# US 2025/0385608 A1 · Control unit and method for operating a power converter in a buck-boost mode

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0385608 A1
- Document ID: US20250385608A1
- Status: Published application
- Kind: A1
- Application number: 18/747,205
- Filed: 2024-06-18
- Published: 2025-12-18
- Earliest claimed: 2024-06-18
- Assignees: Renesas Design (UK) Limited
- Applicants: Renesas Design (UK) Limited
- Inventors: Eduardas JODKA; Stefan DIETRICH; Gaetano PETRINA
- Web page: https://patentgrep.com/patent/US20250385608A1

## CPC

- H02M 3/1582: {Buck-boost converters (H02M3/1584 takes precedence)}
- H02M 1/0003: {Details of control, feedback or regulation circuits}
- H02M 1/0009: {Devices or circuits for detecting current in a converter}
- H02M: APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF (transformers H01F; dynamo-electric converters H02K47/00; controlling transformers, reactors or choke coils, control or regulation of electric motors, generators or dynamo-electric converters H02P)

## Abstract

A control unit for operating a power converter in a buck-boost mode is provided. The control unit is configured to, within a switching cycle, operate the power converter in an IN state starting from the beginning of the switching cycle until a timer signal of a timer occurs. The control unit is further configured to subsequently operate the power converter in a THROUGH state stating from the timer signal until a peak current event occurs. The control unit is further configured to subsequently operate the power converter in an OUT state starting from the peak current event until a clock signal occurs, which indicates an end of the switching cycle.

## Claims

### Claim 1

A control unit for operating a power converter in a buck-boost mode, wherein the control unit is configured to, within a switching cycle,
operate the power converter in an IN state starting from a beginning of the switching cycle until a timer signal of a timer occurs; wherein in the IN state an input node of the power converter is coupled with a reference node of the power converter via an energy conversion element;
subsequently operate the power converter in a THROUGH state stating from the timer signal until a peak current event occurs; wherein in the THROUGH state the input node of the power converter is coupled with an output node of the power converter via the energy conversion element; and
subsequently operate the power converter in an OUT state starting from the peak current event until a clock signal occurs, which indicates an end of the switching cycle;
wherein in the OUT state the output node of the power converter is coupled with the reference node of the power converter via the energy conversion element.

### Claim 2 (depends on 1)

The control unit of claim 1, wherein the control unit is further configured to start the timer for generating the timer signal upon occurrence of the peak current event.

### Claim 3 (depends on 2)

The control unit of claim 2, wherein the control unit is further configured to:
determine whether or not the timer signal occurs prior to the clock signal;
operate the power converter in the buck-boost mode within a subsequent switching cycle, if the timer signal does not occur prior to the clock signal; and
operate the power converter in a buck mode within the subsequent switching cycle, if the timer signal occurs prior to the clock signal.

### Claim 4 (depends on 3)

The control unit of claim 3, wherein the control unit is further configured to, for operating the power converter in the buck mode within the subsequent switching cycle,
operate the power converter in the THROUGH state stating from the beginning of the subsequent switching cycle until a peak current event occurs; and
subsequently operate the power converter in the OUT state starting from the peak current event until a clock signal occurs, which indicates the end of the subsequent switching cycle.

### Claim 5 (depends on 4)

The control unit of claim 4, wherein the control unit is further configured to, when operating the power converter in the buck mode,
start the timer for generating the timer signal upon occurrence of a peak current event within a given switching cycle; and
determine whether or not the timer signal occurs prior to the clock signal which terminates the given switching cycle,
in order to determine whether the power converter remains within the buck mode or transitions back to the buck-boost mode.

### Claim 6 (depends on 1)

The control unit of claim 1, wherein the control unit is further configured to:
determine whether or not the peak current event occurs prior to the clock signal;
operate the power converter in the buck-boost mode within a subsequent switching cycle, if the peak current event occurs prior to the clock signal; and
operate the power converter in a boost mode within the subsequent switching cycle, if the peak current event does not occur prior to the clock signal.

### Claim 7 (depends on 6)

The control unit of claim 6, wherein the control unit is further configured to, for operating the power converter in the boost mode within the subsequent switching cycle,
operate the power converter in the IN state starting from the beginning of the subsequent switching cycle until a peak current event occurs; and
subsequently operate the power converter in the THROUGH state stating from the peak current event until the end of the subsequent switching cycle.

