# US 2026/0022522 A1 · System And Method For Subgrade Stabilization Of Railroad Bed

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2026/0022522 A1
- Document ID: US20260022522A1
- Status: Published application
- Kind: A1
- Application number: 19/345,465
- Filed: 2025-09-30
- Published: 2026-01-22
- Earliest claimed: 2021-08-16
- Assignees: R&B Leasing, LLC
- Applicants: R & B Leasing, LLC
- Inventors: Tomasz Szynakiewicz; Justin Anderson; Robert W. Hollinger
- Web page: https://patentgrep.com/patent/US20260022522A1

## CPC

- E01B 27/102: {Removing unwanted material without removing the ballast}
- E01B 1/001: {Track with ballast}
- E01B 2/006: {Deep foundation of tracks}
- E01B 37/00: Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00
- E01B 2204/03: Injecting, mixing or spraying additives into or onto ballast or underground
- E01B: PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS (derailing or rerailing blocks on track, track brakes or retarders B61K)

## Abstract

The invention is a system and method for repairing, improving, and stabilizing subgrade and subsoil/natural ground layers of a rail bed generally consisting of softer soils. One embodiment includes a method of installing subsurface inclusions and ballast fills comprising injected slurry mixtures of stabilizing material such as cement grout mixed with in situ soil. Another embodiment includes a system of installed ground inclusions and ballast fills. Another embodiment includes an integrated system of equipment for emplacing the system of inclusions and ballast fills.

## Claims

### Claim 1

A system for repairing a rail bed underlying a railroad having rails and cross ties, the system comprising:
a rail mounted wheeled vehicle enabling the vehicle to be driven off and driven onto the rails;
a drill mast mounted on the vehicle, the drill mast having a pair of drills and corresponding drill heads;
a power source for powering the drills to selectively penetrate the rail bed; a pump;
a hydraulic lift mounted to the vehicle for rotating the drill mast between a first horizontal stowed position to a second vertical operating position;
a grout source wherein the pump operates to transfer the grout through a transfer line to the drill mast; and
wherein the drill heads inject the grout into the rail bed.

### Claim 2 (depends on 1)

The system, as claimed in claim 1, further comprising:
a cement silo for storing grout material; and
a transfer line connected between the silo and pump enabling transfer of grout material from the silo to the pump.

### Claim 3 (depends on 2)

The system, as claimed in claim 2, further comprising:
a rail trailer mounted on the rail ties and supporting the cement silo.

### Claim 4 (depends on 3)

The system, as claimed in claim 3, further comprising:
an engine mounted on the rail trailer; and
drive tracks mounted on the rail tracks and communicating with the engine to propel the trailer.

### Claim 5 (depends on 1)

The system, as claimed in claim 1, wherein:
the drill mast is secured to the truck by a support frame.

### Claim 6 (depends on 1)

The system, as claimed in claim 1, wherein:
the vehicle further includes rail guides removably secured to the vehicle to maintain alignment of the wheels on the rail track.

### Claim 7 (depends on 1)

The system, as claimed in claim 1, wherein:
the drill heads are selectively and controllably lowered to drill holes in the rail bed and are subsequently lifted to inject grout to form inclusions in the drilled holes.

### Claim 8 (depends on 1)

The system, as claimed in claim 1, wherein:
the vehicle is operated to incrementally advanced to position the drills to emplace a plurality of inclusions that are spaced from one another along a length of the rail bed.

### Claim 9

A method for stabilizing subgrade and subsoil ground layers of a railroad bed underlying a railroad having rails and cross ties, the method comprising:
providing a rail mounted vehicle, a drill mast mounted on the vehicle, the drill mast having a pair of drills and corresponding drill heads;
determining a location on the railroad where the subgrade or subsoil have failed causing destabilization of the ballast upon which the rails and cross ties lie;
positioning the drills over the location to a first position;
drilling first holes by the drills into the subgrade and/or the subsoil;
withdrawing the drills and injecting a grout mix by the drill heads as the drills are withdrawn to form corresponding first inclusions in the first drilled holes;
moving the vehicle and repositioning the drills over the location to a second position spaced from the first position;
drilling second holes by the drills;
withdrawing the drills and injecting the grout mix by the drill heads as the drills are withdrawn to form corresponding second inclusions in the second drilled holes; and
wherein the vehicle and drill mast remain mounted on the railroad during emplacement of the inclusions.

### Claim 10 (depends on 9)

The method, as claimed in claim 9, further comprising:
injecting the grout mix in a ballast pocket to fill the ballast pocket forming ballast fill that communicates with at least one inclusion.

### Claim 11 (depends on 9)

The method, as claimed in claim 9, further comprising:
varying a rate of injection of the grout mix through the drills to selectively form the inclusions considering a volume of the drilled holes.

### Claim 12 (depends on 11)

The method, as claimed in claim 11, further comprising:
varying a rate of injection of the grout mix through the drills to selectively form the ballast fill considering a volume of the ballast pocket.

### Claim 13 (depends on 9)

The method, as claimed in claim 9, further comprising:
determining a scope of the failed subgrade and/or subsoil;
determining a number of inclusions required to repair the subgrade and/or subsoil;
predetermining an array of inclusions to emplace considering the number of inclusions required; and
sequentially emplacing the array of inclusions including a plurality of the inclusions that are spaced along a length of the railroad and spaced laterally from one another.

### Claim 14 (depends on 13)

The method, as claimed in claim 13, wherein:
the array comprises a preselected number of rows of inclusions and a preselected lateral spacing of the inclusions in the rows.

### Claim 15 (depends on 14)

The method, as claimed in claim 14, wherein:
the rows include at least two rows of inclusions extending along a length of the railroad.

### Claim 16 (depends on 14)

The method, as claimed in claim 14, wherein:
the lateral spacing of the inclusions includes at least one of a pair of laterally aligned inclusions located on interior sides of corresponding rail tracks.

### Claim 17 (depends on 16)

The method, as claimed in claim 16, wherein:
the lateral spacing of the inclusions includes at least one of a pair of laterally aligned inclusions located on exterior sides of corresponding rail tracks.

### Claim 18 (depends on 16)

The method, as claimed in claim 16, wherein:
the lateral spacing of the inclusions includes at least three laterally aligned inclusions.

### Claim 19 (depends on 9)

The method, as claimed in claim 9, further comprising:
rotating the drill mast from a first stowed position to a second vertical operating position for drilling the holes.

### Claim 20 (depends on 9)

The method, as claimed in claim 9, further comprising:
selectively changing a lateral spacing of the drills on the drill mast to match a desired lateral spacing of inclusions to be formed.
