# US 2025/0164574 A1 · Battery management system and method for controlling the same

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0164574 A1
- Document ID: US20250164574A1
- Status: Published application
- Kind: A1
- Application number: 18/949,381
- Filed: 2024-11-15
- Published: 2025-05-22
- Earliest claimed: 2023-11-16
- Assignees: SK On Co., Ltd.
- Applicants: SK On Co., Ltd.
- Inventors: Kyu Min HWANG; Myeong Jae GO; Won Hee KIM; Yun Nyoung LEE; So Yeon CHOI; Dong Hwa HAN
- Web page: https://patentgrep.com/patent/US20250164574A1

## CPC

- G01R 31/396: Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
- G01R 31/3646: {for indicating electrical conditions or variables, e.g. visual or audible indicators}
- G01R 31/3648: {comprising digital calculation means, e.g. for performing an algorithm}
- G01R 31/367: Software therefor, e.g. for battery testing using modelling or look-up tables
- G01R 31/3835: involving only voltage measurements
- G01R 31/389: Measuring internal impedance, internal conductance or related variables
- Y02E 60/10: Energy storage using batteries
- G01R: MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES (indicating correct tuning of resonant circuits H03J3/12)
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION

## Abstract

The present disclosure relates to a battery management system and a method for controlling the same. The battery management system according to an embodiment of the present disclosure may include an alarm module configured to provide an alarm in a designated manner; an electrochemical impedance spectroscopy (EIS) measurement module configured to measure an EIS of a secondary battery; and a processor configured to receive an EIS measurement result from the EIS measurement module, calculate real intercepts of impedance values for the secondary battery based on the received EIS measurement result, determine whether the secondary battery is abnormal based on the calculated real intercepts, and control the alarm module to provide an alarm notifying that the secondary battery is abnormal if there is an abnormality in the secondary battery as a result of the determination. The present disclosure may improve the accuracy and/or efficiency in abnormality detection of the secondary battery.

## Claims

### Claim 1

A battery management system comprising:
an alarm module configured to provide an alarm in a designated manner;
an electrochemical impedance spectroscopy (EIS) measurement module configured to measure an EIS of a secondary battery; and
a processor configured to receive an EIS measurement result from the EIS measurement module, calculate real intercepts of impedance values for the secondary battery based on the received EIS measurement result, determine whether the secondary battery is abnormal based on the calculated real intercepts, and control the alarm module to provide an alarm notifying that the secondary battery is abnormal if there is an abnormality in the secondary battery as a result of the determination.

### Claim 2 (depends on 1)

The battery management system according to claim 1, wherein the EIS measurement module measures the EIS for each battery cell or battery module.

### Claim 3 (depends on 2)

The battery management system according to claim 2, wherein the processor expresses the impedance values for each of the battery cells or battery modules as a Nyquist diagram of an orthogonal coordinate system or a polar coordinate system, and calculates the real intercepts of the impedance values for each of the battery cells or battery modules using the Nyquist diagram of the orthogonal coordinate system or the polar coordinate system.

### Claim 4 (depends on 1)

The battery management system according to claim 1, wherein the processor selects a first point having a positive minimum value and a second point having a negative maximum value among imaginary parts of the impedance values, and calculates the real intercepts using coordinate values of the first point, coordinate values of the second point, and a designated equation.

### Claim 5 (depends on 1)

The battery management system according to claim 1, wherein the processor calculates a difference between a maximum value and a minimum value among the calculated real intercepts, and if the calculated difference is greater than a designated first reference value, determines that an abnormality has occurred in the secondary battery.

### Claim 6 (depends on 1)

The battery management system according to claim 1, wherein the processor calculates a standard deviation of the calculated real intercepts, and if the calculated standard deviation is greater than a designated second reference value, determines that an abnormality has occurred in the secondary battery.

### Claim 7 (depends on 1)

The battery management system according to claim 1, wherein the processor calculates a Z-score of the calculated real intercepts, and if the calculated Z-score is greater than a designated third reference value, determines that an abnormality has occurred in the secondary battery.

