# US 2025/0220670 A1 · A configuration based on configured grant uplink control information

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0220670 A1
- Document ID: US20250220670A1
- Status: Published application
- Kind: A1
- Application number: 18/852,000
- Filed: 2023-03-28
- Published: 2025-07-03
- Earliest claimed: 2022-03-28
- Assignees: Lenovo (Singapore) Pte. Ltd.
- Applicants: Lenovo (Singapore) Pte. Ltd.
- Inventors: Hossein Bagheri; Razvan-Andrei Stoica; Joachim Löhr; Alexander Golitschek Edler von Elbwart; Hyejung Jung; Vijay Nangia
- Web page: https://patentgrep.com/patent/US20250220670A1

## CPC

- H04W 72/21: in the uplink direction of a wireless link, i.e. towards the network
- H04W 72/23: in the downlink direction of a wireless link, i.e. towards a terminal
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Apparatuses, methods, and systems are disclosed for a configuration based on configured grant (“CG”) uplink control information (“UCI”) (“CG-UCI”). One method includes initiating, at a user equipment (“UE”), a channel occupancy time (“COT”) by transmitting a first configured grant uplink (“UL”) transmission. The method includes including a first CG-UCI in the first configured grant UL transmission. The first CG-UCI indicates a first offset, a first duration, or a combination thereof. The method includes determining a first downlink (“DL”) transmission starting time based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is sent. The method includes determining whether a delay budget for an UL application data unit (“ADU”), packet, or a combination thereof is less than a threshold value.

## Claims

### Claim 1

A user equipment (UE), comprising:
at least one memory; and
at least one processor coupled with the at least one memory and configured to cause the UE to:
transmit a first configured grant (CG) uplink (UL) transmission, wherein the first CG UL transmission initiates a channel occupancy time (COT), wherein;
the first CG UL transmission includes a first CG uplink control information (UCI) (CG-UCI), and wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof;
determine a first starting time for downlink (DL) transmission based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is transmitted;
determine whether a delay budget for an UL application data unit (ADU), packet, or a combination thereof is less than a threshold value; and
determine a second starting time for DL transmission, a second duration or a combination thereof based on:
whether the delay budget is less than the threshold value;
the first offset, the first duration, an un-transmitted portion of the UL ADU, packet, or the combination thereof;
or a combination thereof, wherein:
the second starting time is different than the first starting time, the second duration is different than the first duration, or a combination thereof;
the UE does not expect to receive transmission in the COT prior to the second starting time; and
the UE does not expect to receive DL transmission in the COT for a duration larger than the second duration.

### Claim 2 (depends on 1)

The UE of claim 1, wherein a second CG-UCI is included in a second CG UL transmission, and the second CG-UCI indicates a second offset, the second duration, or a combination thereof.

### Claim 3 (depends on 2)

The UE of claim 2, wherein the secondCG UL transmission occurs at least a certain time after the first CG UL transmission.

### Claim 4 (depends on 1)

The UE of claim 1, wherein the second starting time occurs at least a certain time earlier than the first starting time.

### Claim 5 (depends on 1)

The UE of claim 1, wherein the second duration is greater than the first duration.

### Claim 6 (depends on 1)

The UE of claim 1, wherein the threshold value is configured by higher layer signaling.

### Claim 7 (depends on 1)

The UE of claim 1, wherein the delay budget is exceeded.

### Claim 8 (depends on 7)

The UE of claim 7, wherein the at least one processor is configured to cause the UE to drop a transmission of a remainder of the UL ADU, packet, or the combination thereof.

### Claim 9 (depends on 8)

The UE of claim 8, wherein the second starting time is at or later than a time at which the transmission of the remainder of the UL ADU, packet, or the combination thereof is dropped.

### Claim 10 (depends on 8)

The UE of claim 8, wherein the at least one processor is configured to cause the UE to indicate to a network device that the delay budget is exceeded, that the transmission of the remainder of the UL ADU, packet, or the combination thereof is to be dropped, or a combination thereof.

