# US 2025/0167530 A1 · Installation for preparing a section of electric cable

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0167530 A1
- Document ID: US20250167530A1
- Status: Published application
- Kind: A1
- Application number: 18/927,835
- Filed: 2024-10-25
- Published: 2025-05-22
- Earliest claimed: 2023-10-27
- Applicants: Nexans
- Inventors: François SESSOUC; Nicolas LALLOUET
- Web page: https://patentgrep.com/patent/US20250167530A1

## CPC

- H02G 1/1248: {Machines}
- H02G 1/129: {by means of a cryogenic fluid}
- H02G 1/1202: {by cutting and withdrawing insulation}
- H02G: INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES

## Abstract

An installation (101) for preparing a cable (1) includes a conductor surrounded by an insulation system (2) having at least one insulating layer (3) and at least one outer semiconducting layer (5). The installation has a cooling device (101) for cooling a section of the cable (1) in the form of a cylindrical cooling box (102) containing dry ice. The electric cable (1) passes through the box (102) in order to be cooled below the glass transition temperature of the outer semiconducting layer (5) and then allow the outer semiconducting layer (5) to be machined.

## Claims

### Claim 1

An installation for preparing a cable comprising:
a conductor surrounded by an insulation system comprising at least one insulating layer and at least one semiconducting layer, wherein said installation has a cooling device for cooling a section of said cable in the form of a cylindrical cooling box delimited by a cylindrical side wall and by two circular end faces, each provided with a circular opening, and in that the cylindrical side wall has at least one supply port through which a coolant material is introduced into the box, the electric cable passing through the box via the circular openings in the two end faces and being in contact with the coolant material placed in the cylindrical box.

### Claim 2 (depends on 1)

The installation according to claim 1, wherein the cylindrical box is made from a thermally insulating material.

### Claim 3 (depends on 1)

The installation according to claim 1, wherein the cylindrical box has at least two supply ports through which the coolant material is introduced, and in that said at least two supply ports are positioned along a top region of the cylindrical box, being aligned along a longitudinal axis of this box.

### Claim 4 (depends on 1)

The installation according to claim 1, wherein the two end faces are flat and parallel to each other.

### Claim 5 (depends on 4)

The installation according to claim 4, wherein the circular openings in the two end faces each occupy a central position on the corresponding end face.

### Claim 6 (depends on 1)

The installation according to claim 1, wherein the coolant material consists of a plurality of pieces of dry ice, in particular pieces at a temperature in the region of −60° C. to −78° C. at the time they are introduced into the box.

### Claim 7 (depends on 6)

The installation according to claim 6, wherein the pieces of ice all have identical geometry and dimensions.

### Claim 8 (depends on 1)

The installation according to claim 1, wherein the insulation system of the cable includes a layer of insulation surrounded by an inner layer of semiconductor and by an outer layer of semiconductor.

### Claim 9 (depends on 8)

The installation according to claim 8, wherein said installation comprises a cutting device for cutting the outer layer of semiconductor and the layer of insulation in order to prepare a section of the electric cable, and in that the cutting device comprises a cutting blade and is used after said outer layer of semiconductor and said layer of insulation have been brought to a temperature lower than their glass transition temperature by virtue of the coolant, the glass transition temperature being, in particular, between −10° C. and −50° C.

### Claim 10 (depends on 9)

The installation according to claim 9, wherein said installation comprises a common unit inside which the cooling device and the cutting device are fixed, said common unit being mounted in such a way as to be able to move along the electric cable along its axis.

### Claim 11 (depends on 9)

A method for preparing an electric cable by using the installation according to claim 9, wherein said method comprises the following steps:
a step of fixing the cooling box around at least part of the section of electric cable to be prepared,
a step of filling the cooling box through the supply ports with the coolant material,
a step of cooling said part of said section of the electric cable by means of the cylindrical cooling box, so as to cool the outer layer of semiconductor and said layer of insulation below their respective glass transition temperatures,
a step of cutting the outer layer of semiconductor and part of the layer of insulation of said part of said section of cable by means of the cutting blade, after said outer layer of semiconductor and said layer of insulation have been brought to a temperature lower than their respective glass transition temperatures by virtue of the cooling device.

### Claim 12 (depends on 11)

The method according to claim 11, wherein said method comprises a step of moving the common unit along the electric cable in order to gradually prepare successive parts of said section of said electric cable.
