# US 2025/0207352 A1 · Shovel

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0207352 A1
- Document ID: US20250207352A1
- Status: Published application
- Kind: A1
- Application number: 18/973,691
- Filed: 2024-12-09
- Published: 2025-06-26
- Earliest claimed: 2023-12-25
- Assignees: Sumitomo Heavy Industries, Ltd.
- Applicants: Sumitomo Heavy Industries, Ltd.
- Inventors: Yusuke SANO; Chunnan WU; Hisashi OSUMI
- Web page: https://patentgrep.com/patent/US20250207352A1

## CPC

- E02F 3/437: {providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant}
- E02F 3/32: working downwardly and towards the machine, e.g. with backhoes
- E02F 3/435: {for dipper-arms, backhoes or the like}
- E02F 9/2228: {including an electronic controller}
- E02F 9/26: Indicating devices {(E02F5/145 takes precedence)}
- E02F 9/264: {Sensors and their calibration for indicating the position of the work tool}
- E02F 9/2285: {Pilot-operated systems}
- E02F 9/2292: {Systems with two or more pumps}
- E02F 9/2296: {Systems with a variable displacement pump}
- E02F: DREDGING; SOIL-SHIFTING (winning peat E21C49/00)

## Abstract

A shovel to move an object to predetermined place by repeating a series of operations including an excavation operation and a dumping operation, the shovel including: a lower traveling body; an upper swivel body pivotably mounted on the lower traveling body; an attachment attached to the upper swivel body; a sensor attached to the upper swivel body; and a control device configured to calculate, based on output of the sensor, an excavation reactive force generated by the excavation operation and an excavation weight, which is a weight of object taken into a bucket and moved to the predetermined place. The control device is configured to set a target value related to the excavation reactive force of a second excavation operation subsequently performed one or more times, based on a relationship between the excavation reactive force calculated during a first excavation operation performed one or more times and the excavation weight.

## Claims

### Claim 1

A shovel for moving an object to a predetermined place by repeating a series of operations including an excavation operation and a dumping operation, the shovel comprising:
a lower traveling body;
an upper swivel body pivotably mounted on the lower traveling body;
an attachment attached to the upper swivel body;
a sensor attached to the upper swivel body; and
a control device configured to calculate, based on an output of the sensor, an excavation reactive force generated by the excavation operation and an excavation weight, which is a weight of an object taken into a bucket and moved to the predetermined place, wherein
the control device is further configured to set a target value related to the excavation reactive force of a second excavation operation subsequently performed one or more times, based on a relationship between the excavation reactive force calculated during a first excavation operation performed one or more times and the excavation weight.

### Claim 2 (depends on 1)

The shovel according to claim 1, wherein
the shovel is configured to operate such that the weight of the object moved to the predetermined place becomes a target weight by repeating the series of operations including the excavation operation and a dumping operation, and
the control device is further configured to set the target value related to the excavation reactive force during the second excavation operation based on a relationship between the excavation reactive force and the excavation weight calculated during the first excavation operation, a cumulative weight which is the weight of the object already moved to the predetermined place, and the target weight.

### Claim 3 (depends on 2)

The shovel according to claim 2, wherein
the control device is further configured to
calculate a number of excavation operation times necessary for the weight of the object moved to the predetermined place to reach the target weight based on the relationship between the excavation reactive force and the excavation weight calculated during the first excavation operation, the cumulative weight, and the target weight, and
set the target value related to the excavation reactive force during the second excavation operation based on the number of excavation operation times.

### Claim 4

A shovel that operates such that a weight of an object moved to a predetermined place becomes a target weight by repeating a series of operations including an excavation operation and a dumping operation, the shovel comprising:
a lower traveling body;
an upper swivel body pivotably mounted on the lower traveling body;
an attachment attached to the upper swivel body;
a sensor attached to the upper swivel body; and
a control device configured to calculate, based on an output of the sensor, an excavation reactive force generated by the excavation operation and an excavation weight, which is a weight of an object taken into a bucket and moved to the predetermined place, wherein
the control device is further configured to set a target value related to an excavation reactive force during a second excavation operation subsequently performed one or more times based on a relationship between the excavation reactive force and the excavation weight calculated during a first excavation operation performed one or more times and the target weight.

### Claim 5 (depends on 4)

The shovel according to claim 4, wherein
the control device is further configured to set the target value related to the excavation reactive force during the second excavation operation based on the relationship between the excavation reactive force and the excavation weight calculated during the excavation operation performed one or more times before the first excavation operation and the target weight, in a case the excavation reactive force or the excavation weight calculated during the first excavation operation is an abnormal value.

### Claim 6 (depends on 1)

The shovel according to claim 1, wherein
in each of the second excavation operations, each being the second excavation operation, performed after the target value is set, the control device is further configured to notify an operator that a current excavation reactive force has reached the target value.

### Claim 7 (depends on 1)

The shovel according to claim 1, wherein
in each of the second excavation operations performed after the target value is set, the control device is further configured to automatically operate a predetermined actuator upon a current excavation reactive force reaching the target value.