# US 2025/0159527 A1 · Method and apparatus for satellite access network measurement outside gaps

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0159527 A1
- Document ID: US20250159527A1
- Status: Published application
- Kind: A1
- Application number: 18/837,425
- Filed: 2023-02-10
- Published: 2025-05-15
- Earliest claimed: 2022-03-03
- Assignees: Mediatek Inc.
- Applicants: Mediatek Inc.
- Inventors: Hsuan-Li LIN
- Web page: https://patentgrep.com/patent/US20250159527A1

## CPC

- H04W 8/24: Transfer of terminal data
- H04W 24/10: Scheduling measurement reports {; Arrangements for measurement reports}
- H04W 24/02: Arrangements for optimising operational condition
- H04W 24/08: Testing, {supervising or monitoring} using real traffic
- H04W 36/0088: {Scheduling hand-off measurements}
- H04W 48/16: Discovering, processing access restriction or access information
- H04W 84/06: Airborne or Satellite Networks (space-based or airborne stations H04B7/185)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

Various solutions for satellite access network (SAN) or non-terrestrial network (NTN) measurement outside gaps with respect to user equipment and network apparatus in mobile communications are described. An apparatus may determine whether a measurement gap is needed for performing an NTN inter-frequency measurement. The apparatus may determine whether a data interruption is needed for performing the NTN inter-frequency measurement in an event that the measurement gap is not needed. The apparatus may report a user equipment capability to a network node according to a determination result.

## Claims

### Claim 1

A method, comprising:
determining, by a processor of an apparatus, whether a measurement gap is needed for performing a non-terrestrial network (NTN) inter-frequency measurement;
determining, by the processor, whether a data interruption is needed for performing the NTN inter-frequency measurement in an event that the measurement gap is not needed; and
reporting, by the processor, a user equipment (UE) capability to a network node according to a determination result.

### Claim 2 (depends on 1)

The method of claim 1, wherein the UE capability is reported per-band or per-UE.

### Claim 3 (depends on 1)

The method of claim 1, further comprising:
performing, by the processor, the NTN inter-frequency measurement outside the measurement gap in an event that the measurement gap is not needed.

### Claim 4 (depends on 1)

The method of claim 1, further comprising:
receiving, by the processor, a configuration of the measurement gap;
determining, by the processor, that a cell timing of a target satellite is drifted away from the measurement gap;
determining, by the processor, a data interruption period outside the measurement gap; and
performing, by the processor, the NTN inter-frequency measurement within the data interruption period.

### Claim 5 (depends on 4)

The method of claim 4, further comprising:
receiving, by the processor, a synchronization signal block (SSB) measurement timing configuration (SMTC) of the target satellite; and
determining, by the processor, the data interruption period according to the SMTC.

### Claim 6 (depends on 5)

The method of claim 5, wherein the data interruption period is around the SMTC, before the SMTC, after the SMTC or comprises the SMTC.

### Claim 7 (depends on 4)

The method of claim 4, further comprising:
receiving, by the processor, a configuration of synchronization signal block (SSB) of the target satellite; and
determining, by the processor, the data interruption period according to the SSB.

### Claim 8 (depends on 7)

The method of claim 7, wherein the data interruption period is before a first SSB.

### Claim 9 (depends on 4)

The method of claim 4, further comprising:
determining, by the processor, the data interruption period according to the UE capability.

### Claim 10 (depends on 4)

The method of claim 4, further comprising:
switching, by the processor, to the target cell during the data interruption period for performing the NTN inter-frequency measurement.

### Claim 11

An apparatus, comprising:
a transceiver which, during operation, wirelessly communicates with at least one network node of a wireless network; and
a processor communicatively coupled to the transceiver such that, during operation, the processor performs operations comprising:
determining whether a measurement gap is needed for performing a non-terrestrial network (NTN) inter-frequency measurement;
determining whether a data interruption is needed for performing the NTN inter-frequency measurement in an event that the measurement gap is not needed; and
reporting, via the transceiver, a user equipment (UE) capability to the network node according to a determination result.

### Claim 12 (depends on 11)

The apparatus of claim 11, wherein the UE capability is reported per-band or per-UE.

### Claim 13 (depends on 11)

The apparatus of claim 11, wherein, during operation, the processor further performs operations comprising:
performing, via the transceiver, the NTN inter-frequency measurement outside the measurement gap in an event that the measurement gap is not needed.

### Claim 14 (depends on 11)

The apparatus of claim 11, wherein, during operation, the processor further performs operations comprising:
receiving, via the transceiver, a configuration of the measurement gap;
determining that a cell timing of a target satellite is drifted away from the measurement gap; and
determining a data interruption period outside the measurement gap; and
performing, via the transceiver, the NTN inter-frequency measurement within the data interruption period.

### Claim 15 (depends on 14)

The apparatus of claim 14, wherein, during operation, the processor further performs operations comprising:
receiving, via the transceiver, a synchronization signal block (SSB) measurement timing configuration (SMTC) of the target satellite; and
determining the data interruption period according to the SMTC.

### Claim 16 (depends on 15)

The apparatus of claim 15, wherein the data interruption period is around the SMTC, before the SMTC, after the SMTC or comprises the SMTC.

### Claim 17 (depends on 14)

The apparatus of claim 14, wherein, during operation, the processor further performs operations comprising:
receiving, via the transceiver, a configuration of synchronization signal block (SSB) of the target satellite; and
determining the data interruption period according to the SSB.

### Claim 18 (depends on 17)

The apparatus of claim 17, wherein the data interruption period is before a first SSB.

### Claim 19 (depends on 14)

The apparatus of claim 14, wherein, during operation, the processor further performs operations comprising:
determining the data interruption period according to the UE capability.

### Claim 20 (depends on 14)

The apparatus of claim 14, wherein, during operation, the processor further performs operations comprising:
switching, via the transceiver, to the target cell during the data interruption period for performing the NTN inter-frequency measurement.
