect the spar caps of the first and second blade modules.

### Claim 2 (depends on 1)

The method of claim 1, wherein applying heat to the stack of layers in the bridge recess comprises heating the stack of layers to at least 60° C.

### Claim 3 (depends on 1)

The method of claim 1, wherein prior to curing the resin, the method further comprises arranging a vacuum film over the stack of layers in the bridge recess to define a sealed region containing the stack; and
evacuating the sealed region under vacuum pressure to consolidate the stack of layers in the bridge recess such that the stack conforms to the profiles of the recesses of the first and second blade modules.

### Claim 4 (depends on 1)

The method of claim 1, wherein arranging the stack of layers comprises arranging successively longer pre-cured layers in the bridge recess to form a spar bridge having a first end that tapers in thickness and a second end that tapers in thickness.

### Claim 5 (depends on 1)

The method of claim 1, wherein at least some of the pre-preg interlayers extend longitudinally beyond the ends of their adjacent pre-cured layers.

### Claim 6 (depends on 1)

The method of claim 1, wherein the spar caps of the first and second blade modules comprise an electrically conductive material, wherein the pre-preg interlayers comprise an electrically conductive material, and wherein the stack of layers is arranged in the bridge recess with the pre-preg interlayers in electrical contact with at least one of the spar caps.

### Claim 7 (depends on 1)

The method of claim 1, wherein at least some of the pre-preg interlayers have a greater width than their adjacent pre-cured layers.

### Claim 8 (depends on 1)

The method of claim 1, wherein the pre-preg interlayers comprise a fibre volume fraction (FVF) from 30% to 70.

### Claim 9 (depends on 1)

The method of claim 1, further comprising arranging pre-preg fibrous material in the recesses of the first and second blade modules prior to arranging the stack of layers in the bridge recess.

### Claim 10 (depends on 1)

The method of claim 1, further comprising arranging a plurality of side-by-side stacks of layers in the bridge recess to form the spar bridge.

### Claim 11 (depends on 1)

The method of claim 1, wherein arranging the first and second blade modules end-to-end comprises spacing the first and second blade modules apart in the longitudinal direction, and wherein the method further comprises:
providing an open-ended U-shaped channel and aligning the U-shaped channel with the recesses of the first and second blade modules such that the bridge recess is defined by the recesses of the first and second blade modules and the U-shaped channel.

### Claim 12 (depends on 1)

The method of claim 1, wherein the stack of layers is pre-assembled prior to being arranged in the bridge recess.

### Claim 13 (depends on 12)

The method of claim 12, wherein pre-assembling the stack of layers comprises:
providing a plurality of pre-cured layers and at least one pre-preg interlayer;
assembling the pre-cured layers and the pre-preg interlayers in a stack in which the pre-cured layers are interleaved with the pre-preg interlayers; and
heating the stack to a temperature to increase the tackiness of the resin in the pre-preg interlayers and thereby temporarily bind the pre-cured layers together in the stack.

### Claim 14 (depends on 12)

The method of claim 12, wherein pre-assembling the stack of layers comprises:
assembling pre-cured layers interleaved with pre-preg interlayers in a stack; and
securing adjacent pre-cured layers together by providing adhesive between said adjacent pre-cured layers and curing the adhesive.

### Claim 15 (depends on 14)

The method of claim 14 wherein the adhesive is provided in a central region of the stack to secure central portions of adjacent pre-cured layers together.