### Claim 11 (depends on 8)

The UE of claim 8, wherein the second starting time, the second duration, or a combination thereof is further based on a time at which the transmission of the remainder of the UL ADU, packet, or the combination thereof is dropped.

### Claim 12 (depends on 1)

The apparatus UE of claim 1, wherein the at least one processor is configured to cause the UE to determine a set of UL extended reality (XR) poses to be canceled based on a delay budget for a DL ADU, packet, or a combination thereof, an UL ADU, packet, or a combination thereof, or a combination thereof being exceeded.

### Claim 13 (depends on 12)

The apparatus UE of claim 12, wherein the at least one processor is configured to cause the apparatus UE to indicate the set of UL XR poses to a network device.

### Claim 14 (depends on 1)

The apparatus UE of claim 1, wherein the at least one processor is configured to cause the UE to receive an indication that the delay budget for a DL ADU, packet, or a combination thereof is exceeded or to be exceeded within a certain time, wherein, in response to the indication, the at least one processor is configured to cause the UE to determine a set of UL extended reality (XR) poses to be canceled, muted, or a combination thereof.

### Claim 15

A method performed by a user equipment (UE), the method comprising:
transmit a first configured grant (CG) uplink (UL) transmission, wherein the first CG UL transmission initiates a channel occupancy time (COT), wherein;
the first CG UL transmission includes a CG uplink control information (UCI) (CG-UCI), and wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof;
determining a first starting time for downlink (DL) transmission based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is transmitted;
determining whether a delay budget for an UL application data unit (ADU), packet, or a combination thereof is less than a threshold value; and
determining a second starting time for DL transmission, a second duration or a combination thereof based on:
whether the delay budget is less than the threshold value;
the first offset, the first duration, an un-transmitted portion of the UL ADU, packet, or the combination thereof;
or a combination thereof, wherein:
the second starting time is different than the first starting time, the second duration is different than the first duration, or a combination thereof;
the UE does not expect to receive DL transmission in the COT prior to the second starting time; and
the UE does not expect to receive DL transmission in the COT for a duration larger than the second duration.

### Claim 16

A processor for wireless communication, comprising:
at least one controller coupled with at least one memory and configured to cause the processor to:
transmit a first configured grant (CG) uplink (UL) transmission, wherein the first CG UL transmission initiates a channel occupancy time (COT), wherein the first CG UL transmission includes a first CG uplink control information (UCI) (CG-UCI), and wherein the first CG-UCI indicates a first offset, a first duration, or a combination thereof;
determine a first starting time for downlink (DL) transmission based on the first offset, the first duration, or the combination thereof and a time that the first CG-UCI is transmitted;
determine whether a delay budget for an UL application data unit (ADU), packet, or a combination thereof is less than a threshold value; and
determine a second starting time for DL transmission, a second duration or a combination thereof based on:
whether the delay budget is less than the threshold value;
the first offset, the first duration, an un-transmitted portion of the UL ADU, packet, or the combination thereof,
or a combination thereof, wherein:
the second starting time is different than the first starting time, the second duration is different than the first duration, or a combination thereof,
the processor does not expect to receive DL transmission in the COT prior to the second starting time; and
the processor does not expect to receive DL transmission in the COT for a duration larger than the second duration.

### Claim 17 (depends on 16)

The processor of claim 16, wherein a second CG-UCI is included in a second CG UL transmission, and the second CG-UCI indicates a second offset, the second duration, or a combination thereof.

### Claim 18 (depends on 17)

The processor of claim 17, wherein the second CG UL transmission occurs at least a certain time after the first CG UL transmission.

### Claim 19 (depends on 16)

The processor of claim 16, wherein the second starting time occurs at least a certain time earlier than the first starting time.

### Claim 20 (depends on 16)

The processor of claim 16, wherein the second duration is greater than the first duration.