### Claim 8 (depends on 7)

The control unit of claim 7, wherein the control unit is further configured to, when operating the power converter in the boost mode,
start the timer for generating the timer signal at the beginning of a given switching cycle; and
determine whether or not the timer signal occurs prior to a peak current event within the given switching cycle,
in order to determine whether the power converter remains within the boost mode or transitions back to the buck-boost mode.

### Claim 9 (depends on 7)

The control unit of claim 7, wherein the control unit is further configured to, when operating the power converter in the boost mode, resets and restart a ramp signal upon occurrence of a peak current event within a given switching cycle.

### Claim 10 (depends on 1)

The control unit of claim 1, wherein
the timer has a fixed timer duration; and
the timer is configured to generate the timer signal as soon as the fixed timer duration has lapsed.

### Claim 11 (depends on 1)

The control unit of claim 1, wherein, when operating the power converter in the buck-boost mode,
the THROUGH state has a state duration which corresponds to the time interval that begins at the occurrence of the timer signal and that ends at the occurrence of the peak current event;
the OUT state has a state duration which corresponds to the time interval that begins at the occurrence of the peak current event and that ends at the occurrence of the clock signal which indicates the end of the switching cycle; and
the IN state has a state duration which corresponds to a fixed timer duration of the timer minus the state duration of the OUT state.

### Claim 12 (depends on 1)

The control unit of claim 1, wherein the control unit is further configured to,
sense a current through the energy conversion element, to provide a sensed current;
overlay the sensed current with a ramp signal to provide a ramped current signal;
determine an error signal based on an output voltage at the output node of the power converter and based on a reference voltage; and
compare the ramped current signal with the error signal to detect a peak current event.

### Claim 13 (depends on 12)

The control unit of claim 12, wherein the control unit is further configured to reset and restart the ramp signal at the beginning of each switching cycle when operating the power converter in the buck-boost mode.

### Claim 14 (depends on 12)

The control unit of claim 12, wherein a slope of the ramp signal is dependent on a pre-determined peak current through the energy conversion element.

### Claim 15

A method for operating a power converter in a buck-boost mode; wherein the method comprises, within a switching cycle,
operating the power converter in an IN state starting from a beginning of the switching cycle until a timer signal of a timer occurs; wherein in the IN state an input node of the power converter is coupled with a reference node of the power converter via an energy conversion element;
subsequently operating the power converter in a THROUGH state stating from the timer signal until a peak current event occurs; wherein in the THROUGH state the input node of the power converter is coupled with an output node of the power converter via the energy conversion element; and
subsequently operating the power converter in an OUT state starting from the peak current event until a clock signal occurs, which indicates an end of the switching cycle;
wherein in the OUT state the output node of the power converter is coupled with the reference node of the power converter via the energy conversion element.

### Claim 16 (depends on 15)

The method of claim 15, comprising starting the timer for generating the timer signal upon occurrence of the peak current event.

### Claim 17 (depends on 16)

The method of claim 16, further comprising:
determining whether or not the timer signal occurs prior to the clock signal;
operating the power converter in the buck-boost mode within a subsequent switching cycle, if the timer signal does not occur prior to the clock signal; and
operating the power converter in a buck mode within the subsequent switching cycle, if the timer signal occurs prior to the clock signal.

### Claim 18 (depends on 17)

The method of claim 17, further comprising, for operating the power converter in the buck mode within the subsequent switching cycle,
operating the power converter in the THROUGH state stating from the beginning of the subsequent switching cycle until a peak current event occurs; and
subsequently operating the power converter in the OUT state starting from the peak current event until a clock signal occurs, which indicates the end of the subsequent switching cycle.

### Claim 19 (depends on 18)

The method of claim 18, further comprising, when operating the power converter in the buck mode,
starting the timer for generating the timer signal upon occurrence of a peak current event within a given switching cycle; and
determining whether or not the timer signal occurs prior to the clock signal which terminates the given switching cycle,
in order to determine whether the power converter remains within the buck mode or transitions back to the buck-boost mode.

### Claim 20 (depends on 15)

The method of claim 15, further comprising:
determining whether or not the peak current event occurs prior to the clock signal;
operating the power converter in the buck-boost mode within a subsequent switching cycle, if the peak current event occurs prior to the clock signal; and
operating the power converter in a boost mode within the subsequent switching cycle, if the peak current event does not occur prior to the clock signal.
