# US 2025/0208686 A1 · System and method of entering a low power mode for a battery electric machine

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0208686 A1
- Document ID: US20250208686A1
- Status: Published application
- Kind: A1
- Application number: 18/394,257
- Filed: 2023-12-22
- Published: 2025-06-26
- Earliest claimed: 2023-12-22
- Assignees: Caterpillar Inc.
- Applicants: Caterpillar Inc.
- Inventors: Russell A. Brockhurst; Ruchi P. Bhatia
- Web page: https://patentgrep.com/patent/US20250208686A1

## CPC

- G06F 1/3212: Monitoring battery levels, e.g. power saving mode being initiated when battery voltage goes below a certain level
- H02J 7/63: against overdischarge
- H02J 7/80: including monitoring or indicating arrangements
- H02J 7/855: {with circuits adapted for supplying loads from the battery}
- H02J 2105/30: the load networks being external to vehicles, i.e. exchanging power with vehicles
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY

## Abstract

A system and method for entering a low power mode of operation of a battery electric machine (BEM) are provided. The method includes determining a location of a battery electric machine (BEM) allocated to a production circuit; determining a location of a charging station compatible with the BEM; based at least in part on the location of the BEM, the location of the charging station, and the production circuit, determining a plurality of tasks of the BEM for executing the production circuit, predicting a corresponding duration of each task of the plurality of tasks, and predicting a corresponding energy use of each task of the plurality of tasks; initiating the BEM to perform a task of the plurality of tasks; and causing the BEM to enter a low power mode of operation based at least in part on the predicted corresponding duration and the predicted corresponding energy use of the task.

## Claims

### Claim 1

A method comprising:
determining a location of a battery electric machine (BEM) allocated to a production circuit;
determining a location of a charging station compatible with the BEM;
based at least in part on the location of the BEM, the location of the charging station, and the production circuit:
determining a plurality of tasks of the BEM for executing the production circuit,
predicting a corresponding duration of each task of the plurality of tasks, and
predicting a corresponding energy use of each task of the plurality of tasks;
initiating the BEM to perform a task of the plurality of tasks; and
causing the BEM to enter a low power mode of operation based at least in part on the predicted corresponding duration and the predicted corresponding energy use of the task.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
causing the BEM to enter the low power mode responsive to determining to suspend the task being performed.

### Claim 3 (depends on 1)

The method of claim 1, wherein causing the BEM to enter the low power mode includes determining to cause the BEM to enter the low power mode using at least one of:
a heuristic algorithm for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks,
a simulation of the plurality of tasks for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks,
a stochastic model for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks, or
a machine learning for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks.

### Claim 4 (depends on 1)

The method of claim 1, wherein predicting the corresponding energy use of each task of the plurality of tasks includes:
segmenting the corresponding duration into a plurality of time intervals, and
predicting a corresponding segment energy use of each time interval of the plurality of time intervals.

### Claim 5 (depends on 1)

The method of claim 1, wherein determining the plurality of tasks includes determining the plurality of tasks based on at least of:
one or more routine tasks of the BEM associated with the production circuit, or
one or more tasks historically performed by the BEM associated with the production circuit.

### Claim 6 (depends on 1)

The method of claim 1, further comprising:
determining a sequence of the plurality of tasks based at least in part on the location of the BEM, the location of the charging station, and the production circuit, the sequence including a corresponding predicted start time and a corresponding predicted end time of each task of the plurality of tasks;
scheduling the plurality of tasks based on the sequence for the BEM to perform; and
causing the BEM to enter the low power mode during an idle period of the plurality of tasks based at least in part on the scheduled plurality of tasks, the predicted corresponding duration the idle period and the predicted corresponding energy use of the idle period.

### Claim 7 (depends on 6)

The method of claim 6, wherein causing the BEM to enter the low power mode during the idle period includes causing the BEM to operate in the low power mode from a predicted start time of the idle period.

### Claim 8 (depends on 6)

The method of claim 6, wherein causing the BEM to enter the low power mode during the idle period includes at least one of:
delaying causing the BEM to enter the low power mode during the idle period based on safety associated with the BEM at the predicted start time of the idle period, or
delaying causing the BEM to enter the low power mode during the idle period based on the predicted corresponding duration of the idle period.

### Claim 9 (depends on 6)

The method of claim 6, wherein the idle period is a time period between two active tasks of the plurality of tasks.

### Claim 10 (depends on 9)

The method of claim 9, wherein causing the BEM to enter the low power mode during the idle period includes causing the BEM to operate in the low power mode from a predicted end time of a first active task of the two active tasks.

