# US 2025/0378236 A1 · Systems and methods for optimizing saltwater disposal reservoirs

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0378236 A1
- Document ID: US20250378236A1
- Status: Published application
- Kind: A1
- Application number: 19/191,552
- Filed: 2025-04-28
- Published: 2025-12-11
- Earliest claimed: 2024-04-26
- Assignees: ConocoPhillips Company
- Applicants: ConocoPhillips Company
- Inventors: Chung-Kan HUANG; Dylan VENNES; Mazaruny RINCONES; Yong ZHAO; Pallav SHARMA; Dayanara BETANCOURT
- Web page: https://patentgrep.com/patent/US20250378236A1

## CPC

- G06F 30/27: using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
- G06N 20/00: Machine learning
- E21B 43/00: Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells (applicable only to water E03B)
- G06N 20/10: using kernel methods, e.g. support vector machines [SVM]
- G06N 20/20: Ensemble learning
- G06Q 10/04: Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202)
- G06Q 50/02: Agriculture; Fishing; Forestry; Mining
- E21B 2200/20: Computer models or simulations, e.g. for reservoirs under production, drill bits
- E21B 2200/22: Fuzzy logic, artificial intelligence, neural networks or the like
- G01V 20/00: Geomodelling in general
- G06F 2111/10: Numerical modelling
- G06F 2119/14: Force analysis or force optimisation, e.g. static or dynamic forces
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G01V: GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS (means for indicating the location of accidentally buried, e.g. snow-buried, persons A63B29/02)

## Abstract

Implementations described and claimed herein provide systems and methods for optimizing saltwater disposal and development. One implementation includes receiving reservoir data and pressure data from at least one of a computing device, one or more sensors, or one or more databases; generating uncertainty parameters using the reservoir data; identifying one or more pressure events at one or more locations using the pressure data; generating correlated pressure data based on a correlation of the one or more pressure events with historical data; generating prediction data indicating a predicted pressure change for a reservoir undergoing saltwater disposal, the prediction data generated based on the reservoir data using one or more machine learning models, the one or more machine learning models trained using the correlated pressure data and the uncertainty parameters; and generating an optimized development plan for the reservoir using the prediction data.

## Claims

### Claim 1

A method for optimizing saltwater disposal, the method comprising:
receiving reservoir data and pressure data from at least one of a computing device, one or more sensors, or one or more databases;
generating uncertainty parameters using the reservoir data;
identifying one or more pressure events at one or more locations using the pressure data;
generating correlated pressure data based on a correlation of the one or more pressure events with historical data;
generating prediction data indicating a predicted pressure change for a reservoir undergoing saltwater disposal, the prediction data generated based on the reservoir data using one or more machine learning models, the one or more machine learning models trained using the correlated pressure data and the uncertainty parameters; and
generating an optimized development plan for the reservoir using the prediction data.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
modifying at least one of a drilling operation or a well operation using the optimized development plan.

### Claim 3 (depends on 1)

The method of claim 1, wherein the reservoir data includes at least one of a top hole pressure, a bottom hole pressure, a reservoir pressure, a mud weight, or a kick pressure.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
generating an output based on the prediction data, the output including at least one of a pressure map or a plot for the reservoir.

### Claim 5 (depends on 1)

The method of claim 1, wherein the one or more machine learning models are trained by:
updating the uncertainty parameters; and
reducing a distribution of the uncertainty parameters.

### Claim 6 (depends on 1)

The method of claim 1, wherein the historical data includes at least one of historical pressure data or historical injection data.

### Claim 7 (depends on 1)

The method of claim 1, wherein the one or more machine learning models are trained by determining differences between the correlated pressure data and the uncertainty parameters.

### Claim 8

One or more tangible non-transitory computer-readable storage media storing computer-executable instructions for performing a computer process on a computing system, the computer process comprising:
receiving reservoir data and pressure data from at least one of a computing device, one or more sensors, or one or more databases;
generating uncertainty parameters using the reservoir data;
identifying one or more pressure events at one or more locations using the pressure data;
generating correlated pressure data based on a correlation of the one or more pressure events with historical data;
generating prediction data indicating a predicted pressure change for a reservoir undergoing saltwater disposal, the prediction data generated based on the reservoir data using one or more machine learning models, the one or more machine learning models trained using the correlated pressure data and the uncertainty parameters; and
generating an optimized development plan for the reservoir using the prediction data.

### Claim 9 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8 storing additional computer-executable instructions for performing the computer process, the computer process further comprising:
modifying at least one of a drilling operation or a well operation using the optimized development plan.

### Claim 10 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8, wherein the reservoir data includes at least one of a top hole pressure, a bottom hole pressure, a reservoir pressure, a mud weight, or a kick pressure.

### Claim 11 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8 storing additional computer-executable instructions for performing the computer process, the computer process further comprising:
generating an output based on the prediction data, the output including at least one of a pressure map or a plot for the reservoir.

### Claim 12 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8, wherein the one or more machine learning models are trained by:
updating the uncertainty parameters; and
reducing a distribution of the uncertainty parameters.

### Claim 13 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8,
wherein the historical data includes at least one of historical pressure data or historical injection data.

### Claim 14 (depends on 8)

The one or more tangible non-transitory computer-readable storage media of claim 8, wherein the one or more machine learning models are trained by determining differences between the correlated pressure data and the uncertainty parameters.

### Claim 15

A system for optimizing a development plan for a natural resource production system, the system comprising:
a processing system in communication with a computing device, one or more sensors and one or more databases over a network, the processing system receiving reservoir data and pressure data from at least one of the computing device, the one or more sensors, or the one or more databases;
an uncertainty estimation system generating uncertainty parameters using the reservoir data;
a correlation system identifying one or more pressure events at one or more locations using the pressure data and generating correlated pressure data based on a correlation of the one or more pressure events with historical data; and
an optimization system generating prediction data indicating a predicted pressure change for a reservoir undergoing saltwater disposal, the prediction data generated based on the reservoir data using one or more machine learning models, the one or more machine learning models trained using the correlated pressure data and the uncertainty parameters; and
generating an optimized development plan for the reservoir using the prediction data.

### Claim 16 (depends on 15)

The system of claim 15, further comprising an output system generating an output based on the prediction data, the output including at least one of a pressure map or a plot for the reservoir.

### Claim 17 (depends on 15)

The system of claim 15, wherein the reservoir data includes at least one of a top hole pressure, a bottom hole pressure, a reservoir pressure, a mud weight, or a kick pressure.

### Claim 18 (depends on 15)

The system of claim 15, wherein the one or more machine learning models are trained by determining differences between the correlated pressure data and the uncertainty parameters.

### Claim 19 (depends on 15)

The system of claim 15, wherein the optimization system modifies at least one of a drilling operation or a well operation using the optimized development plan.

### Claim 20 (depends on 15)

The system of claim 15, wherein the optimization system generates a command to cause saltwater to be injected into a disposal well in the reservoir based on the optimized development plan.
