# US 2025/0290259 A1 · Formwork system and method

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0290259 A1
- Document ID: US20250290259A1
- Status: Published application
- Kind: A1
- Application number: 18/067,265
- Filed: 2022-12-16
- Published: 2025-09-18
- Earliest claimed: 2022-12-16
- Assignees: Peri SE
- Applicants: Peri SE
- Inventors: Julian Huber; Andrew Read; Florian Sturm; Stefan Pfister
- Web page: https://patentgrep.com/patent/US20250290259A1

## CPC

- E01D 19/02: Piers {(E01D19/005 takes precedence; towers for suspension bridges E01D19/14)}; Abutments (foundations E02D ){; Protecting same against drifting ice (against colliding vehicles E01F15/00)}
- E01D 21/00: Methods or apparatus specially adapted for erecting or assembling bridges
- E01D 19/14: Towers; Anchors {; Connection of cables to bridge parts}; Saddle supports
- E04G 3/24: specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons (E04G3/28 takes precedence; {E04G1/362, E04G3/305 take precedence; scaffolding usable on slipways and in dry docks B63C5/02})
- E04G 5/141: {with an access door or the like therefor}
- E04G 13/066: {for overhangs}
- E01D 2101/26: reinforced
- E01D: CONSTRUCTION OF BRIDGES, {ELEVATED ROADWAYS} OR VIADUCTS; ASSEMBLY OF BRIDGES (bridges extending between terminal buildings and aircraft for embarking or disembarking passengers B64F1/305; {tracks for special kinds of railways E01B25/00; culverts E01F5/005})
- E04G: SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS

## Abstract

A formwork system for a bridge pier configured to support loads associated with bridge pier construction with reduced, or being free of, anchors in the column.

## Claims

### Claim 1

A formwork system, comprising:
at least one beam configured to be positioned at a first height relative to a column;
at least one transverse beam configured to be positioned at a second height below the first height and transverse to a longitudinal direction of the at least one beam;
at least one strut coupled, directly or indirectly, to the at least one beam and coupled, directly or indirectly, to the at least one transverse beam;
at least one rod coupled, directly or indirectly, to the at least one transverse beam.

### Claim 2 (depends on 1)

The system of claim 1, wherein the at least one rod is coupled, directly or indirectly, to the at least one beam such that a vertical load is transferred to the at least one beam via the at least one rod.

### Claim 3 (depends on 1)

The system of claim 1, further comprising:
at least one bracing shoe configured to be positioned at a third height relative to the column, the at least one rod coupled, directly or indirectly, to the bracing shoe such that a vertical load is transferred to the column via the bracing shoe.

### Claim 4 (depends on 1)

The system of claim 1, further comprising:
a holding element coupled to the beam; and
a second transverse beam arranged transverse to the longitudinal axis of the at least one beam and coupled to the holding element, the at least one strut coupled to the second transverse beam.

### Claim 5 (depends on 1)

The system of claim 1, further comprising:
a spanner coupled indirectly to the strut, the spanner being configured to receive the at least one rod.

### Claim 6 (depends on 1)

The system of claim 1, wherein the at least one transverse beam comprises a plurality of transverse beams and further comprising a plurality of spindles coupled to the plurality of transverse beams.

### Claim 7 (depends on 1)

The system of claim 1, wherein the at least one strut is adjustable in length.

### Claim 8 (depends on 1)

The system of claim 1, wherein the at least one beam, the at least one transverse beam, the at least one rod, and the at least one strut define a generally triangular configuration.

### Claim 9 (depends on 1)

The system of claim 1, wherein the at least one strut comprises a plurality of struts and the at least one rod comprises a plurality of rods such that and each transverse beam is indirectly coupled to at least two of the plurality of struts and indirectly coupled to at least two of the plurality of rods.

### Claim 10

A formwork system, comprising:
at least one beam configured to be positioned at a first height relative to a column;
at least one transverse beam configured to be positioned at a second height relative to the column;
at least one strut coupled, directly or indirectly, to the at least one beam and coupled, directly or indirectly, to the at least one transverse beam;
at least one rod coupled, directly or indirectly, to the at least one transverse beam and a) coupled, directly or indirectly, to the at least one beam such that a vertical load is transferred to the at least one beam, or b) coupled, directly or indirectly, to the column such that a vertical load is transferred to the at least one column.

### Claim 11

A formwork system for a bridge pier, comprising:
at least one beam configured to be positioned at a first height relative to a column of the bridge pier and configured to support pouring a cap of the bridge pier;
at least one transverse beam configured to be positioned at a second height relative to the column;
at least one strut coupled, directly or indirectly, to the at least one beam and coupled, directly or indirectly, to the at least one transverse beam;
at least one rod coupled, directly or indirectly, to the at least one transverse beam.

### Claim 12 (depends on 11)

The formwork system of claim 11, wherein the at least one transverse beam comprises a pair of transverse beams on opposite sides of the column.

### Claim 13 (depends on 12)

The formwork system of claim 12, wherein the pair of transverse beams are coupled by a spindle.

### Claim 14

A formwork system, comprising:
at least one beam configured to be positioned at a first height relative to a column;
at least one transverse beam configured to be positioned at a second height below the first height and transverse to a longitudinal direction of the at least one beam;
at least one strut coupled, directly or indirectly, to the at least one beam and coupled, directly or indirectly, to the at least one transverse beam;
at least one prop coupled, directly or indirectly, to the at least one transverse beam.