# US 2025/0278083 A1 · Time varying performance indication system for connected equipment

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0278083 A1
- Document ID: US20250278083A1
- Status: Published application
- Kind: A1
- Application number: 19/211,019
- Filed: 2025-05-16
- Published: 2025-09-04
- Earliest claimed: 2019-01-10
- Assignees: Johnson Controls Technology Company
- Applicants: Johnson Controls Technology Company
- Inventors: Steven R. Vitullo; Kelsey C. Schuster; Michael R. Rhodes; Riley P. Shelton; John F. Kuchler
- Web page: https://patentgrep.com/patent/US20250278083A1

## CPC

- G05B 23/0283: {Predictive maintenance, e.g. involving the monitoring of a system and, based on the monitoring results, taking decisions on the maintenance schedule of the monitored system; Estimating remaining useful life [RUL] (preventive maintenance, i.e. planning maintenance according to the available resources without monitoring the system G06Q10/06)}
- G05B 23/0294: {Optimizing process, e.g. process efficiency, product quality}
- G05B 17/02: electric
- G05B 23/0221: {Preprocessing measurements, e.g. data collection rate adjustment; Standardization of measurements; Time series or signal analysis, e.g. frequency analysis or wavelets; Trustworthiness of measurements; Indexes therefor; Measurements using easily measured parameters to estimate parameters difficult to measure; Virtual sensor creation; De-noising; Sensor fusion; Unconventional preprocessing inherently present in specific fault detection methods like PCA-based methods}
- G05B 23/0235: {based on a comparison with predetermined threshold or range, e.g. "classical methods", carried out during normal operation; threshold adaptation or choice; when or how to compare with the threshold}
- G05B 23/0251: {Abstraction hierarchy, e.g. "complex systems", i.e. system is divided in subsystems, subsystems are monitored and results are combined to decide on status of whole system}
- G05B 23/0264: {Control of logging system, e.g. decision on which data to store; time-stamping measurements}
- G05B 2219/2614: HVAC, heating, ventillation, climate control
- G05B 2219/2642: Domotique, domestic, home control, automation, smart house
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

A system includes equipment operable to affect, monitor, or control one or more variable states or conditions in a building, a sensor configured to measure a variable relating to performance of the equipment, and a control system. The control system is configured to perform performance checks for the equipment using a measurement from the sensor and determine individual performance check indicators based on the performance checks. The individual performance check indicators indicate events having different timings and severities. The control system is configured to generate an overall performance index for the equipment using the individual performance check indicators and weights based on the different timings and severities of the events indicated by the individual performance check indicators. The control system is configured to cause an adjustment to the equipment by initiating or executing a preventative maintenance action for the equipment based on the overall performance index.

## Claims

### Claim 1

A system comprising:
equipment operable to affect, monitor, or control one or more variable states or conditions in a building;
a sensor configured to measure a variable relating to performance of the equipment; and
a control system configured to:
perform a plurality of performance checks for the equipment using a measurement from the sensor;
determine a plurality of individual performance check indicators based on the plurality of performance checks, the plurality of individual performance check indicators indicating events having different timings and severities;
generate an overall performance index for the equipment using the plurality of individual performance check indicators and a plurality of weights based on the different timings and severities of the events indicated by the plurality of individual performance check indicators; and
cause an adjustment to the equipment by initiating or executing a preventative maintenance action for the equipment based on the overall performance index.

### Claim 2 (depends on 1)

The system of claim 1, wherein performing the plurality of performance checks comprises detecting deviations between a plurality of monitored variables associated with the equipment and a plurality of predetermined values.

### Claim 3 (depends on 1)

The system of claim 1, wherein the plurality of weights comprise first weights based on the different timings and second weights based on the severities.

### Claim 4 (depends on 1)

The system of claim 1, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the timings of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have more recent timings and lower weights for events that have less recent timings.

### Claim 5 (depends on 1)

The system of claim 1, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the severities of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have higher severities and lower weights for events that have lower severities.

### Claim 6 (depends on 1)

The system of claim 1, wherein:
the events comprise occurrences of a plurality of alarms having different severities; and
generating the overall performance index for the equipment comprises using a weight associated with an active alarm of the plurality of alarms having a highest severity of the different severities.

