# US 2025/0189143 A1 · Hot water supply system capable of hot water preheating and malfunction determination method using same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0189143 A1
- Document ID: US20250189143A1
- Status: Published application
- Kind: A1
- Application number: 18/841,098
- Filed: 2022-12-30
- Published: 2025-06-12
- Earliest claimed: 2022-02-24
- Assignees: Kyungdong Navien Co., Ltd.
- Applicants: Kyungdong Navien Co., Ltd.
- Inventors: Nam Soo DO; Si Hwan KIM; Chang Heoi HEO; Yong Min SONG
- Web page: https://patentgrep.com/patent/US20250189143A1

## CPC

- F24D 17/00: Domestic hot-water supply systems
- F24D 17/0078: {Recirculation systems}
- F24D 19/10: Arrangement or mounting of control or safety devices (only the heater being controlled F24H9/20)
- F24D 19/1051: {for domestic hot water}
- F24H 9/20: Arrangement or mounting of control or safety devices
- F24H 15/104: Inspection; Diagnosis; Trial operation
- F24H 15/215: before heating
- F24H 15/219: after heating
- F24H 15/238: Flow rate
- F24H 15/325: of by-pass valves
- F24H 15/335: Control of pumps, e.g. on-off control (control of compressors of heat pumps F24H15/38)
- F24H 15/395: Information to users, e.g. alarms
- F24H 15/421: using pre-stored data
- G06N 20/00: Machine learning
- F24D: DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR (using steam or condensate extracted or exhausted from steam engine plants for heating purposes F01K17/02)
- F24H: FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL (steam generation F22)
- G06N: COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS

## Abstract

A hot water supply system according to the present invention comprises a boiler which heats water supplied from a direct water pipe to provide same to a hot water pipe and a hot water circulation valve which connects or separates the hot water pipe to or from the direct water pipe on the basis of a valve operation temperature, wherein a preheating time may be learned on the basis of a flow rate of water circulated through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler when a preheating operation is performed, and a malfunction of the hot water circulation valve can be determined through flow rate detection without a separate device.

## Claims

### Claim 1

A hot water supply system comprising:
a boiler configured to heat water supplied from a direct water pipe and provide the heated water to a hot water pipe; and
a hot water circulation valve configured to connect or separate the hot water pipe and the direct water pipe based on a valve operation temperature,
wherein the hot water supply system performs at least one of an operation of learning preheating time based on a flow rate of water circulating through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler during a preheating operation, an operation of changing preheating pause time based on a difference between a temperature of the water circulating through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler at the end of the preheating operation and a temperature of the circulating water at the start of the preheating operation, or a combination of the operations.

### Claim 2 (depends on 1)

The hot water supply system of claim 1, further comprising:
a hot water supply management device configured to perform at least one of an operation of learning the preheating time based on the flow rate of the water circulating through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler during the preheating operation and determining a malfunction of the hot water circulation valve based on the learned preheating time, an operation of calculating a difference between a temperature of water in the direct water pipe at the end of the preheating operation and a temperature of the water in the direct water pipe at the start of the preheating operation, changing the preheating pause time by comparing the calculated temperature difference with a preset range, and determining a failure in the hot water circulation valve based on a flow rate in the direct water pipe during the preheating operation to which the changed preheating pause time is applied, or a combination of the operations.

### Claim 3 (depends on 2)

The hot water supply system of claim 2, wherein the hot water supply management device includes:
a flow sensor configured to sense the flow rate of the water circulating through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler during the preheating operation; and
a malfunction determination device configured to detect and determine a malfunction of the hot water circulation valve based on preheating operation time information and flow rate information of the flow sensor.

### Claim 4 (depends on 3)

The hot water supply system of claim 3, wherein the hot water supply management device further includes:
a preheating time learning device configured to learn the preheating time based on the valve operation temperature, preheating stop temperature, and the flow rate information; and
a controller configured to generate the preheating operation time information based on the learned preheating time and provide an error notification depending on the detection of the malfunction by the malfunction determination device.

### Claim 5 (depends on 4)

The hot water supply system of claim 4, wherein the preheating time learning device learns the preheating time based on the flow rate information of the flow sensor when the preheating stop temperature is higher than the valve operation temperature.

### Claim 6 (depends on 5)

The hot water supply system of claim 5, wherein the preheating time learning device starts a count of the preheating time when the flow rate is detected based on the flow rate information during the preheating operation, stops the count when the flow rate is not detected, and stores count values when the count is stopped.

### Claim 7 (depends on 6)

The hot water supply system of claim 6, wherein the preheating time learning device calculates a moving average of the stored count values and learns the calculated value as the preheating time.

