# US 2025/0165879 A1 · Modeling system for energy systems

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0165879 A1
- Document ID: US20250165879A1
- Status: Published application
- Kind: A1
- Application number: 19/033,219
- Filed: 2025-01-21
- Published: 2025-05-22
- Earliest claimed: 2015-09-11
- Inventors: Paul J. Meier
- Web page: https://patentgrep.com/patent/US20250165879A1

## CPC

- G06Q 10/063: Operations research, analysis or management
- G05B 17/02: electric
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 3/003: {Load forecast, e.g. methods or systems for forecasting future load demand}
- H02J 3/06: Controlling the transfer of power between connected networks; Controlling load sharing between connected networks
- H02J 13/10: characterised by displaying of information or by user interaction, e.g. supervisory control and data acquisition [SCADA] systems
- H02J 13/182: the equipment comprising loads connected to the power network
- G06Q 50/06: Energy or water supply
- H02J 3/0012: characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 60/00: Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02P 90/845: Inventory and reporting systems for greenhouse gases [GHG]
- Y04S 10/40: Display of information, e.g. of data or controls
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S 20/00: Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S 40/20: Information technology specific aspects, e.g. CAD, simulation, modelling, system security
- G06Q: INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G05B: CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS (systems for controlling or regulating non-electric variables G05D; systems for regulating electric or magnetic variables G05F; control devices or systems insofar as characterised by mechanical features only G05G)
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02P: CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A system for modeling networks of electricity supply and demand includes a first user interface, a second user interface, a database, a controller, and a memory including instructions. The database includes a data set defining nodes and domains, each node being a geographic area with defined electricity supply and demand, each plan including instructions related to a node for managing energy infrastructure and supply and demand changes. The controller is configured to: receive a first request to create a first plan for a first node of a collection; receive plan instructions for the first plan; receive a second user request to create a second plan for a second node of the collection; receive a plan instruction to interconnect the first node with the second node in the first plan; generate a forecast including a projected value for an energy infrastructure variable; and display the forecast.

## Claims

### Claim 1

A system for modeling networks of electricity supply and demand comprising:
a first user interface;
a second user interface;
a database including a data set defining one or more nodes and one or more plans, each node being a geographic area having one or more energy infrastructures, each energy infrastructure having an electricity supply and demand, each plan including instructions related to a node for managing the one or more energy infrastructures and electricity supply and demand changes over a predetermined time, wherein the predetermined time is greater than three months,
a controller in communication with the database, the first user interface, and the second user interface; and
a memory including instructions, that when executed by the controller, cause the controller to:
receive, via the first user interface, a first request to create a first plan for a first node,
receive, via the first user interface, first plan instructions for the first plan, wherein the first plan instructions for the first plan define supply and demand changes of the one or more energy infrastructures of the respective node over the predetermined time;
receive, via the second user interface, a second user request to create a second plan for one of the first node or a second node, wherein the second plan includes second plan instructions that define electricity supply and demand changes of the one or more energy infrastructures of the respective node over the predetermined time; and
in response to a user request to generate a forecast associated with the first plan and the second plan, generate the forecast including a projected value for an energy infrastructure variable based on the first plan and the second plan.

### Claim 2 (depends on 1)

The system of claim 1, wherein the forecast includes a graphic representation for the first plan illustrating energy supply contributions to first node demand, the graphic representation including imports of electricity supply from the second node according to the second plan.

### Claim 3 (depends on 1)

The system of claim 1, wherein the data set includes a collection of nodes, the nodes of the collection having a different granularity than granularities of the first node and the second node, wherein the first node and the second node encompass a first scope of geography, and the nodes of the collection encompass a scope of geography distinct from the first node and the second node.

### Claim 4 (depends on 1)

The system of claim 1, wherein the controller is further configured to:
receive, via the second user interface, an additional request to create an additional plan for the second node;
in response to receiving a further request via the second user interface to record the additional plan as blessed, recording the additional plan as blessed in the data structure;
in response to a user request to generate a forecast associated with the first plan, the first plan instructions including a plan instruction to interconnect the first node with the second node, performing a lookup in the data structure to select the currently blessed plan for the second node as recorded in the data structure; and
generate the forecast including a projected value for an energy infrastructure variable based on the first plan and the currently blessed plan for the second node.

### Claim 5 (depends on 1)

The system of claim 1, wherein a plan instruction to interconnect the first node with the second node in the first plan includes: a plan instruction to define a transmission bandwidth to the first node, a plan instruction to define the second node as a neighbor, and a plan instruction to define a regional loadshape corresponding to aggregate loads in the first node and the second node.

### Claim 6 (depends on 1)

The system of claim 1, wherein the data set defines one or more transmission links between one or more nodes, wherein each transmission link is associated with one or more de-rating weighting factors.

### Claim 7 (depends on 1)

The system of claim 1, wherein the forecast includes both a projected value and a determination of compliance of at least one variable of the list of variables including peak capacity, electricity generation, renewable electricity supply, generation cost, average rate, and emissions of sulfur dioxide, nitrogen oxide, and carbon dioxide.

### Claim 8 (depends on 1)

The system of claim 1, wherein the forecast includes a projected value for an energy infrastructure variable based on the first plan and the second plan includes solving a regional dispatch for an aggregate regional load shape to generate the forecast, wherein, during the generation of the forecast, all electricity generating units in the first node and the second node are dispatched, and wherein, during the generation of the forecast, all electricity generating units in the instructions of the first plan and the second plan are also dispatched.

### Claim 9

A system for modeling networks of electricity supply and demand comprising:
a first user interface;
a second user interface;
a database including a data set defining one or more nodes and one or more plans, each node being a geographic area having one or more energy infrastructures, each energy infrastructure having an electricity supply amount and demand amount, each plan including instructions related to a node for managing the one or more energy infrastructures and electricity supply and demand changes over a predetermined time, wherein the demand amount is determined using an individual demand value for each multi-hour, hour, or sub-hour interval over the predetermined time of the plan;
a controller in communication with the database, the first user interface, and the second user interface; and
a memory including instructions, that when executed by the controller, cause the controller to:
receive, via the first user interface, a first request to create a first plan for a first node,
receive, via the first user interface, first plan instructions for the first plan, wherein the first plan instructions for the first plan define supply and demand changes of the one or more energy infrastructures of the respective node over the predetermined time;
receive, via the second user interface, a second user request to create a second plan for one of the first node or a second node, wherein the second plan includes second plan instructions that define electricity supply and demand changes of the one or more energy infrastructures of the respective node over the predetermined time; and
in response to a user request to generate a forecast associated with the first plan and the second plan, generate the forecast including a projected value for an energy infrastructure variable based on the first plan and the second plan.

### Claim 10 (depends on 9)

The system of claim 9, wherein the demand amount includes a peak demand amount and an off-peak demand amount.
