# US 2025/0384191 A1 · Drilling operations framework

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0384191 A1
- Document ID: US20250384191A1
- Status: Published application
- Kind: A1
- Application number: 18/740,550
- Filed: 2024-06-12
- Published: 2025-12-18
- Earliest claimed: 2024-06-12
- Assignees: Schlumberger Technology Corporation
- Applicants: Schlumberger Technology Corporation
- Inventors: Andrew Poor; Paul Bolchover; Gang Xu; Feng Feng
- Web page: https://patentgrep.com/patent/US20250384191A1

## CPC

- E21B 44/00: Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- G06F 30/28: using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)

## Abstract

A method may include receiving a request to select a piece of equipment for performing a field operation at a site; responsive to the request, automatically generating scenarios for a number of candidate pieces of equipment, executing simulations to generate simulation results for the scenarios, and, based at least in part on the simulation results, computing performance indicators for the scenarios; and outputting the performance indicators according to a schema for rendering graphics to a display.

## Claims

### Claim 1

A method comprising:
receiving a request to select a piece of equipment for performing a field operation at a site;
responsive to the request, automatically generating scenarios for a number of candidate pieces of equipment, executing simulations to generate simulation results for the scenarios, and, based at least in part on the simulation results, computing performance indicators for the scenarios; and
outputting the performance indicators according to a schema for rendering graphics to a display.

### Claim 2 (depends on 1)

The method of claim 1, wherein the piece of equipment comprises a drillstring component.

### Claim 3 (depends on 2)

The method of claim 2, wherein the drillstring component comprises a drill bit.

### Claim 4 (depends on 2)

The method of claim 2, wherein the simulations comprise drilling simulations performed by one or more different drilling simulators.

### Claim 5 (depends on 1)

The method of claim 1, wherein the site comprises a wellsite characterized at least in part by a formation model.

### Claim 6 (depends on 5)

The method of claim 5, wherein the simulations comprise at least one simulation that depends on the formation model.

### Claim 7 (depends on 5)

The method of claim 5, wherein the simulations comprise at least one simulation that simulates equipment and formation interactions.

### Claim 8 (depends on 1)

The method of claim 1, wherein the simulations comprise at least one static simulation and at least one dynamic simulation.

### Claim 9 (depends on 1)

The method of claim 1, wherein the generating comprises accessing one or more equipment databases that comprise equipment specifications.

### Claim 10 (depends on 1)

The method of claim 1, wherein the generating comprises using a first computing system and wherein the executing comprises using a second computing system.

### Claim 11 (depends on 10)

The method of claim 10, wherein the first computing system comprises a local computing system and wherein the second computing system comprises a remote, cloud-based computing system.

### Claim 12 (depends on 11)

The method of claim 11, wherein the request is received by the local computing system.

### Claim 13 (depends on 1)

The method of claim 1, wherein the performance indicators comprise a hierarchy of performance indicators.

### Claim 14 (depends on 13)

The method of claim 13, wherein the hierarchy of performance indicators comprises classes and sub-classes of performance indicators.

### Claim 15 (depends on 1)

The method of claim 1, wherein the generating the scenarios comprises organizing the scenarios according to the schema.

### Claim 16 (depends on 15)

The method of claim 15, wherein the outputting the performance indicators according to the schema comprises appending a data structure organized according to the schema.

### Claim 17 (depends on 1)

The method of claim 1, wherein the schema comprises a JSON-based schema.

### Claim 18 (depends on 1)

The method of claim 1, comprising selecting one of the pieces of equipment based at least in part on the performance indicators.

### Claim 19

A system comprising:
one or more processors;
memory accessible to at least one of the one or more processors; and
processor-executable instructions stored in the memory and executable to instruct the system to:
receive a request to select a piece of equipment for performing a field operation at a site;
responsive to the request, automatically generate scenarios for a number of candidate pieces of equipment, execute simulations to generate simulation results for the scenarios, and, based at least in part on the simulation results, compute performance indicators for the scenarios; and
output the performance indicators according to a schema for rendering graphics to a display.

### Claim 20

One or more computer-readable storage media comprising processor-executable instructions to instruct a computing system to:
receive a request to select a piece of equipment for performing a field operation at a site;
responsive to the request, automatically generate scenarios for a number of candidate pieces of equipment, execute simulations to generate simulation results for the scenarios, and, based at least in part on the simulation results, compute performance indicators for the scenarios; and
output the performance indicators according to a schema for rendering graphics to a display.