### Claim 8 (depends on 1)

The battery management system according to claim 1, wherein the processor controls the EIS measurement module to measure the EIS during operation of a device including the secondary battery.

### Claim 9 (depends on 1)

The battery management system according to claim 1, wherein the processor determines whether it is in a designated operation section,
wherein if it is in the designated operation section, determines whether the secondary battery is abnormal based on the calculated real intercepts, and
if it is in another operation section except for the designated operation section, estimates an impedance of the secondary battery using an equivalent circuit model (ECM) estimation module, and determines whether the secondary battery is abnormal using the equivalent circuit model-based estimated result.

### Claim 10 (depends on 1)

The battery management system according to claim 1, wherein the EIS measurement module applies a variable frequency in a designated range with a designated current amplitude to the secondary battery as an input signal, and measures a voltage of the secondary battery.

### Claim 11

A method for controlling a battery management system, the method comprising:
measuring an electrochemical impedance spectroscopy (EIS) of a secondary battery through an EIS measurement module;
calculating real intercepts of impedance values for the secondary battery based on the measured EIS;
determining whether the secondary battery is abnormal based on the calculated real intercepts; and
controlling an alarm module to provide an alarm notifying that the secondary battery is abnormal if there is an abnormality in the secondary battery as a result of the determination.

### Claim 12 (depends on 11)

The method according to claim 11, wherein the step of calculating real intercepts comprises:
expressing the impedance values for the secondary battery as a Nyquist diagram of an orthogonal coordinate system or a polar coordinate system; and
calculating the real intercepts of the impedance values using the Nyquist diagram of the orthogonal coordinate system or the polar coordinate system.

### Claim 13 (depends on 11)

The method according to claim 11, wherein the step of calculating real intercepts comprises:
selecting a first point having a positive minimum value and a second point having a negative maximum value among imaginary parts of the impedance values; and
calculating the real intercepts using coordinate values of the first point, coordinate values of the second point, and a designated equation.

### Claim 14 (depends on 11)

The method according to claim 11, wherein the step of determining whether the secondary battery is abnormal comprises:
calculating a difference between a maximum value and a minimum value among the calculated real intercepts; and
if the calculated difference is greater than a designated first reference value, determining that an abnormality has occurred in the secondary battery.

### Claim 15 (depends on 11)

The method according to claim 11, wherein the step of determining whether the secondary battery is abnormal comprises:
calculating a standard deviation of the calculated real intercepts; and
if the calculated standard deviation is greater than a designated second reference value, determining that an abnormality has occurred in the secondary battery.

### Claim 16 (depends on 11)

The method according to claim 11, wherein the step of determining whether the secondary battery is abnormal comprises:
calculating a Z-score of the calculated real intercepts; and
if the calculated Z-score is greater than a designated third reference value, determining that an abnormality has occurred in the secondary battery.

### Claim 17 (depends on 11)

The method according to claim 11, wherein the step of measuring an EIS is performed during operation of a device including the secondary battery.

### Claim 18 (depends on 11)

The method according to claim 11, wherein the step of measuring an EIS is performed in a designated partial operation section of the operation sections of the secondary battery.

### Claim 19 (depends on 18)

The method according to claim 18, further comprising determining whether it is in a designated operation section,
wherein the step of determining whether the secondary battery is abnormal comprises:
if it is in the designated operation section, determining whether the secondary battery is abnormal based on the calculated real intercepts; and
if it is in another operation section except for the designated operation section, estimating an impedance of the secondary battery using an equivalent circuit model (ECM) estimation module, and determining whether the secondary battery is abnormal using the equivalent circuit model-based estimated result.

### Claim 20 (depends on 11)

The method according to claim 11, wherein the step of measuring an EIS comprises applying a variable frequency in a designated range with a designated current amplitude to the secondary battery as an input signal, and measuring a voltage of the secondary battery.
