# US 2025/0368237 A1 · Ski resort management system

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0368237 A1
- Document ID: US20250368237A1
- Status: Published application
- Kind: A1
- Application number: 19/306,454
- Filed: 2025-08-21
- Published: 2025-12-04
- Earliest claimed: 2018-09-27
- Assignees: Skadii GmbH
- Applicants: Skadii GmbH
- Inventors: Gunter Tschinkel
- Web page: https://patentgrep.com/patent/US20250368237A1

## CPC

- B61B 11/00: Ski lift, sleigh lift or like trackless systems with guided towing cables only
- G06Q 10/0631: Resource planning, allocation, distributing or scheduling for enterprises or organisations
- E01H 4/00: Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow (production of artificial snow F25C3/04)
- F25C 3/00: Processes or apparatus specially adapted for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Producing artificial snow
- G01W 1/14: Rainfall or precipitation gauges (measuring volume in general G01F)
- E01H 4/02: for sporting purposes, e.g. preparation of ski trails; {Construction of artificial surfacings for snow or ice sports (construction of ice skating rinks E01C13/102); Trails specially adapted for on-the-snow vehicles}, e.g. devices adapted for ski-trails (production of snow or ice for winter sports or similar recreational purposes F25C3/00)
- F25C 2303/00: Special arrangements or features for producing ice or snow for winter sports or similar recreational purposes, e.g. for sporting installations; Special arrangements or features for producing artificial snow
- G01W 2001/006: {Main server receiving weather information from several sub-stations}
- B61B: RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR (lifts or hoists, elevators, escalators, moving walkways B66B)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- E01H: STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING {OR PREVENTING} FOG IN GENERAL {CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS}(cleaning in general B08B)
- F25C: PRODUCING, WORKING OR HANDLING ICE
- G01W: METEOROLOGY (radar, sonar, lidar or analogous systems, designed for meteorological use G01S13/95, G01S15/88, G01S17/95)

## Abstract

A ski resort management system comprising: a data acquisition system that receives data from telemetry systems of the lift systems, of the snow generators and of the snow groomers of the ski resort; a processing station; mass storage units, containing a system database fed by the data acquisition system; and a display interface, accessible from operator terminals. The data acquisition system stores data and signals from the lift systems, the snow generators and the snow groomers in the system database. The processing station enables setting a mode of the display interface for alternatively displaying data relative to each lift system, to each snow generator or to each snow groomer, or to display, in an aggregated form, data relative to all the lift systems, all the snow generators and all the snow groomers.

## Claims

### Claim 1

A management system for a ski resort comprising a plurality of ski runs, the management system comprising:
a system database containing ski run data, the ski run data comprising characteristics of the plurality of ski runs and snow thickness data of a snow cover on at least one of the plurality of ski runs;
a data acquisition system configured to:
receive weather data from a plurality of telemetry systems respectively associated with a weather detection system comprising a plurality of weather stations,
receive traffic data from a plurality of traffic detection systems respectively along the plurality of ski runs, the traffic data corresponding to a number of transits on the plurality of ski runs, and
cause a storage, in the system database, of the weather data and the traffic data; and
a processing station in communication with the system database, the processing station comprising a snow thickness estimator configured to:
retrieve the snow thickness data from the system database,
compute a rate of erosion of the snow cover based on the ski run data, the weather data and the traffic data,
compute a rate of growth of the snow cover based on the weather data, and
update the snow thickness data based on the computed rate of erosion and the computed rate of growth.

### Claim 2 (depends on 1)

The management system of claim 1, wherein the characteristics of the plurality of ski runs include at least one of: a starting height, a final height, length, coordinates of a reference path, a technical difficulty, an average slope, homogenous sections of slope, an exposure to the sun according to a season, and an orientation.

### Claim 3 (depends on 2)

The management system of claim 2, wherein the snow thickness estimator is configured to compute the rate of erosion of the snow cover based on at least one of: the average slope, the homogenous sections of slope, the exposure to the sun according to the season and the orientation.

### Claim 4 (depends on 1)

The management system of claim 1, wherein the weather data include at least one of: a temperature, a pressure, a humidity, a wind speed, a wind direction, a measured precipitation, a duration of preciptation, an intensity of precipitation, hours of sunlight, an actual solar radiation, a level of cloud cover and a weather map.

### Claim 5 (depends on 4)

The management system of claim 4, wherein the snow thickness estimator is configured to compute the rate of erosion of the snow cover based on at least one of: the temperature, the wind speed, the wind direction, the hours of sunlight, the actual solar radiation and the level of cloud cover.

### Claim 6 (depends on 4)

The management system of claim 4, wherein the snow thickness estimator is configured to compute the rate of growth of the snow cover based on at least one of: the temperature, the wind speed, the wind direction, the measured precipitation, the duration of preciptation, the intensity of precipitation and the weather map.