### Claim 11 (depends on 9)

The method of claim 9, wherein causing the BEM to enter the low power mode during the idle period includes causing the BEM to operate in the low power mode responsive to determining a first active task of the two active tasks being completed prior to a predicted end time of the first active task.

### Claim 12 (depends on 9)

The method of claim 9, wherein causing the BEM to enter the low power mode during the idle period includes:
determining to operate the BEM in the low power mode based on the duration of the idle period and types of the two active tasks.

### Claim 13 (depends on 9)

The method of claim 9, wherein causing the BEM to enter the low power mode during the idle period includes at least one of:
delaying causing the BEM to enter the low power mode during the idle period based on safety associated with the BEM at the predicted start time of the idle period, or
delaying causing the BEM to enter the low power mode during the idle period based on the duration of the idle period and types of the two active tasks.

### Claim 14 (depends on 9)

The method of claim 9, wherein causing the BEM to enter the low power mode during the idle period includes:
delaying causing the BEM to enter the low power mode during the idle period responsive to determining that a first active task of the two active tasks is in progress beyond a predicted end time of the first active task.

### Claim 15

A system comprising:
a processor; and
a memory communicatively coupled to the processor, the memory storing thereon processor-executable instructions that, when executed by the processor, cause the processor to:
determine a location of a battery electric machine (BEM) allocated to a production circuit;
determine a location of a charging station compatible with the BEM;
based at least in part on the location of the BEM, the location of the charging station, and the production circuit:
determine a plurality of tasks of the BEM for executing the production circuit,
predicting a corresponding duration of each task of the plurality of tasks, and
predicting a corresponding energy use of each task of the plurality of tasks;
initiate the BEM to perform a task of the plurality of tasks;
cause the BEM to enter a low power mode of operation based at least in part on the predicted corresponding duration and the predicted corresponding energy use of the task; and
cause the BEM to enter the low power mode responsive to determining to suspend the task being performed.

### Claim 16 (depends on 15)

The system of claim 15, wherein the processor-executable instructions further cause the processor to:
determine the plurality of tasks based on at least of:
one or more routine tasks of the BEM associated with the production circuit, or
one or more tasks historically performed by the BEM associated with the production circuit;
segment the corresponding duration into a plurality of time intervals; and
predict a corresponding segment energy use of each time interval of the plurality of time intervals.

### Claim 17 (depends on 15)

The system of claim 15, wherein the processor-executable instructions further cause the processor to:
determine a sequence of the plurality of tasks based at least in part on the location of the BEM, the location of the charging station, and the production circuit, the sequence including a corresponding predicted start time and a corresponding predicted end time of each task of the plurality of tasks;
schedule the plurality of tasks based on the sequence for the BEM to perform; and
cause the BEM to enter the low power mode during an idle period of the plurality of tasks based at least in part on the scheduled plurality of tasks, the predicted corresponding duration the idle period and the predicted corresponding energy use of the idle period.

### Claim 18

Non-transitory computer-readable medium storing thereon processor-executable instructions that, when executed by a processor of a system, cause the processor to perform operations, the operations comprising:
determining a location of a battery electric machine (BEM) allocated to a production circuit;
determining a location of a charging station compatible with the BEM;
based at least in part on the location of the BEM, the location of the charging station, and the production circuit:
determining a plurality of tasks of the BEM for executing the production circuit,
predicting a corresponding duration of each task of the plurality of tasks, and
predicting a corresponding energy use of each task of the plurality of tasks;
initiating the BEM to perform a task of the plurality of tasks;
causing the BEM to enter a low power mode based at least in part on the predicted corresponding duration and the predicted corresponding energy use of the task; and
causing the BEM to enter the low power mode responsive to determining to suspend the task being performed.

### Claim 19 (depends on 18)

The non-transitory computer-readable medium of claim 18, wherein the operations further comprise:
determining a sequence of the plurality of tasks based at least in part on the location of the BEM, the location of the charging station, and the production circuit, the sequence including a corresponding predicted start time and a corresponding predicted end time of each task of the plurality of tasks;
scheduling the plurality of tasks based on the sequence for the BEM to perform; and
causing the BEM to enter the low power mode during an idle period of the plurality of tasks based at least in part on the scheduled plurality of tasks, the predicted corresponding duration the idle period and the predicted corresponding energy use of the idle period.

### Claim 20 (depends on 19)

The non-transitory computer-readable medium of claim 19, wherein causing the BEM to enter the low power mode includes determining to cause the BEM to enter the low power mode using at least one of:
a heuristic algorithm for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks,
a simulation of the plurality of tasks for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks,
a stochastic model for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks, or
a machine learning for estimating the corresponding duration and the corresponding energy use of each task of the plurality of tasks.