- Number: US 2025/0377653 A1
- Document ID: US20250377653A1
- Status: Published application
- Kind: A1
- Application number: 19/181,621
- Filed: 2025-04-17
- Published: 2025-12-11
- Earliest claimed: 2022-10-19
- Assignees: Lin and Associates, Inc.
- Applicants: Lin and Associates
- Inventors: Eric F. LeBlanc
- Web page: https://patentgrep.com/patent/US20250377653A1

## CPC

- G05B 23/0243: {model based detection method, e.g. first-principles knowledge model}
- G05B 23/0272: {Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user}
- G05B 19/042: using digital processors (G05B19/05 takes precedence)
- G05B 19/4184: {characterised by fault tolerance, reliability of production system}
- G05B 2219/31467: Display of operating conditions of machines, workcells, selected programs
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

Potentially-abnormal behavior of an industrial system is communicated to an operator using a computer including displaying measured parameters, evaluating whether a parameter is projected to go outside of a boundary, and warning the operator accordingly. A preceding period may be divided into multiple time periods, values of the parameter may be recalled at different times during the periods, and the values may be used to calculate whether the parameter is projected to go outside the boundary. In some embodiments, intermediate values (e.g., slopes) may be calculated for the time periods and may be combined into a combined intermediate value or combined slope used to determine whether the particular parameter is projected to go outside of the boundary within a predetermined future period of time. Changes in intermediate values may be calculated, averaged, subtracted, or divided (e.g., by a slope change factor).

## Claims

### Claim 1

A computerized method of communicating potentially abnormal behavior of an industrial system to an operator of the industrial system, the method comprising, using a computer:
simultaneously displaying to the operator of the industrial system multiple different measured parameters of the industrial system;
for a particular parameter of the multiple different measured parameters of the industrial system, evaluating whether the particular parameter is projected to go outside of a boundary for the particular parameter within a predetermined future period of time; and
providing a warning to the operator of the industrial system when the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time;
wherein, the evaluating whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises:
dividing a preceding period of time into multiple time periods;
for each time period of the multiple time periods, recalling multiple values of the particular parameter at multiple different times during the time period; and
using the multiple values from each time period of the multiple time periods to calculate whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 2 (depends on 1)

The method of claim 1 wherein the using the multiple values from each time period of the multiple time periods to calculate whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises, using the computer:
using the multiple values from each time period of the multiple time periods to calculate a time-period-specific intermediate value for the time period;
combining each time-period-specific intermediate value for each time period of the multiple time periods to obtain a combined intermediate value; and
using the combined intermediate value to determine whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 3 (depends on 2)

The method of claim 2 wherein each time-period-specific intermediate value for each time period of the multiple time periods comprises a slope of the particular parameter within the time period.

### Claim 4 (depends on 2)

The method of claim 2 wherein the combined intermediate value is a projected slope of the particular parameter with respect to time.

### Claim 5 (depends on 2)

The method of claim 2 wherein:
the combining each time-period-specific intermediate value comprises, using the computer, subtracting a first time-period-specific intermediate value for a first time period of the multiple time periods from a second time-period-specific intermediate value for a second time period of the multiple time periods;
the second time period is more recent than the first time period; and
the second time period and the first time period are consecutive.

### Claim 6 (depends on 2)

The method of claim 2 wherein the combining each time-period-specific intermediate value comprises, using the computer:
calculating a difference between a first time-period-specific intermediate value for a first time period of the multiple time periods and a second time-period-specific intermediate value for a second time period of the multiple time periods, and
adding the difference to the second time-period-specific intermediate value.

### Claim 7 (depends on 2)

The method of claim 2 wherein the combining each time-period-specific intermediate value comprises, using the computer:
multiplying by a slope change factor that has an absolute value that is less than one; or
dividing by a slope change factor that has an absolute value that is greater than one.

### Claim 8 (depends on 2)

The method of claim 2 wherein the combining each time-period-specific intermediate value comprises, using the computer, weighting more heavily a more-recent time-period-specific intermediate value for a more-recent time period of the multiple time periods.

### Claim 9 (depends on 1)

The method of claim 1 wherein:
the evaluating whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises, using the computer:
calculating a first slope difference between a first slope for a first time period of the multiple time periods and a second slope for a second time period of the multiple time periods; and
calculating a second slope difference between the second slope for the second time period of the multiple time periods and a third slope for a third time period of the multiple time periods;
the second time period is more recent than the first time period;
the third time period is more recent than the second time period;
the first time period, the second time period, and the third time period are consecutive; and
the first slope difference and the second slope difference are used to calculate a projected slope of the particular parameter with respect to time.

### Claim 10 (depends on 9)

The method of claim 9 further comprising:
averaging the first slope difference and the second slope difference to obtain an average slope difference; and
subtracting the average slope difference from the third slope to obtain a projected slope.

### Claim 11 (depends on 10)

The method of claim 10 further comprising, using the computer: multiplying or dividing the average slope difference by a slope change factor before subtracting the average slope difference from the third slope to obtain the projected slope.

### Claim 12 (depends on 1)

The method of claim 1 wherein the evaluating whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises:
calculating a first slope difference between a first slope for a first time period of the multiple time periods and a second slope for a second time period of the multiple time periods;
calculating a second slope difference between the second slope for the second time period of the multiple time periods and a third slope for a third time period of the multiple time periods; and
calculating a third slope difference between the third slope for the third time period of the multiple time periods and a fourth slope for a fourth time period of the multiple time periods.

### Claim 13 (depends on 1)

The method of claim 1 wherein:
providing the warning to the operator comprises, using the computer, providing a visual display to the operator;
the visual display is displayed in a first manner when the particular parameter is already outside of the boundary for the particular parameter; and
the visual display is displayed in a second manner when the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 14 (depends on 13)

The method of claim 13 wherein the visual display to the operator comprises an arrow.

### Claim 15 (depends on 14)

The method of claim 14 wherein:
the arrow is displayed next to a numerical display of the particular parameter; and
the warning to the operator comprises, using the computer, providing an audible indication to the operator.

### Claim 16 (depends on 14)

The method of claim 14 wherein:
the arrow is displayed solid when the particular parameter is already outside of the boundary for the particular parameter; and
the arrow is displayed hollow when the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 17 (depends on 1)

The method of claim 1 wherein the evaluating whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises calculating a coefficient of determination for the particular parameter.

### Claim 18 (depends on 17)

The method of claim 17 further comprising using the coefficient of determination to select which process to use for the evaluating whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 19 (depends on 1)

The method of claim 1 wherein the using the multiple values from each time period of the multiple time periods to calculate whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises using linear regression to determine whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.

### Claim 20 (depends on 1)

The method of claim 1 wherein the using the multiple values from each time period of the multiple time periods to calculate whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time comprises using a first order lag function to determine whether the particular parameter is projected to go outside of the boundary for the particular parameter within the predetermined future period of time.