# US 2025/0326323 A1 · Apparatus, Systems, and Methods for Predictive Electrical Load Management of Electric Vehicle Chargers

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0326323 A1
- Document ID: US20250326323A1
- Status: Published application
- Kind: A1
- Application number: 19/252,388
- Filed: 2025-06-27
- Published: 2025-10-23
- Earliest claimed: 2022-12-29
- Assignees: Weev Energy B.F. Ltd
- Applicants: Weev Energy B.F. Ltd
- Inventors: Adi Baron; Ariela Blumer
- Web page: https://patentgrep.com/patent/US20250326323A1

## CPC

- B60L 53/68: Off-site monitoring or control, e.g. remote control
- B60L 53/62: in response to charging parameters, e.g. current, voltage or electrical charge
- B60L 53/63: in response to network capacity
- B60L 53/64: Optimising energy costs, e.g. responding to electricity rates
- B60L 53/65: involving identification of vehicles or their battery types
- B60L 53/66: Data transfer between charging stations and vehicles
- B60L 53/67: Controlling two or more charging stations
- G05B 13/0265: {the criterion being a learning criterion}
- B60L 2260/46: by self learning
- G06Q 10/02: Reservations, e.g. for tickets, services or events
- Y02T 10/70: Energy storage systems for electromobility, e.g. batteries
- Y02T 10/7072: Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
- Y02T 90/12: Electric charging stations
- Y02T 90/167: Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
- B60L: PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES (arrangements or mounting of electrical propulsion units or of plural diverse prime-movers for mutual or common propulsion in vehicles B60K1/00, B60K6/20; arrangements or mounting of electrical gearing in vehicles B60K17/12, B60K17/14; preventing wheel slip by reducing power in rail vehicles B61C15/08; dynamo-electric machines H02K; control or regulation of electric motors H02P); SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES (electric coupling devices combined with mechanical couplings of vehicles B60D1/64; electric heating for vehicles B60H1/00); ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL (control or regulation of electric motors H02P); MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- Y02T: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION

## Abstract

Apparatus, systems, and methods for charging electric vehicles (EVs) at an EV charging site having a plurality of EV chargers, controlling by a management server the charging performed by a plurality of EV chargers at a charging site when connectivity quality between the management server and any of the EV chargers may be unstable, and electrical load reserve for use by an EV charging system of a site.

## Claims

### Claim 1

A method for charging a plurality of electric vehicles (EVs) at an EV charging site, the method comprising:
collecting, by a management server, a first dataset that is indicative of electric vehicle charging characteristics of each EV user of a plurality of EV users, wherein each EV user of the plurality of EV users is associated with at least one EV of the plurality of EVs;
collecting, by the management server, a second dataset that is indicative of electrical properties of the EV charging site, wherein the EV charging site comprises a plurality of EV chargers connected to an electric infrastructure of the EV charging site, and wherein each EV charger of the plurality of EV chargers is configured to charge a respective EV of the plurality of EVs;
collecting, by the management server, a third dataset that is indicative of electricity prices in a region in which the EV charging site is located;
determining, by the management server, a real-time state of each EV charger of the plurality of EV chargers;
generating an EV charging plan for the EV charging site based on the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers;
developing, by the management server and based on the EV charging plan, a schedule for charging each EV charger of the plurality of EV chargers;
causing, by the management server, each EV charger of the plurality of EV chargers to operate according to the schedule;
continuously monitoring in real-time, by the management server, the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers; and
updating in real-time, by the management server, the EV charging plan and the schedule based on any changes detected by the management server in the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers.

### Claim 2 (depends on 1)

The method of claim 1, wherein the second dataset comprises an electrical load capacity of the EV charging site.

### Claim 3 (depends on 1)

The method of claim 1, wherein the EV charging plan is generated to fulfill respective charging requirements of each EV user of the plurality of EV users at the EV charging site before the EV user desires to disconnect the EV user's EV from the EV charging site.

