# US 2025/0198258 A1 · Mobile offshore carbon capture and sequestration systems and methods using jack-up structure

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0198258 A1
- Document ID: US20250198258A1
- Status: Published application
- Kind: A1
- Application number: 18/780,654
- Filed: 2024-07-23
- Published: 2025-06-19
- Earliest claimed: 2023-12-15
- Assignees: Vtec Consulting LLC
- Applicants: Vtec Consulting LLC
- Inventors: JOHN M. VITUCCI
- Web page: https://patentgrep.com/patent/US20250198258A1

## CPC

- E21B 41/0064: {Carbon dioxide sequestration (storing fluids in porous layers B65G5/005)}
- E02B 17/0836: {with climbing jacks (climbing cranes B66C23/32; hydraulic lifting jacks B66F3/24 and subgroups)}
- E21B 7/12: Underwater drilling (using heave compensators E21B19/09)
- E21B 15/02: specially adapted for underwater drilling (E21B15/04 takes precedence)
- E21B 41/0007: {for underwater installations (E21B41/005, E21B41/04, E21B41/06, E21B41/08, E21B41/10 take precedence)}
- E21B 43/01: specially adapted for obtaining from underwater installations
- B01D 2257/504: Carbon dioxide
- Y02C 20/40: of CO2
- Y02P 90/70: Combining sequestration of CO2 and exploitation of hydrocarbons by injecting CO2 or carbonated water in oil wells
- E21B: EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E02B: HYDRAULIC ENGINEERING (ship-lifting E02C; dredging E02F)
- B01D: SEPARATION (separating solids from solids by wet methods B03B, B03D; by pneumatic jigs or tables B03B; by other dry methods B07; magnetic or electrostatic separation of solid materials from solid materials or fluids, separation by high-voltage electric fields B03C; centrifuges, vortex apparatus B04; presses per se for squeezing-out liquid from liquid-containing material B30B9/02; treatment of water C02F, e.g. softening by ion-exchange C02F1/42; {arrangements of air intake cleaners in gas turbine plants F02C7/05} ; arrangements or mounting of filters in air-conditioning, air-humidification or ventilation F24F13/28)
- Y02C: CAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS

## Abstract

Systems and methods for mobile offshore carbon capture and sequestration operations. One system includes a first installation featuring a direct air carbon dioxide capture (DAC) system, carbon dioxide dehydration, carbon dioxide compression and a second installation featuring carbon dioxide injection facilities to inject carbon dioxide into an underground reservoir or other suitable subsurface formation.

## Claims

### Claim 1

A system comprising:
a) a first offshore installation comprising
i) a jack-up structure comprising a floatable hull and three or more legs configured to be raised and lowered vertically and engaged with or landed on a seafloor, and
ii) the jack-up structure having a CO2 removal system comprising one or more CO2 removal units (including air moving fans and CO2 adsorption and/or absorption units) on or in the floatable hull, one or more CO2 dehydration units, and one or more CO2 compressors, the one or more CO2 removal units configured to remove CO2 from atmospheric air through Direct Air Capture (DAC) and form captured CO2;
b) one or more transfer conduits fluidly connecting the one or more CO2 compressors with a second offshore installation;
c) the one or more CO2 compressors configured to transfer the captured CO2 through the one or more transfer conduits to the second offshore installation;
d) the second offshore installation comprising one or more CO2 injection wells configured to route the captured CO2 into a subsurface storage formation selected from a depleted oil/gas reservoir, a saline aquifer, or other rock strata.

### Claim 2 (depends on 1)

The system of claim 1 wherein the CO2 removal unit is integrated into the jack-up structure.

### Claim 3 (depends on 1)

The system of claim 1 wherein the jack-up structure comprises a propulsion system integrated into the hull.

### Claim 4 (depends on 1)

The system of claim 1 wherein the jack-up structure hull and legs integrate one or more renewable energy systems and equipment to produce electricity and power.

### Claim 5 (depends on 4)

The system of claim 4 wherein the one or more renewable energy systems comprises one or more hydro-turbines configured to be lowered into the water when in operation or raised above the water line during relocation.

### Claim 6 (depends on 4)

The system of claim 4 wherein the one or more renewable energy systems comprises one or more vertical wind turbines integrated into one or more of the legs, and wave energy systems attached to the legs or hull.

### Claim 7 (depends on 1)

The system of claim 1 wherein the one or more CO2 removal systems comprises:
a) an air intake and transport system configured to move the atmospheric air into the one or more CO2 removal units comprising one or more fans or other equipment used to intake, transport and/or compress air,
b) a dehydration system to remove water from the captured CO2 and form dehydrated CO2,
c) the one or more compressors are configured to compress the dehydrated CO2, and
d) a manifold connecting the one or more compressors to the one or more transfer conduits.

