# US 2025/0361689 A1 · Construction method for reconstructing and expanding ship lock in situ

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0361689 A1
- Document ID: US20250361689A1
- Status: Published application
- Kind: A1
- Application number: 19/293,111
- Filed: 2025-08-07
- Published: 2025-11-27
- Earliest claimed: 2024-01-05
- Assignees: Hunan Water Transport Construction Investment Group Co., Ltd; Hunan Navigation Engineering Co., Ltd
- Applicants: Hunan Water Transport Construction Investment Group Co., Ltd; Hunan Navigation Engineering Co., Ltd
- Inventors: Qiankai ZHOU; Ding ZHOU; Zhiyong LU; Bin SUN; Qin ZHOU; Xiongcai KANG; Gang LI; Hui SONG; Wei YU; Fang LIU; Yun ZHANG
- Web page: https://patentgrep.com/patent/US20250361689A1

## CPC

- E02C 1/00: Locks {or dry-docks}; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass (lock gates E02B7/20 {dry-dock equipment; naval construction aspects B63C1/00; floating docks B63C1/02})
- Y02A 10/30: Flood prevention; Flood or storm water management, e.g. using flood barriers
- E02C: SHIP-LIFTING DEVICES OR MECHANISMS
- Y02A: TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE

## Abstract

A construction method for reconstructing and expanding a ship lock in suit is provided. A flood gate in an upper lock head section of a constructed ship lock is used as a water-retaining cofferdam during a construction period. A remaining part of the constructed ship lock is cut off downstream from a target cutting surface located in a lock chamber section of the constructed ship lock, and a new ship lock is constructed downstream. A bank-side pier structure between the upper lock head section of the constructed ship lock and the new ship lock is cut to a first preset elevation, and two water-retaining and seepage control lines are added, and a cutoff buttress is constructed. An upper navigation wall section of the constructed ship lock and the upper lock head section of the constructed ship lock are reconstructed, and another water-retaining and seepage control line is added.

## Claims

### Claim 1

A construction method for reconstructing and expanding a ship lock in situ, comprising the following steps:
S1, taking a flood gate in an upper lock head section of a constructed ship lock as a water-retaining cofferdam during a construction period, cutting off a remaining part of the constructed ship lock downstream from a target cutting surface located in a lock chamber section of the constructed ship lock, wherein the target cutting surface is at a preset distance from the flood gate, and the target cutting surface is perpendicular to an extension direction of the constructed ship lock;
S2, constructing a new ship lock downstream from the target cutting surface, wherein an upper lock head section of the new ship lock is connected to the target cutting surface, and an entrance width of the new ship lock is larger than that of the constructed ship lock;
S3, cutting a bank-side pier structure between the upper lock head section of the constructed ship lock and the upper lock head section of the new ship lock to a first preset elevation, wherein a difference between a lowest design navigable water level of the constructed ship lock and the first preset elevation meets a navigable requirement;
S4, adding a first water-retaining and seepage control line and a second water-retaining and seepage control line, wherein the first water-retaining and seepage control line corresponds to the upper lock head section of the constructed ship lock, the second water-retaining and seepage control line is located between the upper lock head section of the constructed ship lock and the upper lock head section of the new ship lock, an upstream end of the first water-retaining and seepage control line is connected to an original water-retaining and seepage control line of the constructed ship lock, and an upstream end of the second water-retaining and seepage control line is connected to a downstream end of the first water-retaining and seepage control line;
S5, constructing a cutoff buttress at a position corresponding to the upper lock head section of the new ship lock, and reconstructing an upper navigation wall section and the upper lock head section of the constructed ship lock to enable a navigable width of the constructed ship lock to match the entrance width of the new ship lock, wherein the cutoff buttress is inserted into a bank-side soil body from the upper lock head section of the new ship lock in a direction perpendicular to a water flow; and
S6, adding a third water-retaining and seepage control line, wherein the third water-retaining and seepage control line corresponds to the upper lock head section of the new ship lock and the cutoff buttress and extends in the direction perpendicular to the water flow, a river-side end of the third water-retaining and seepage control line is connected to a downstream end of the second water-retaining and seepage control line, and a bank-side end of the third water-retaining and seepage control line is located in the bank-side soil body.

### Claim 2 (depends on 1)

The construction method for reconstructing and expanding a ship lock in situ according to claim 1, wherein the method further comprises the following steps between step S3 and step S4:
S31: reinforcing a river-side pier structure between the upper lock head section of the constructed ship lock and the upper lock head section of the new ship lock.

### Claim 3 (depends on 2)

The construction method for reconstructing and expanding a ship lock in situ according to claim 2, wherein “reinforcing a river-side pier structure between the upper lock head section of the constructed ship lock and the upper lock head section of the new ship lock” in step S31 specifically comprises the following steps:
S311: constructing a reinforcing retaining wall on an inner side of the river-side pier structure, wherein the bottom of the reinforcing retaining wall is fastened to a bottom plate of the lock chamber section of the constructed ship lock by implanting an anchoring steel bar, a sidewall of the reinforcing retaining wall is fastened to the river-side pier structure by implanting the anchoring steel bar, and the second water-retaining and seepage control line is arranged on an inner side of the reinforcing retaining wall.

### Claim 4 (depends on 3)

The construction method for reconstructing and expanding a ship lock in situ according to claim 3, wherein after step S311, the method further comprises the following steps:
S312: implanting a prestressed anchor cable into the reinforcing retaining wall, wherein the prestressed anchor cable penetrates through the reinforcing retaining wall downwards from the top thereof and is fastened to the bottom plate of the lock chamber section of the constructed ship lock.

### Claim 5 (depends on 3)

The construction method for reconstructing and expanding a ship lock in situ according to claim 3, wherein “reconstructing an upper navigation wall section and the upper lock head section of the constructed ship lock” in step S5 specifically comprises the following steps:
S51: sequentially cutting off the upper lock head section of the constructed ship lock and a bank-side part structure of the upper navigation wall section of the constructed ship lock upstream along an inner wall of the bank-side pier structure, thereby enabling the navigable width of the constructed ship lock to match the entrance width of the new ship lock; and
S52: cutting off a river-side part structure of the upper lock head section of the constructed ship lock upstream along an inner wall of the river-side pier structure, thereby connecting the upper lock head section of the constructed ship lock to the reinforcing retaining wall.

### Claim 6 (depends on 1)

The construction method for reconstructing and expanding a ship lock in situ according to claim 1, wherein the method further comprises the following steps between step S3 and step S4:
S32: replacing and filling an internal backfill between the bank-side pier structure and a river embankment to the first preset elevation with C20 concrete.

### Claim 7 (depends on 3)

The construction method for reconstructing and expanding a ship lock in situ according to claim 3, wherein a thickness of the reinforcing retaining wall ranges from 2.8 m to 3.2 m, and a height of the reinforcing retaining wall is 4-6 m higher than the top of the river-side pier structure.

### Claim 8 (depends on 1)

The construction method for reconstructing and expanding a ship lock in situ according to claim 1, wherein after step S3, the method further comprises the following steps:
pouring the bank-side pier structure to a second preset elevation after implanting the steel bar into the top thereof, thereby leveling a top surface of the bank-side pier structure.