### Claim 7 (depends on 4)

The management system of claim 4, wherein the snow thickness estimator is configured to obtain actual exposure to the sun by combining the exposure to the sun according to the season and at least one of the hours of daily sunlight from a last estimate of the snow cover thickness and the hours of daily sunlight from a last measurement of the snow cover thickness, weighted as a function of the level of cloud cover.

### Claim 8

A management system for a ski resort comprising an artificial snowmaking system having a plurality of snow generators, the management system comprising:
a system database containing snow thickness data of a snow cover on at least one of a plurality of ski runs;
a data acquisition system configured to:
receive weather data from a plurality of telemetry systems respectively associated with a weather detection system comprising a plurality of weather stations, and
cause a storage, in the system database, of the weather data; and
a processing station in communication with the system database, the processing station comprising a snowmaking controller configured to:
define a snowmaking schedule for the artificial snowmaking system based on the snow thickness data and the weather data, wherein the snowmaking schedule comprises tasks assigned to at least one of the plurality of snow generators, each task being defined by at least one of a production time, a production volume target, and a water consumption target, and
enable execution of the assigned tasks by the at least one snow generator in response to an enabling condition being met based on the weather data.

### Claim 9 (depends on 8)

The management system of claim 8, wherein the weather data include at least one of: a temperature, a pressure, a humidity, a wind speed, a wind direction, a measured precipitation, a duration of preciptation, an intensity of precipitation, hours of sunlight, an actual solar radiation, a level of cloud cover, a weather map and weather forecast information.

### Claim 10 (depends on 9)

The management system of claim 9, wherein the enabling condition includes permanence of the weather data within programmed enabling intervals.

### Claim 11 (depends on 8)

The management system of claim 8, wherein the enabling condition includes operating states of the snow generators.

### Claim 12 (depends on 8)

The management system of claim 8, wherein the snowmaking controller is configured to cause at least one of a suspension of the execution of the corresponding assigned tasks and a suspection of the execution of the corresponding assigned tasks if the enabling condition is not met for at least one of the snow generator, a coordinated group of the snow generators and the artificial snowmaking system.

### Claim 13 (depends on 8)

The management system of claim 8, wherein:
the system database contains ski run data comprising characteristics of the plurality of ski runs and,
the processing station comprises a snow thickness estimator configured to:
retrieve the snow thickness data from the system database,
compute a rate of erosion of the snow cover based on ski run data, the weather data and traffic data,
compute a rate of growth of the snow cover based on the weather data, and
update the snow thickness data based on the computed rate of erosion and the computed rate of growth.

### Claim 14 (depends on 13)

The management system of claim 13, wherein the characteristics of the plurality of ski runs include at least one of: a starting height, a final height, a length, coordinates of a reference path, a technical difficulty, an average slope, homogenous sections of slope, an exposure to the sun according to a season, and an orientation.

### Claim 15

A management system for a ski resort comprising a plurality of snow groomers equipped with satellite tracking devices, the management system comprising:
a system database containing ski run data, the ski run data comprising characteristics of the plurality of ski runs;
a data acquisition system configured to receive position data, provided by the satellite tracking devices of the plurality of snow groomers through telemetry systems, of the plurality of snow groomers; and
a processing station in communication with the system database and the data acquisition system, the processing station comprising a snow groomer activity scheduling module configured to:
define preparation schedules for the plurality of ski runs based on the ski run data, and
determine a plurality of paths for the plurality of snow groomers to execute the preparation schedule by applying a path minimization algorithm to minimize movement of the plurality of snow groomers.

### Claim 16 (depends on 15)

The management system of claim 15, wherein the snow groomer activity scheduling module is configured to assign respective tasks to at least a group of the snow groomers based on the preparation schedules of the plurality of ski runs and to coordinate the execution of the tasks of the plurality of snow groomers.

### Claim 17 (depends on 15)

The management system of claim 15, wherein each preparation schedule for the ski runs comprises, based on ski run data and on the position data of the plurality of snow groomers, a list of at least one of ski runs and portions of the ski runs assigned to each snow groomer.

### Claim 18 (depends on 15)

The management system of claim 15, wherein the system database contains a connection matrix defining connections between the plurality of ski runs and the snow groomer activity scheduling module is configured to apply the path minimization algorithm starting from the connection matrix.

### Claim 19 (depends on 15)

The management system of claim 15, wherein the characteristics of the plurality of ski runs include at least one of: a starting height, a final height, a length, coordinates of a reference path, a technical difficulty, an average slope, homogenous sections of slope, an exposure to the sun according to a season, an orientation, connections with other ski runs, a serving lift system, snow thickness data of a snow cover on the plurality of ski runs, and a number of transits from traffic detection systems along the plurality of ski runs.

### Claim 20 (depends on 19)

The management system of claim 19, wherein the snow groomer activity scheduling module is configured to define the preparation schedules based on at least one of the snow thickness data, the average slope, the homogenous sections of slope and the number of transits.