### Claim 8 (depends on 6)

The hot water supply system of claim 6, wherein the preheating time learning device initializes the started count when a current flow rate based on the flow rate information exceeds a preset flow rate after the count of the preheating time starts during the preheating operation.

### Claim 9 (depends on 4)

The hot water supply system of claim 4, wherein the malfunction determination device determines that the preheating operation ends, based on the preheating operation time information and determines a malfunction of the hot water circulation valve when a current flow rate is detected based on the flow rate information even after the preheating operation ends and a preset period of time elapses.

### Claim 10 (depends on 3)

The hot water supply system of claim 3, wherein the hot water supply management device further includes:
a temperature sensor configured to sense the temperature of the water circulating through the hot water pipe, the hot water circulation valve, the direct water pipe, and the boiler;
a preheating pause time learning device configured to learn the preheating pause time based on temperature information of the temperature sensor; and
a controller configured to generate the preheating operation time information based on the learned preheating pause time and provide an error notification depending on the detection of the malfunction by the malfunction determination device.

### Claim 11 (depends on 10)

The hot water supply system of claim 10, wherein the preheating pause time learning device calculates the difference between the temperature of the water in the direct water pipe at the end of the preheating operation and the temperature of the water in the direct water pipe at the start of the preheating operation and decreases the preheating pause time by a preset time when the calculated temperature difference exceeds an upper limit of the preset range.

### Claim 12 (depends on 10)

The hot water supply system of claim 10, wherein the preheating pause time learning device calculates the difference between the temperature of the water in the direct water pipe at the end of the preheating operation and the temperature of the water in the direct water pipe at the start of the preheating operation and increases the preheating pause time by a preset time when the calculated temperature difference is less than a lower limit of the preset range.

### Claim 13 (depends on 10)

The hot water supply system of claim 10, wherein the preheating pause time learning device calculates the difference between the temperature of the water in the direct water pipe at the end of the preheating operation and the temperature of the water in the direct water pipe at the start of the preheating operation and maintains the preheating pause time when the calculated temperature difference is within the preset range.

### Claim 14 (depends on 12)

The hot water supply system of claim 12, wherein the malfunction determination device determines that the preheating operation starts, based on the preheating operation time information and determines a malfunction of the hot water circulation valve when a current flow rate is detected based on the flow rate information even after the preheating operation ends and a preset period of time elapses.

### Claim 15

A method for operating a hot water supply system, the method comprising:
identifying a request for preheating:
operating a circulation pump;
detecting a flow rate of a hot water circulation path;
starting a count and storing the detected flow rate when the circulation pump is operated and the flow rate of the hot water circulation path is detected;
stopping the started count and storing count values when the flow rate of the hot water circulation path is not detected; and
calculating a moving average of the stored count values and learning the calculated moving average as preheating time,
wherein the hot water circulation path is a path along which heated water from a boiler is circulated back to the boiler through a hot water pipe, a hot water circulation valve, and a direct water pipe.

### Claim 16 (depends on 15)

The method of claim 15, further comprising:
determining that a user uses hot water and initializing the started count when a currently-detected flow rate exceeds a preset flow rate.

### Claim 17 (depends on 15)

The method of claim 15, further comprising:
notifying a user of a failure in the hot water circulation valve when the flow rate of the hot water circulation path is detected even after the learned preheating time and a preset period of time elapse.

### Claim 18

A method for operating a hot water supply system, the method comprising:
identifying a request for preheating:
operating a circulation pump;
detecting and storing a temperature of water in a hot water circulation path;
calculating a difference between a temperature of water in the hot water circulation path at the end of a preheating operation and a temperature of water in the hot water circulation path at the start of the preheating operation; and
changing preheating pause time by comparing the calculated water temperature difference with a preset range,
wherein the hot water circulation path is a path along which heated water from a boiler is circulated back to the boiler through a hot water pipe, a hot water circulation valve, and a direct water pipe.

### Claim 19 (depends on 18)

The method of claim 18, wherein the changing of the preheating pause time includes:
decreasing the preheating pause time by a preset time when the calculated water temperature difference exceeds an upper limit of the preset range;
increasing the preheating pause time by the preset time when the calculated water temperature difference is less than a lower limit of the preset range; and
maintaining the preheating pause time when the calculated water temperature difference is within the preset range.

### Claim 20 (depends on 18)

The method of claim 18, further comprising:
determining a failure in the hot water circulation valve when a flow rate of the hot water circulation path is not detected even after a preset period of time elapses after start timing of preheating operation time to which the changed preheating pause time is applied.
