# US 2025/0187961 A1 · Rainwater garden with reduced nitrous oxide emission

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0187961 A1
- Document ID: US20250187961A1
- Status: Published application
- Kind: A1
- Application number: 18/637,395
- Filed: 2024-04-16
- Published: 2025-06-12
- Earliest claimed: 2023-12-08
- Assignees: Chongqing University
- Applicants: Chongqing University
- Inventors: Hongxiang CHAI; Huan XIAO; Haiyuan MA; Cheng CHENG; Wenlin ZHAO; Zhiyu SHAO; Lei CHEN
- Web page: https://patentgrep.com/patent/US20250187961A1

## CPC

- C02F 3/327: {characterised by animals and plants}
- C02F 3/306: {Denitrification of water in soil}
- C02F 2001/007: {Processes including a sedimentation step}
- C02F 2003/003: {using activated carbon or the like}
- C02F 2103/001: {Runoff or storm water}
- C02F 2203/006: details of construction, e.g. specially adapted seals, modules, connections
- C02F: TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE (separation in general B01D; special arrangements on waterborne vessels of installations for treating water, waste water or sewage, e.g. for producing fresh water, B63J; adding materials to water to prevent corrosion C23F; treating radioactively-contaminated liquids G21F9/04; regeneration of reactants for recirculation into processes, see the relevant places for the processes)

## Abstract

A rainwater garden including: a bioretention area; a rainwater collection area; and a first perforated drainage pipe. The bioretention area includes, from bottom up, a gravel layer, a transition layer, a chalcopyrite substrate layer, a biochar substrate layer, a planting layer, a cover layer, and a water storage layer. The first perforated drainage pipe is disposed in the gravel layer. The first perforated drainage pipe includes an outlet end extending to connect to the rainwater collection area; and the outlet end is flush with a top surface of the chalcopyrite substrate layer.

## Claims

### Claim 1

A rainwater garden, comprising:
a bioretention area;
a rainwater collection area; and
a first perforated drainage pipe;
wherein:
the bioretention area comprises, from bottom up, a gravel layer, a transition layer, a chalcopyrite substrate layer, a biochar substrate layer, a planting layer, a cover layer, and a water storage layer; and
the first perforated drainage pipe is disposed in the gravel layer; the first perforated drainage pipe comprises an outlet end extending to connect to the rainwater collection area; and the outlet end is flush with a top surface of the chalcopyrite substrate layer.

### Claim 2 (depends on 1)

The rainwater garden of claim 1, further comprising a sedimentation area and an initial runoff disposal area; wherein the sedimentation area and the initial runoff disposal area are disposed outside the cover layer of the bioretention area; the sedimentation area is disposed outside the initial runoff disposal area; pebbles are disposed on bottom parts of the sedimentation area and the initial runoff disposal area; the initial runoff disposal area is sloped; an overflow pipe is vertically disposed in the initial runoff disposal area and a second perforated drainage pipe is disposed flat on a bottom end of the initial runoff disposal area; the overflow pipe is connected to the second perforated drainage pipe; and an outlet of the second perforated drainage pipe is connected to a municipal rainwater pipe network.

### Claim 3 (depends on 2)

The rainwater garden of claim 2, wherein a submersible pump is disposed in the rainwater collection area; a return pipe is connected to a water outlet of the submersible pump; an inspection well is disposed on a top end of the rainwater collection area; and a drainage pipe is disposed on a side wall of the rainwater collection area.

### Claim 4 (depends on 3)

The rainwater garden of claim 3, wherein the chalcopyrite substrate layer has a thickness of 300-500 mm, filled with a first filler comprising chalcopyrite and quartz sand; a particle size of the chalcopyrite is 0.5-2 mm, and a particle size of the quartz sand is 0.4-0.6 mm; the chalcopyrite and the quartz sand are mixed in a volume ratio of 1:10; and a permeability of the first filler is greater than 250 mm/h.

### Claim 5 (depends on 4)

The rainwater garden of claim 4, wherein the biochar substrate layer has a thickness of 200-300 mm, filled with a second filler comprising biochar and quartz sand; the biochar has a particle size of 0.5-1 mm, and the quartz sand has a particle size of 0.4-0.6 mm; the biochar and the quartz sand are mixed in a volume ratio of 1:10; and a permeability of the second filler is greater than 200 mm/h.

### Claim 6 (depends on 5)

The rainwater garden of claim 5, wherein the planting layer has a thickness greater than 300 mm and is filled with a third filler comprising sandy loam and quartz sand; a particle size of the sandy loam is 0.1-0.5 mm, and a particle size of the quartz sand is 0.4-0.6 mm; the sandy loam and the quartz sand are mixed in a volume ratio of 1:5; and a permeability of the third filler is greater than 150 mm/h; and the planting layer comprises plants.

### Claim 7 (depends on 6)

The rainwater garden of claim 6, wherein the cover layer has a thickness of 50-100 mm, and comprises sawdust, tree bark, or a combination thereof.

### Claim 8 (depends on 7)

The rainwater garden of claim 7, wherein the transition layer is a substrate protective layer with a thickness of 50-100 mm, filled with quartz sand with a particle size of 0.4-0.6 mm; the gravel layer is a drainage layer with a thickness of 200-300 mm and a gravel particle size of 50-80 mm.
