# US 2025/0209299 A1 · System and method for neural network based continuous process simulator

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0209299 A1
- Document ID: US20250209299A1
- Status: Published application
- Kind: A1
- Application number: 18/391,821
- Filed: 2023-12-21
- Published: 2025-06-26
- Earliest claimed: 2023-12-21
- Assignees: Genpact USA, Inc.
- Applicants: Genpact USA, Inc.
- Inventors: Vivek Saxena; Vikram Jha; Lavi Sharma; Harmeet Kaur
- Web page: https://patentgrep.com/patent/US20250209299A1

## CPC

- G06N 3/04: Architecture, e.g. interconnection topology
- G06N 3/08: Learning methods
- G06Q 10/1097: {using calendar-based scheduling for task assignment}
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR

## Abstract

A method for transforming a periodic event into a continuous one includes receiving data related to a periodic event for an organization where the data include activities corresponding to processes to be completed in the periodic event, generating a graph representing a calendar that includes one or more process, sub-process or task nodes, and inputting the graph and the data associated with the graph into a multi-layer neural network, to cause the multi-layer neural network to generate one or more simulated events. In a specific application, the simulated events include simulated close scenarios that drive a financial close towards a continuous close, where a simulated event includes various dimensions and attributes, where each driver/attribute choice or combination of choices has its own multitude of impacts, interdepend critical path and change management. The multi-layer neural network helps with modeling different simulations to arrive at an optimal basket of choices suited for a defined scenario.

## Claims

### Claim 1

A computer-implemented method, comprising:
receiving data related to a periodic event for an organization, the data including a number of activities corresponding to one or more processes to be completed in the periodic event, wherein each process includes one or more sub-process and each sub-process includes one or more tasks to be completed in the periodic event;
generating a graph representing a calendar for completing each task included in the periodic event, wherein the graph includes one or more process nodes representing the one or more processes, one or more sub-process nodes representing the one or more sub-processes included in each process, and one or more task nodes representing the one or more tasks included in each sub-process; and
inputting the graph and the data associated with the graph into a multi-layer neural network, to cause the multi-layer neural network to generate one or more simulated events, wherein the graph governs dataflow of the data through the multi-layer neural network, and wherein each of the one or more simulated events includes at least one task to be completed according to an alternative procedure that is different from an existing procedure for completing the at least one task, and wherein each of the one or more simulated events flattens the periodic event by reducing efforts to be placed during a predefined time range when completing each task included in the periodic event.

### Claim 2 (depends on 1)

The computer-implemented method of claim 1, wherein the multi-layer neural network is a graph neural network.

### Claim 3 (depends on 1)

The computer-implemented method of claim 1, wherein the graph is a tree type graph that includes a first type of linkage indicating a first relationship between each process and a sub-process included in each process, and a second type of linkage indicating a second relationship between each sub-process and a task included in each sub-process.

### Claim 4 (depends on 3)

The computer-implemented method of claim 3, wherein the tree type graph further includes one or more linkages each indicating a sequential relationship between a pair of tasks.

### Claim 5 (depends on 4)

The computer-implemented method of claim 4, wherein the sequential relationship between the pair of tasks indicates that one task is to be completed before the other task included in the pair of tasks.

### Claim 6 (depends on 1)

The computer-implemented method of claim 1, wherein the multi-layer neural network is trained by using historical data related to the periodic event from one or more organizations.

### Claim 7 (depends on 6)

The computer-implemented method of claim 6, wherein the one or more organizations are from different industrial fields.

### Claim 8 (depends on 6)

The computer-implemented method of claim 6, wherein the historical data include various possible procedures for completing a task included in the periodic event.

### Claim 9 (depends on 6)

The computer-implemented method of claim 6, wherein the multi-layer neural network is configured to identify the at least one task to be problematic when flatting the periodic event.

### Claim 10 (depends on 9)

The computer-implemented method of claim 9, wherein the multi-layer neural network is configured to automatically determine one or more alternative procedures for the at least one task identified to be problematic.

### Claim 11 (depends on 1)

The computer-implemented method of claim 1, wherein the alternative procedure causes the at least one task to be completed according to a different timeline.

### Claim 12 (depends on 11)

The computer-implemented method of claim 11, wherein the alternative procedure causes the at least one task to be completed outside the predefined time range.

### Claim 13 (depends on 1)

The computer-implemented method of claim 1, wherein the alternative procedure causes the at least one task to be completed through a process automation with increased efficiency.

### Claim 14 (depends on 1)

The computer-implemented method of claim 1, wherein the alternative procedure causes the at least one task to be completed through a re-sequence of tasks to be completed when completing the one or more processes.

### Claim 15 (depends on 1)

The computer-implemented method of claim 1, wherein the periodic event is one of a weekly event, biweekly event, monthly weekly, quarterly event, or annual event.

### Claim 16 (depends on 1)

The computer-implemented method of claim 1, wherein the one or more tasks include a subset of tasks that are dependent on each other.

### Claim 17 (depends on 1)

The computer-implemented method of claim 1, wherein the one or more tasks include a subset of tasks that are independent of each other

### Claim 18

A system, comprising:
a processor; and
a memory, coupled to the processor, configured to store executable instructions that, when executed by the processor, cause the processor to perform operations comprising:
receiving data related to a periodic event for an organization, the data including a number of activities corresponding to one or more processes to be completed in the periodic event, wherein each process includes one or more sub-process and each sub-process includes one or more tasks to be completed in the periodic event;
generating a graph representing a calendar for completing each task included in the periodic event, wherein the graph includes one or more process nodes representing the one or more processes, one or more sub-process nodes representing the one or more sub-processes included in each process, and one or more task nodes representing the one or more tasks included in each sub-process; and
inputting the graph and the data associated with the graph into a multi-layer neural network, to cause the multi-layer neural network to generate one or more simulated events, wherein the graph governs dataflow of the data through the multi-layer neural network, and wherein each of the one or more simulated events includes at least one task to be completed according to an alternative procedure that is different from an existing procedure for completing the at least one task, and wherein each of the one or more simulated events flattens the periodic event by reducing efforts to be placed during a predefined time range when completing each task included in the periodic event.

### Claim 19 (depends on 18)

The system of claim 18, wherein the multi-layer neural network is a graph neural network.

### Claim 20 (depends on 18)

The system of claim 18, wherein the graph is a tree type graph that includes a first type of linkage indicating a first relationship between each process and a sub-process included in each process, and a second type of linkage indicating a second relationship between each sub-process and a task included in each sub-process.