# US 2026/0031616 A1 · Controlling load centers based on thermal characteristics

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0031616 A1
- Document ID: US20260031616A1
- Status: Published application
- Kind: A1
- Application number: 18/784,628
- Filed: 2024-07-25
- Published: 2026-01-29
- Earliest claimed: 2024-07-25
- Assignees: Schneider Electric USA, Inc.
- Applicants: Schneider Electric USA, Inc.
- Inventors: Andi Jakupi
- Web page: https://patentgrep.com/patent/US20260031616A1

## CPC

- H02H 7/26: Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured (locating faults in cables G01R31/08)
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02H 3/033: with several disconnections in a preferential order, {e.g. following priority of the users, load repartition}(H02H3/06 takes precedence)
- H02H 3/0935: {the timing being determined by numerical means}
- H02H 6/005: {using digital thermal images}
- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02H 3/006: {Calibration or setting of parameters}
- H02J 2105/12: supplying households or buildings
- H02J 2105/42: Home appliances
- H02J 2105/52: for limitation of the power consumption in the networks or in one section of the networks, e.g. load shedding or peak shaving
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- H02H: EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS (indicating or signalling undesired working conditions G01R, e.g. G01R31/00, G08B; locating faults along lines G01R31/08; emergency protective devices H01H)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

Systems/methods for managing a load center uses a thermal model of an overcurrent protection device to adjust the load center energy level. The systems/methods provide an energy management system that manages the amount of load energy in the load center to allow the load center to operate in an overloaded state without inducing thermal tripping of the load center. The energy management system determines a thermal shedding time that provides a margin or threshold against the thermal tripping, then determines, for a given load center energy level, whether the load center has been operating in an overloaded state for a time that equals or exceeds the thermal shedding time. The energy management system thereafter determines any load shedding that may be needed to reduce the load energy level. This arrangement allows the load center to remain in an overloaded state without thermal tripping.

## Claims

### Claim 1

An energy management system for a load center, the system comprising:
a processor; and
a storage unit coupled to the processor, the storage unit storing computer-readable instructions thereon that, when executed by the processor, cause the processor to:
obtain a load center energy level from an overcurrent protection device in the load center, the load center energy level indicative of an amount of current flowing through the overcurrent protection device;
determine whether the load center is operating in an overloaded state based on the load center energy level; and
adjust the load center energy level of the load center according to a thermal model of the overcurrent protection device to allow the load center to operate in an overloaded state without tripping the overcurrent protection device.

### Claim 2 (depends on 1)

The system of claim 1, wherein the computer-readable instructions further cause the processor to adjust the load center energy level of the load center by:
computing a thermal shedding time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether the load center is operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time; and
issuing, responsive to the load center operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time, a control signal configured to cause a specified load to be shed from the load center.

### Claim 3 (depends on 2)

The system of claim 2, wherein the computer-readable instructions cause the processor to compute the thermal shedding time for the load center in response to a determination that the load center energy level exceeds a thermal shedding threshold multiplied by the current rating of the overcurrent protection device.

### Claim 4 (depends on 1)

The system of claim 1, wherein the computer-readable instructions cause the processor to adjust the load center energy level by immediately issuing a control signal configured to cause a specified load to be shed from the load center.

### Claim 5 (depends on 4)

The system of claim 4, wherein the computer-readable instructions cause the processor to immediately issue the control signal configured to cause a specified load to be shed from the load center in response to the load center energy level exceeding a fast shedding threshold multiplied by a current rating of the overcurrent protection device.

### Claim 6 (depends on 1)

The system of claim 1, wherein the computer-readable instructions cause the processor to adjust the load center energy level by:
computing a thermal recovery time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether a load has been shed from the load center for a time equal to the thermal recovery time; and
issuing, responsive to the load having been shed from the load center for an amount of time equal to the thermal recovery time, a control signal configured to cause the load to be connected to the load center.

### Claim 7 (depends on 6)

The system of claim 6, wherein the computer-readable instructions cause the processor to compute the thermal recovery time in response to the load being identified as having been shed from the load center.

### Claim 8 (depends on 1)

The system of claim 1, wherein the thermal model of the overcurrent protection device is implemented as one or more lookup tables, and wherein the computer-readable instructions cause the processor to retrieve model values for the thermal model from the one or more lookup tables.