### Claim 8 (depends on 1)

The system of claim 1 comprising one or more post-combustion CO2 capture systems to remove CO2 from 1) equipment located on the first offshore installation that requires combustion for power generation selected from gas turbines generators (GTGs), diesel engine generators and other similar equipment typically found on offshore installations and 2) fired heaters for heating medium provision.

### Claim 9 (depends on 4)

The system of claim 4 comprising one or more power generation equipment selected from gas turbines generators (GTGs) and diesel engine driven generators to supplement renewable power generation.

### Claim 10 (depends on 1)

The system of claim 1 comprising one or more fuel reception systems configured to accept fuel gas from the second offshore installation, or from any other source, to use as fuel for generating power.

### Claim 11 (depends on 1)

The system of claim 1 wherein the first offshore installation comprises electrical equipment to receive electrical power from an independent renewable energy power source selected from one or more seafloor mounted hydro-turbines, one or more wind turbines (floating and/or attached to the seafloor or the power grid that connects various turbines in a offshore wind development), wave or current energy systems, or similar offshore power producing equipment or systems.

### Claim 12 (depends on 1)

The system of claim 1 wherein the first offshore installation comprises electrical equipment to receive electrical power from the second installation or other electrical power source.

### Claim 13 (depends on 1)

The system of claim 1 be wherein the one or more CO2 removal units are modular and configured to be removed, replaced, or upgraded and disconnected from and connected to decking mounting structures or facility foundations of the jack-up structure and other equipment onboard the jack-up structure hull, piping, electrical systems and control systems onboard the jack-up structure hull.

### Claim 14 (depends on 1)

The system of claim 1 wherein the first offshore installation is a modular and scalable design allowing the one or more CO2 removal units capacity to be scaled up and down per the application required.

### Claim 15 (depends on 1)

The system of claim 1 wherein the first offshore installation is connected to the second offshore installation by a structural bridge to support the one or more CO2 transfer conduits and, optionally, fuel gas provision conduits, and electrical power lines.

### Claim 16 (depends on 1)

The system of claim 1 wherein the second installation is a platform comprising one or more natural gas production wells and one or more CO2 injection wells, and wherein the one or more transfer conduits comprise flexible hoses and/or flexible pipes configured to be wound and unwound from corresponding hose reels on the first installation, one of the flexible hoses and/or flexible pipes being a CO2 transfer conduit, and a second flexible hose and/or or flexible pipe being a fuel gas transfer conduit, and the system is devoid of a bridge supporting the one or more transfer conduits.

### Claim 17 (depends on 1)

The system of claim 1 wherein the second installation is a platform comprising one or more natural gas production wells and one or more CO2 injection wells, and wherein the one or more transfer conduits comprise flexible hoses and/or flexible pipes supported by a bridge between the first and second installations, the flexible hoses and/or flexible pipes configured to be wound and unwound from corresponding hose reels on the first installation, one of the flexible hoses and/or flexible pipes being a CO2 transfer conduit, and a second flexible hose and/or flexible pipe being a fuel gas transfer conduit.

### Claim 18 (depends on 17)

The system of claim 17 wherein the bridge extends between a top deck of the jack-up structure and a platform deck that is level with the top deck of the jack-up structure.

### Claim 19

A method comprising:
a) providing a first offshore installation comprising a floatable hull and three or more legs configured to be raised and lowered vertically and engaged with or landed on a seafloor, the floatable hull comprising one or more CO2 removal units thereon or therein;
b) removing CO2 from atmospheric air through Direct Air Capture (DAC), forming captured CO2;
c) pressurizing the captured CO2 to a pressure P1 sufficient to transfer the captured CO2 through one or more transfer conduits to a second offshore installation;
d) transferring the captured CO2 through the one or more transfer conduits to the second offshore installation, where the captured CO2 has a pressure P2, where P2<P1;
e) where pressure P2 is sufficient to inject the captured CO2 through one or more CO2 risers into a subsurface storage formation selected from a depleted oil/gas reservoir, a saline aquifer, or other rock strata.

### Claim 20

A method comprising:
a) providing a first offshore installation comprising a floatable hull and three or more legs configured to be raised and lowered vertically and engaged with or landed on a seafloor, the floatable hull comprising one or more CO2 removal units thereon or therein;
b) removing CO2 from atmospheric air through Direct Air Capture (DAC), forming captured CO2;
c) pressurizing the captured CO2 to a pressure P1 sufficient to transfer the captured CO2 through one or more transfer conduits to a second offshore installation;
d) transferring the captured CO2 through the one or more transfer conduits to the second offshore installation, where the captured CO2 has a pressure P2;
e) pressurizing the captured CO2 from pressure P2 to pressure P3, using secondary compression on the second installation, where pressure P3 is sufficient to inject the captured CO2 through the one or more CO2 risers into the subsurface storage formation selected from a depleted oil/gas reservoir, a saline aquifer, or other rock strata.
