- Number: US 2025/0373377 A1
- Document ID: US20250373377A1
- Status: Published application
- Kind: A1
- Application number: 19/221,592
- Filed: 2025-05-29
- Published: 2025-12-04
- Earliest claimed: 2024-05-29
- Assignees: IONX Networks Limited
- Applicants: IONX Networks Limited
- Inventors: Kenneth James Fairweather; Marlon Peter Persaud
- Web page: https://patentgrep.com/patent/US20250373377A1

## CPC

- H04L 5/0035: {Resource allocation in a cooperative multipoint environment}
- H04W 52/0203: {in the radio access network or backbone network of wireless communication networks}
- H04B 7/024: Co-operative use of antennas of several sites, e.g. in co-ordinated multipoint or co-operative multiple-input multiple-output [MIMO] systems
- H04W 24/02: Arrangements for optimising operational condition
- H04W 72/121: for groups of terminals or users
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)
- H04B: TRANSMISSION

## Abstract

A computer-implemented method is described, for performing dynamic clustering of radio devices in a Cooperative Multi-Point network, the network comprising a plurality of radio devices, one or more clusters of radio devices of the plurality of radio devices, one or more scheduler instances each associated with a cluster of the one or more clusters, and a controller. The method includes: determining that a re-clustering condition associated with utilisation of one or more radio devices in a given cluster is satisfied; in response to determining that the re-clustering condition is satisfied: signalling a scheduler instance associated with the given cluster to remove the one or more radio devices from the given cluster; changing a processing resource allocation allocated for executing the one or more scheduler instances; and signalling a second scheduler instance to adopt the one or more radio devices.

## Claims

### Claim 1

A computer-implemented method for performing dynamic clustering of radio devices in a Cooperative Multi-Point network, the network comprising a plurality of radio devices, one or more clusters of radio devices of the plurality of radio devices, one or more scheduler instances each associated with a cluster of the one or more clusters, and a controller, the method comprising:
determining that a re-clustering condition associated with utilisation of one or more radio devices in a given cluster is satisfied, wherein radio devices in a given cluster are operable to be scheduled by a same scheduler instance; and
in response to determining that the re-clustering condition is satisfied:
signalling a scheduler instance associated with the given cluster to remove the one or more radio devices from the given cluster;
changing a processing resource allocation allocated for executing the one or more scheduler instances; and
signalling a second scheduler instance to adopt the one or more radio devices.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
receiving utilisation information from the scheduler instance associated with the given cluster,
wherein determining that the re-clustering condition is satisfied is based on the received utilisation information.

### Claim 3 (depends on 1)

The method of claim 1, wherein the utilisation information indicates the presence or absence of active connections between the one or more radio devices in the given cluster and one or more client devices.

### Claim 4 (depends on 3)

The method of claim 3, wherein determining that the re-clustering condition is satisfied comprises:
determining, based on the utilisation information, that the number of active connections of the one or more radio devices is below a predetermined threshold or that the number of the one or more radio devices having active connections is greater than a predetermined threshold.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining that the re-clustering condition is satisfied is in response to determining one or more of: that a current time of day satisfies a predetermined condition; that a determined historical utilisation satisfies a predetermined condition; that a data demand satisfies a predetermined threshold; that a number of active connections satisfies a predetermined threshold; and that a start condition indicating that re-clustering is to be performed is satisfied.

### Claim 6 (depends on 1)

The method of claim 1, wherein the network further comprises a scheduler manager configured to manage the processing resource allocation of the one or more scheduler instances, and wherein changing the processing resource allocation comprises signalling the scheduler manager to change the processing resource allocation allocated for executing the one or more scheduler instances.

### Claim 7 (depends on 1)

The method of claim 1, wherein it is determined that the number of active connections of the one or more radio devices is zero and wherein the second scheduler instance is associated with a pre-existing cluster of radio devices, wherein changing the processing resource allocation comprises:
in response to determining that removal of the one or more radio devices from the given cluster is to cause the number of remaining radio devices allocated to the given cluster to fall below a predetermined threshold, causing a processing resource allocation allocated to the scheduler instance of the given cluster to be reduced.

### Claim 8 (depends on 7)

The method of claim 7, wherein causing the processing resource allocation allocated to the scheduler instance of the given cluster to be reduced comprises causing the scheduler instance of the given cluster to be powered down.

### Claim 9 (depends on 7)

The method of claim 7, wherein causing the processing resource allocation allocated to the scheduler instance of the given cluster to be reduced comprises signalling a scheduler manager of the scheduler instance to reduce the processing resource allocation of the scheduler instance or power down the scheduler instance.

### Claim 10 (depends on 1)

The method of claim 1, wherein it is determined that the number of the one or more radio devices having active connections is greater than a predetermined threshold, wherein changing the processing resource allocation comprises:
initialising the second scheduler instance and causing additional processing resources to be allocated to the second scheduler instance.

### Claim 11 (depends on 10)

The method of claim 10, wherein causing additional processing resources to be allocated to the second scheduler instance comprises signalling a scheduler manager to create the second scheduler instance and allocate additional processing resources to the second scheduler instance.

### Claim 12 (depends on 1)

The method of claim 1, wherein signalling the scheduler instance and the second scheduler instance comprises sending a message indicating the one or more radio devices to remove or adopt to the scheduler instance and the second scheduler instance.

### Claim 13 (depends on 12)

The method of claim 12, wherein the message sent to the second scheduler instance comprises one or more signatures assigned to the one or more radio devices for broadcasting by the one or more radio devices.

### Claim 14 (depends on 2)

The method of claim 2, wherein the utilisation information comprises information indicating the number of inactive radio devices in relation to the total number of radio devices in the given cluster, and information identifying the inactive radio devices.

### Claim 15 (depends on 1)

The method of claim 1, wherein the one or more scheduler instances are virtual machine instances.

### Claim 16

A computer-implemented method for a scheduler arrangement having a scheduler instance and a scheduler manager, the scheduler arrangement in a Cooperative Multi-Point network, the network comprising a plurality of radio devices, one or more clusters of radio devices of the plurality of radio devices, and a controller, the method comprising:
determining utilisation information indicative of a utilisation of one or more radio devices in a cluster associated with the scheduler instance;
sending the utilisation information to the controller;
receiving an instruction from the controller to remove or adopt a radio device of the plurality of radio devices;
removing or adopting the radio device based on the instruction to remove or adopt the radio device;
receiving an instruction to reduce a processing resource allocation allocated to the scheduler instance or to create a further scheduler instance; and
reducing a processing resource allocation allocated to the scheduler instance in response to the instruction to reduce the processing resource allocation allocated to the scheduler or allocating additional processing resources to the further scheduler instance in response to the instruction to create a further scheduler instance.

### Claim 17 (depends on 16)

The method of claim 16, wherein the utilisation information indicates the presence or absence of active connections between the one or more radio devices in the given cluster and one or more client devices.

### Claim 18 (depends on 16)

The method of claim 16, wherein reducing the processing resource allocation comprises powering down the scheduler instance.

### Claim 19 (depends on 1)

Non-transitory computer-readable media comprising instructions which, when executed by one or more processors, cause the one or more processors to perform the method of claim 1.