### Claim 9

A method of managing a load center, the method comprising:
obtaining a load center energy level from an overcurrent protection device in the load center, the load center energy level indicative of an amount of current flowing through the overcurrent protection device;
determining whether the load center is operating in an overloaded state based on the load center energy level; and
adjusting the load center energy level of the load center according to a thermal model of the overcurrent protection device to allow the load center to operate in an overloaded state without tripping the overcurrent protection device.

### Claim 10 (depends on 9)

The method of claim 9, wherein adjusting the load center energy level of the load center comprises:
computing a thermal shedding time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether the load center is operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time; and
issuing, responsive to the load center operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time, a control signal configured to cause a specified load to be shed from the load center.

### Claim 11 (depends on 10)

The method of claim 10, wherein the thermal shedding time for the load center is computed in response to a determination that the load center energy level exceeds a thermal shedding threshold multiplied by the current rating of the overcurrent protection device.

### Claim 12 (depends on 9)

The method of claim 9, wherein adjusting the load center energy level comprises immediately issuing a control signal configured to cause a specified load to be shed from the load center.

### Claim 13 (depends on 12)

The method of claim 12, wherein the control signal configured to cause a specified load to be shed from the load center is issued in response to a determination that the load center energy level exceeds a fast shedding threshold multiplied by a current rating of the overcurrent protection device.

### Claim 14 (depends on 9)

The method of claim 9, wherein adjusting the load center energy level comprises:
computing a thermal recovery time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether a load has been shed from the load center for a time equal to the thermal recovery time; and
issuing, responsive to the load having been shed from the load center for an amount of time equal to the thermal recovery time, a control signal configured to cause the load to be connected to the load center.

### Claim 15 (depends on 14)

The method of claim 14, wherein the thermal recovery time is computed in response to the load being identified as having been shed from the load center.

### Claim 16 (depends on 9)

The method of claim 9, wherein the thermal model of the overcurrent protection device is implemented as one or more lookup tables, further comprising retrieving model values for the thermal model from the one or more lookup tables.

### Claim 17

A load center, comprising:
a housing;
an overcurrent protection device installed within the housing; and
an energy management system installed within the housing and communicatively coupled to the overcurrent protection device, the energy management system configured to:
obtain a load center energy level from the overcurrent protection device, the load center energy level indicative of an amount of current flowing through an overcurrent protection device;
determine whether the load center is operating in an overloaded state based on the load center energy level; and
adjust the load center energy level of the load center according to a thermal model of the overcurrent protection device to allow the load center to operate in an overloaded state without tripping the overcurrent protection device.

### Claim 18 (depends on 17)

The load center of claim 17, wherein the energy management system adjusts the load center energy level of the load center by:
computing a thermal shedding time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether the load center is operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time; and
issuing, responsive to the load center operating in an overloaded state for an amount of time equal to or greater than the thermal shedding time, a control signal configured to cause a specified load to be shed from the load center.

### Claim 19 (depends on 18)

The load center of claim 18, wherein the energy management system computes the thermal shedding time for the load center in response to a determination that the load center energy level exceeds a thermal shedding threshold multiplied by the current rating of the overcurrent protection device.

### Claim 20 (depends on 17)

The load center of claim 17, wherein the energy management system adjusts the load center energy level by immediately issuing a control signal configured to cause a specified load to be shed from the load center.

### Claim 21 (depends on 20)

The load center of claim 20, wherein the energy management system issues the control signal configured to cause a specified load to be shed from the load center in response to a determination that the load center energy level exceeds a fast shedding threshold multiplied by a current rating of the overcurrent protection device.

### Claim 22 (depends on 17)

The load center of claim 17, wherein the energy management system adjusts the load center energy level by:
computing a thermal recovery time for the load center as a function of the load center energy level and a current rating of the overcurrent protection device;
determining whether a load has been shed from the load center for a time equal to the thermal recovery time; and
issuing, responsive to the load having been shed from the load center for an amount of time equal to the thermal recovery time, a control signal configured to cause the load to be connected to the load center.

### Claim 23 (depends on 22)

The load center of claim 22, wherein the energy management system computes the thermal recovery time in response to the load being identified as having been shed from the load center.

### Claim 24 (depends on 17)

The load center of claim 17, wherein the thermal model of the overcurrent protection device is implemented as one or more lookup tables, and wherein the energy management system retrieves model values for the thermal model from the one or more lookup tables.