### Claim 4 (depends on 1)

The method of claim 1, wherein the EV charging plan is generated to charge each EV of the plurality of EVs at a lowest total price for electricity.

### Claim 5 (depends on 1)

The method of claim 1, wherein the EV charging plan is generated to prevent a power outage due to overload at the EV charging site.

### Claim 6 (depends on 1)

The method of claim 1, wherein updating of the schedule further comprises rescheduling the charging of the at least one of the plurality of EVs based on an updated adjusted EV charging plan.

### Claim 7 (depends on 1)

The method of claim 1, wherein generating the EV charging plan further comprises applying in real-time a set of rules to the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers.

### Claim 8 (depends on 1)

The method of claim 1, wherein generating the EV charging plan further comprises applying in real-time a machine learning model to the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers.

### Claim 9 (depends on 1)

The method of claim 1, further comprising:
receiving EV information associated with each EV user of the plurality of EVs.

### Claim 10 (depends on 1)

The method of claim 1, wherein the real-time state of each EV charger of the plurality of EV chargers comprises an activation status.

### Claim 11

An apparatus comprising:
a processing circuitry; and
memory, the memory comprising instructions that, when executed by the processing circuitry, cause the apparatus to:
collect a first dataset that is indicative of electric vehicle charging characteristics of each EV user of a plurality of EV users, wherein each EV user is associated with at least one EV of a plurality of EVs at an EV charging site;
collect a second dataset that is indicative of electrical properties of the EV charging site, wherein the EV charging site comprises a plurality of EV chargers connected to an electric infrastructure of the EV charging site, and wherein each EV charger of the plurality of EV chargers is configured to charge a respective EV of the plurality of EVs;
collect a third dataset that is indicative of electricity prices in a region in which the EV charging site is located;
determine a real-time state of each EV charger of the plurality of EV chargers;
generate an EV charging plan for the EV charging site based on the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers; and
develop, based on the EV charging plan, a schedule for charging operation of each EV charger of the plurality of EV chargers;
cause each EV charger of the plurality of EV chargers to operate according to the schedule;
continuously monitor in real-time the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers; and
update in in real-time the EV charging plan and schedule based on any changes detected by the apparatus in the first dataset, the second dataset, the third dataset, and
the real-time state of each of the EV chargers.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein the second dataset comprises an electrical load capacity of the EV charging site.

### Claim 13 (depends on 11)

The apparatus of claim 11, wherein the EV charging plan fulfills respective charging requirements of each EV user of the plurality of EV users at the EV charging site before the EV user desires to disconnect the EV user's EV from the EV charging site.

### Claim 14 (depends on 11)

The apparatus of claim 11, wherein the EV charging plan is such as to charge each EV of the plurality of EVs at a lowest total price for electricity.

### Claim 15 (depends on 11)

The apparatus of claim 11, wherein the generated EV charging plan is adapted to prevent a power outage due to overload at the EV charging site.

### Claim 16 (depends on 11)

The apparatus of claim 11, wherein the instructions, when executed by the processing circuitry, cause the apparatus to update the schedule by rescheduling charging of the at least one EV of the plurality of EVs based on an updated adjusted EV charging plan.

### Claim 17 (depends on 11)

The apparatus of claim 11, wherein the instructions, when executed by the processing circuitry, cause the apparatus to generate the EV charging plan by applying in real-time a set of rules to the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers.

### Claim 18 (depends on 11)

The apparatus of claim 11, wherein the instructions, when executed by the processing circuitry, cause the apparatus to: generate the EV charging plan by applying in real-time a machine learning model to the first dataset, the second dataset, the third dataset, and the real-time state of each EV charger of the plurality of EV chargers.

### Claim 19 (depends on 11)

The apparatus of claim 11, wherein the instructions, when executed by the processing circuitry, cause the apparatus to:
receive EV information associated with each EV of the plurality of EVs.

### Claim 20 (depends on 11)

The apparatus of claim 11, wherein the real-time state of cach EV charger comprises an activation status.
