Deep electromagnetic rebar probe system, and method of using same
AssigneeAtomic Energy of Canada Limited/éNergie Atomique Du Canada LimitéE
InventorsMark Stephen LULOFF, Molly ZAUGG, Stephen HOGG, Jai LEI
Life of this patent
Estimating the term…
Loading patent…
AssigneeAtomic Energy of Canada Limited/éNergie Atomique Du Canada LimitéE
InventorsMark Stephen LULOFF, Molly ZAUGG, Stephen HOGG, Jai LEI
Estimating the term…
A method for monitoring a first attribute of a target object within a non-magnetic structure using a first probe coupled to the non-magnetic structure and located proximate the target object at a first detection region, the method includes a) introducing, at the first detection region, a pulsed electromagnetic interrogation signal along the electromagnetic circuit and through the target object using a first transmitter; b) receiving, at the first detection region, a response electromagnetic signal that is induced in the target object and generating a corresponding response electrical signal comprising time information and voltage information using a first receiver; c) determining the first attribute of the target object at the first detection region; d) generating a corresponding first output signal; and e) comparing one of the first output signal and the first attribute, to a stored value for the first detection region to determine if a condition is met.
A system for non-destructively monitoring at least a first attribute of an elongate, target object extending along an object axis and being disposed within a non-magnetic structure, the system comprising:
A method for non-destructively monitoring a first attribute of a target object that is within a non-magnetic structure and extends along an object axis using a first probe coupled to the non-magnetic structure and located proximate the target object at a first detection region, the first probe comprising
The method of claim 47 or 50, wherein determining the cover depth further comprises determining a rate of change/slope of a voltage of the response electrical signal with respect to time and comparing the rate of change to the predetermined data set.
Dependencies are inferred from the claim text.