# US 2025/0390631 A1 · Continuous Improvement Methodology for Digital Engineering

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0390631 A1
- Document ID: US20250390631A1
- Status: Published application
- Kind: A1
- Application number: 18/750,186
- Filed: 2024-06-21
- Published: 2025-12-25
- Earliest claimed: 2024-06-21
- Applicants: Auburn University
- Inventors: Allison B. LEDFORD; Gregory HARRIS; Ashley YARBROUGH; Erin GARCIA
- Web page: https://patentgrep.com/patent/US20250390631A1

## CPC

- G06F 30/20: Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30)
- G05B 19/0426: {Programming the control sequence}
- G05B 2219/34333: Multi threading
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A method for improving production of a physical product may include applying a data element mapping analysis to a current state of a system. The method may further include evaluating results of the application of the data element mapping analysis to identify and prioritize data threads of the system for increased efficiency. Additionally, the method may include adjusting, as a function of the prioritization of the data threads, a subset of the data threads of the system to improve one or more metrics of the system associated with waste that impedes efficiency. Further, the method may include utilizing the adjusted data threads to increase an efficiency associated with production of a physical product produced by the system.

## Claims

### Claim 1

A method for improving production of a physical product comprising:
applying a data element mapping analysis to a current state of a system;
evaluating results of the application of the data element mapping analysis to identify and prioritize data threads of the system for increased efficiency;
adjusting, as a function of the prioritization of the data threads, a subset of the data threads of the system to improve one or more metrics of the system associated with waste that impedes efficiency; and
utilizing the adjusted data threads to increase an efficiency associated with production of a physical product produced by the system.

### Claim 2 (depends on 1)

The method of claim 1, wherein applying the data element mapping analysis comprises performing functional level mapping and analysis, data vessel mapping and analysis, and data element level mapping and analysis.

### Claim 3 (depends on 1)

The method of claim 1, wherein evaluating results of the application of the data element mapping analysis comprises creating a directed graph data structure in which nodes represent data element instances and edges between the nodes indicate linked relationships.

### Claim 4 (depends on 3)

The method of claim 3, wherein creating a directed graph data structure comprises creating the directed graph data structure based on a table data structure representative of obtained data indicative of functions, data vessels, and data elements associated with the data threads within the system in the current state.

### Claim 5 (depends on 4)

The method of claim 4, wherein creating the directed graph data structure based on a table data structure comprises creating the directed graph data structure based on a table data structure in which rows represent data element instances and columns represent attributes of each corresponding data element instance.

### Claim 6 (depends on 3)

The method of claim 3, wherein creating the directed graph data structure comprises flagging one or more of the nodes or edges as a function of an evaluation based on a set of predefined waste categories.

### Claim 7 (depends on 6)

The method of claim 6, wherein flagging one or more of the nodes or edges as a function of an evaluation based on a set of predefined waste categories comprises flagging one or more of the nodes or edges based on a determined presence of form related waste, excess data related waste, error related waste, separation related waste, delay related waste, change related waste, manual intervention related waste, or storage related waste.

### Claim 8 (depends on 6)

The method of claim 6, wherein evaluating results of the application of the data element mapping analysis to identify and prioritize data threads of the system further comprises determining current state metrics for the current state of the system based on the flagged directed graph structure.

### Claim 9 (depends on 8)

The method of claim 8, wherein determining the current state metrics comprises determining one or more of a percentage of form related waste, a percentage of excess data related waste, a percentage of change related waste, a percentage of separation related waste, a percentage of manual intervention related waste, a percentage of potential storage related waste, a variation index, an estimated number of labor hours for the system, an estimated number of labor hours for each data element, a level of automation, a centrality index, a media disruption index, a first pass yield index, a count of disparate storage locations for data element instances, a count of transfers for data element instances, a count of manual interventions indicative of manual transfers of unique data elements, a count of forms used with each data element instance, or actor data access needs indicative of a number of times that a data element or data vessel changes actor access.

### Claim 10 (depends on 8)

The method of claim 8, further comprising prioritizing the data threads of the system as a function of the determined current state metrics.

### Claim 11 (depends on 10)

The method of claim 10, wherein prioritizing data threads as a function of the determined current state metrics comprises prioritizing data threads as a function of a capacity of each data thread to improve upon the current state metrics of the system.

### Claim 12 (depends on 10)

The method of claim 10, wherein prioritizing data threads as a function of the determined current state metrics comprises identifying one or more key data threads as a function of one or more of a determined amount of waste, estimated labor hours, level of automation, or actor access needs.

### Claim 13 (depends on 1)

The method of claim 1, wherein adjusting a subset of the data threads as a function of the prioritization of the data threads comprises removing one or more data elements determined to be excessive while preserving an order in which the data elements flow to one or more actors.

### Claim 14 (depends on 1)

The method of claim 1, wherein adjusting a subset of the data threads as a function of the prioritization of the data threads comprises identifying one or more data element instances linked to multiple preceding data element instances with OR logic.

### Claim 15 (depends on 14)

The method of claim 14, further comprising selecting one of the data element instances linked with OR logic to remain linked to a current data element instance and unlinking other data element instances.

### Claim 16 (depends on 15)

The method of claim 15, further comprising deleting data element instances that have no links.

### Claim 17 (depends on 1)

The method of claim 1, further comprising:
determining an improved state of the data threads of the system;
verifying the improved state of the data threads of the system;
developing an improved system architecture based on the improved state of the data threads;
verifying and validating the improved system architecture;
implementing the improved system architecture; and
verifying implementation of the improved system architecture.

### Claim 18 (depends on 1)

The method of claim 1, further comprising, after utilizing the adjusted data threads to increase an efficiency associated with production, adjusting, as a function of the prioritization of the data threads, a second subset of the data threads to further improve the one or more metrics of the system.

### Claim 19

A device comprising:
circuitry configured to:
apply a data element mapping analysis to a current state of a system;
evaluate results of the application of the data element mapping analysis to identify and prioritize data threads of the system for increased efficiency;
adjust, as a function of the prioritization of the data threads, a subset of the data threads of the system to improve one or more metrics of the system associated with waste that impedes efficiency; and
utilize the adjusted data threads to increase an efficiency associated with production of a physical product produced by the system.

### Claim 20

One or more machine-readable storage media comprising a plurality of instructions stored thereon that, in response to being executed, cause a compute device to:
apply a data element mapping analysis to a current state of a system;
evaluate results of the application of the data element mapping analysis to identify and prioritize data threads of the system for increased efficiency;
adjust, as a function of the prioritization of the data threads, a subset of the data threads of the system to improve one or more metrics of the system associated with waste that impedes efficiency; and
utilize the adjusted data threads to increase an efficiency associated with production of a physical product produced by the system.
