# US 2025/0207602 A1 · Flow-generation system and method for its operation

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0207602 A1
- Document ID: US20250207602A1
- Status: Published application
- Kind: A1
- Application number: 18/989,642
- Filed: 2024-12-20
- Published: 2025-06-26
- Earliest claimed: 2023-12-22
- Assignees: ebm-papst Mulfingen GmbH & Co. KG
- Applicants: ebm-papst Mulfingen GmbH & Co. KG
- Inventors: Sebastian Schroth; Sébastien Heini
- Web page: https://patentgrep.com/patent/US20250207602A1

## CPC

- F04D 27/007: {Conjoint control of two or more different functions}
- G06F 9/5066: {Algorithms for mapping a plurality of inter-dependent sub-tasks onto a plurality of physical CPUs (mappping at compile time, see G06F8/451)}
- F04D 25/08: the working fluid being air, e.g. for ventilation
- G05B 19/0421: {Multiprocessor system}
- G06F 2209/5017: Task decomposition
- F04D: NON-POSITIVE-DISPLACEMENT PUMPS (engine fuel-injection pumps F02M; ion pumps H01J41/12; electrodynamic pumps H02K44/02)
- G06F: ELECTRIC DIGITAL DATA PROCESSING (computer systems based on specific computational models G06N)
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)

## Abstract

The present disclosure relates to a flow-generation system and to a method for its operation. The flow-generation system has a plurality of flow-generation units, which are each configured to generate an individual fluid flow, in particular an air flow. For this purpose, the flow-generation unit can comprise an electromotively operated fan, for example. A local controller has a processor, a working memory, and a process scheduler, and is connected to a communication network for communication via a communication interface. A control task can be processed in parallel by a network group by means of a plurality of local controllers of the flow-generation units belonging to the network group when one single local controller does not have enough computing power and/or memory capacity for processing the control task. In this case, complex control tasks can also be processed without an internet-based service (cloud service) connected to the flow-generation system or a server or increased computing and memory capacity of the local controllers necessarily being required for this purpose.

## Claims

### Claim 1

A flow-generation system comprising a plurality of flow-generation units, which are connected for communication by means of a communication network,
wherein each flow-generation unit of the plurality of flow-generation units comprises a local controller having a processor and having a process scheduler and a communication interface connected to the local controller for communication and for connection to the communication network,
wherein each flow-generation unit of the plurality of flow-generation units is configured to form a network group together with one or more or all of the other flow-generation units of the plurality of flow-generation units, the network group is configured to process a control task in a distributed manner by the processor of each flow-generation unit of the plurality of flow-generation units of the network group, wherein the process scheduler of one of the plurality of flow-generation units operates as a superordinate scheduler and is configured to define sub-tasks of the control task, to assign the sub-tasks to the processor of each flow-generation unit of the plurality of flow-generation units of the network group, and to combine results of the sub-tasks for processing the control task,
wherein the flow-generation system also comprises at least one sensor which provides sensor data for one or more flow-generation units of the plurality of flow-generation units, and
wherein the superordinate scheduler is configured to divide the sensor data from the at least one sensor or from at least one of available sensors into data blocks and to allocate each data block of the data blocks to a sub-task.

### Claim 2 (depends on 1)

The flow-generation system according to claim 1, wherein each flow-generation unit of the plurality of flow-generation units is configured to control or regulate the generation of an individual fluid flow by means of the local controller independently of other flow-generation units of the plurality of flow-generation units.

### Claim 3 (depends on 1)

The flow-generation system according to claim 1, wherein a cloud service for processing the control task is not available to the communication network.

### Claim 4 (depends on 1)

The flow-generation system according to claim 1, wherein the at least one sensor or at least one of available sensors is an individual sensor of one of the plurality of flow-generation units.

### Claim 5 (depends on 4)

The flow-generation system according to claim 4, wherein the at least one sensor or at least one of available sensors is a system sensor, which is connected to the communication network for communication independently of the plurality of flow-generation units.

### Claim 6 (depends on 1)

The flow-generation system according to claim 1, wherein each sub-task involves compressing and/or evaluating the allocated data block.

### Claim 7 (depends on 1)

The flow-generation system according to claim 1, wherein the control task involves evaluating the sensor data in a frequency range.

### Claim 8 (depends on 1)

The flow-generation system according to claim 1, wherein at least one sensor is a plurality of sensors and the control task involves assessing sensor data from the plurality of sensors in order to obtain information that goes beyond information content of the sensor data from a single sensor of the plurality of sensors.

### Claim 9 (depends on 1)

The flow-generation system according to claim 1, wherein each local controller of the plurality of flow-generation units is configured to request the formation of a network group.

### Claim 10 (depends on 1)

The flow-generation system according to claim 1, wherein the control task specifies a target parameter, and wherein each of the plurality of flow-generation units of the network group are configured to coordinate their respective local controller in order to jointly generate an overall fluid flow with the aim of fulfilling the target parameter.

### Claim 11 (depends on 1)

The flow-generation system according to claim 1, wherein each flow-generation unit of the plurality of flow-generation units of the network group is allocated to a joint flow space.

### Claim 12 (depends on 1)

The flow-generation system according to claim 1, wherein the local controller of each of the plurality of flow-generation units is a motor controller of an electric motor of a respective one of the plurality of flow-generation units.

### Claim 13 (depends on 1)

The flow-generation system according to claim 1, also comprising an operating interface and/or a gateway, which is connected to the communication network for communication and is configured to specify and/or select and/or change the control task.

### Claim 14

A method for operating a flow-generation system comprising a plurality of flow-generation units, which are connected for communication by means of a communication network, and also comprising at least one sensor which provides sensor data for one or more flow-generation units of the plurality of flow-generation units, wherein each flow-generation unit of the plurality of flow-generation units comprises a local controller having a processor and having a process scheduler and a communication interface connected to the local controller for communication for connection to the communication network, wherein the method comprises:
specifying a control task,
temporarily forming a network group from a plurality of or all of the plurality of flow-generation units for distributed processing of the control task by means of the processor of the plurality of or all of the plurality of flow-generation units of the network group,
determining a superordinate scheduler of the process scheduler of each of the plurality of flow-generation units of the network group,
defining sub-tasks for processing the control task by means of the superordinate scheduler,
dividing the sensor data from the at least one sensor or from at least one of available sensors into data blocks and allocating each data block of the data blocks to a sub-task by means of the superordinate scheduler,
allocating each sub-task of the sub-tasks to one processor of the plurality of flow-generation units of the network group,
processing each sub-task of the sub-tasks and providing a result of each sub-task of the sub-tasks for the superordinate scheduler by means of the one processor of the plurality of flow-generation units,
combining the result of each sub-task of the sub-tasks by means of the superordinate scheduler.

### Claim 15 (depends on 2)

The flow-generation system according to claim 2, wherein a cloud service for processing the control task is not available to the communication network.

### Claim 16 (depends on 15)

The flow-generation system according to claim 15, also comprising at least one sensor which provides sensor data for one or more flow-generation units of the plurality of flow-generation units.

### Claim 17 (depends on 16)

The flow-generation system according to claim 16, wherein the at least one sensor or at least one of available sensors is an individual sensor of one of the plurality of flow-generation units.

### Claim 18 (depends on 16)

The flow-generation system according to claim 16, wherein the at least one sensor or at least one of available sensors is a system sensor, which is connected to the communication network for communication independently of the plurality of flow-generation units.