### Claim 7 (depends on 1)

The system of claim 1, wherein the equipment comprises one or more chillers, air handling units, actuators, controllers, boilers, economizers, valves, dampers, cooling towers, fans, pumps, lighting equipment, security equipment, refrigeration equipment, HVAC equipment, or sensors.

### Claim 8 (depends on 1)

The system of claim 1, wherein initiating or executing the preventative maintenance action comprises at least one of scheduling the preventative maintenance action in a maintenance scheduling system, providing an alert message to a user or a user interface, proactively repairing or replacing the equipment before a fault occurs, or adjusting a control algorithm for the equipment to repair the fault or work-around the fault.

### Claim 9

A method comprising:
operating equipment to affect, monitor, or control one or more variable states or conditions in a building;
measuring, by a sensor, a variable relating to performance of the equipment;
performing a plurality of performance checks for the equipment using a measurement from the sensor;
determining a plurality of individual performance check indicators based on the plurality of performance checks, the plurality of individual performance check indicators indicating events having different timings and severities;
generating an overall performance index for the equipment using the plurality of individual performance check indicators and a plurality of weights based on the different timings and severities of the events indicated by the plurality of individual performance check indicators; and
causing an adjustment to the equipment by initiating or executing a preventative maintenance action for the equipment based on the overall performance index.

### Claim 10 (depends on 9)

The method of claim 9, wherein performing the plurality of performance checks comprises detecting deviations between a plurality of monitored variables associated with the equipment and a plurality of predetermined values.

### Claim 11 (depends on 9)

The method of claim 9, wherein the plurality of weights comprise first weights based on the different timings and second weights based on the severities.

### Claim 12 (depends on 9)

The method of claim 9, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the timings of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have more recent timings and lower weights for events that have less recent timings.

### Claim 13 (depends on 9)

The method of claim 9, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the severities of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have higher severities and lower weights for events that have lower severities.

### Claim 14 (depends on 9)

The method of claim 9, wherein:
the events comprise occurrences of a plurality of alarms having different severities; and
generating the overall performance index for the equipment comprises using a weight associated with an active alarm of the plurality of alarms having a highest severity of the different severities.

### Claim 15 (depends on 9)

The method of claim 9, wherein the equipment comprises one or more chillers, air handling units, actuators, controllers, boilers, economizers, valves, dampers, cooling towers, fans, pumps, lighting equipment, security equipment, refrigeration equipment, HVAC equipment, or sensors.

### Claim 16 (depends on 9)

The method of claim 9, wherein initiating or executing the preventative maintenance action comprises at least one of scheduling the preventative maintenance action in a maintenance scheduling system, providing an alert message to a user or a user interface, proactively repairing or replacing the equipment before a fault occurs, or adjusting a control algorithm for the equipment to repair the fault or work-around the fault.

### Claim 17

One or more non-transitory computer-readable media storing computer-executable instructions that, when executed by at least one processor, cause the at least one processor to perform operations comprising:
operating equipment to affect, monitor, or control one or more variable states or conditions in a building;
receiving a measurement from a sensor configured measure a variable relating to performance of the equipment;
performing a plurality of performance checks for the equipment using the measurement;
determining a plurality of individual performance check indicators based on the plurality of performance checks, the plurality of individual performance check indicators indicating events having different timings and severities;
generating an overall performance index for the equipment using the plurality of individual performance check indicators and a plurality of weights based on the different timings and severities of the events indicated by the plurality of individual performance check indicators; and
causing an adjustment to the equipment by initiating or executing a preventative maintenance action for the equipment based on the overall performance index.

### Claim 18 (depends on 17)

The non-transitory computer-readable media of claim 17, wherein performing the plurality of performance checks comprises detecting deviations between a plurality of monitored variables associated with the equipment and a plurality of predetermined values.

### Claim 19 (depends on 17)

The non-transitory computer-readable media of claim 17, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the timings of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have more recent timings and lower weights for events that have less recent timings.

### Claim 20 (depends on 17)

The non-transitory computer-readable media of claim 17, wherein generating the overall performance index for the equipment using the plurality of individual performance check indicators and the plurality of weights comprises:
determining the severities of the events indicated by the plurality of individual performance check indicators; and
using higher weights for events that have higher severities and lower weights for events that have lower severities.
