# US 2025/0211529 A1 · Method for implementing and evaluating tsn traffic scheduling

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0211529 A1
- Document ID: US20250211529A1
- Status: Published application
- Kind: A1
- Application number: 18/836,752
- Filed: 2023-01-10
- Published: 2025-06-26
- Earliest claimed: 2022-02-22
- Assignees: Nestfield Co., Ltd.
- Applicants: Nestfield Co., Ltd
- Inventors: Seung Ho HONG; Junhui JIANG; Won Seok SONG
- Web page: https://patentgrep.com/patent/US20250211529A1

## CPC

- H04L 47/10: Flow control; Congestion control
- H04L 45/02: Topology update or discovery
- H04L 45/38: {Flow based routing}
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

A time-sensitive network (TSN) standardized, maintained, and managed by the IEEE 802.1 Task Group improves the real-time and deterministic capabilities of Ethernet. However, traffic scheduling has not been standardized, and is being widely studied. Most research is essentially theoretical, and there are few practical verifications/research. In order to fill such a gap, the present invention provides detailed instructions for constructing an actual TSN-based process automation system first and regarding how a traffic scheduling method (TSM) will be distributed to industrial facilities. The present applicants empirically investigated the validity of a method according to the present invention and compared the performance thereof with that of a commercial TSN scheduler. The result shows that the method according to the present invention accurately schedules traffic such that robust real-time requirements are satisfied, and removes queuing delay, thereby accomplishing ultra-low latency.

## Claims

### Claim 1

A method performed in a control apparatus of an industrial automation system, the method comprising:
a step of performing a network partition by dividing a network into subnetworks and adjusting a traffic flow specification based on a network topology (G), traffic flow specification (F) and a routing path (p(srci,dsti)fi); and
a scheduling step of determining a message transmission start instant (FMTIisrci) and Gate Control List (GCL) for opening or closing a switch (SW) on a routing path at a specific time for each traffic flow, based on the subnetworks (G′), the adjusted traffic flow specifications (F′), and a link specification (link speed and length).

### Claim 2 (depends on 1)

The method according to claim 1, wherein the step of performing the network partition includes:
acquiring a branch node by filtering a switch that constitutes the network topology, and
confirming whether the branch node is included in each routing path and dividing the network into subnetworks.

### Claim 3 (depends on 1)

The method according to claim 1, wherein the scheduling step includes:
a procedure of determining a time division interval (TDIk) for the switch;
determining a time slot number (TSTCDK) and a time slot allotment interval (TSAIi) that are allotted to a time critical interval (TCIk) constituting the time division interval;
determining a message transmission start instant (FMTIisrci) of a talker (transmitter) and a message transmission start instant of the switch (FMTIiSWk) on the routing path by allotting a specific time slot of the the time critical interval (TCIk) to each traffic flow; and
generating the Gate Control List (GCL) using the determined message transmission start instant of the switch determined.

### Claim 4

A control system of an industrial automation system, the control system comprising:
a central network configurator (CNC) configured to:
receive, as inputs, a network topology (G), a traffic flow specification (F) link specification (link speed and length) to calculate a routing path (p(srci,dsti)fi), and
generate a message transmission start instant (FMTIisrci) of a talker (transmitter) and a Gate Control List (GCL) for opening or closing a switch (SW) on the routing path for each traffic flow based on the routing path,
a central user configurator (CUC) configured to:
receive a message transmission start instant of the talker (transmitter) from the CNC, and control a message transmission movement of the talker (transmitter).

### Claim 5 (depends on 4)

The control system according to claim 4, wherein the CNC converts the GCL into XML-based configuration data to transmit to the switch (SW), and transmits the message transmission start instant (FMTIisrci) to the CUC through a POST method.
