# US 2025/0158883 A1 · Method and System to Manage and Discover Network Elements to Optimize Energy Utilization in IP-based Networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158883 A1
- Document ID: US20250158883A1
- Status: Published application
- Kind: A1
- Application number: 18/509,830
- Filed: 2023-11-15
- Published: 2025-05-15
- Earliest claimed: 2023-11-15
- Applicants: Cisco Technology, Inc.
- Inventors: Ammar Rayes; Balaji R. Venkatraman; Samer M. Salam
- Web page: https://patentgrep.com/patent/US20250158883A1

## CPC

- H04L 41/0823: characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability (for optimising operational conditions of wireless networks H04W24/02)
- H04L 41/0833: for reduction of network energy consumption
- H04L 41/0893: Assignment of logical groups to network elements
- H04L 41/0894: Policy-based network configuration management
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)

## Abstract

Devices, networks, systems, methods, and processes for optimizing the energy consumption of a communication network are described herein. A network optimizer can group multiple network devices in the communication network into one or more energy management groups. The network optimizer may optimize an energy consumption of the one or more energy management groups by generating and transmitting one or more energy optimization configurations. The network optimizer can generate a device replacement list for an energy management group to suggest one or more replacement devices for every replaceable device that is not capable of implementing an energy optimization function. The network optimizer may provide an interactive dashboard and may further facilitate a network operator to modify the energy management groups through the interactive dashboard. The network optimizer can monitor and control the energy consumption of the energy management groups dynamically, thereby resulting into reduction in the energy consumption of the communication network.

## Claims

### Claim 1

A device, comprising:
a processor;
a memory communicatively coupled to the processor; and
a network optimization logic, configured to:
discover a plurality of network devices in a network;
determine a plurality of device parameters corresponding to the plurality of network devices;
retrieve device placement data indicative of placements of the plurality of network devices within the network;
group a first set of network devices of the plurality of network devices into a first energy management group dynamically based on the device placement data and a first set of device parameters of the plurality of device parameters corresponding to the first set of network devices;
determine an energy optimization configuration for the first energy management group, wherein the energy optimization configuration is dynamically determined based on one or more changes within the network;
wherein the first set of network devices are configured to transmit a status signal indicative of switching on or switching to an operational mode; and
wherein one or more ports of the first set of network devices stays operational to receive one or more control signals.

### Claim 2 (depends on 1)

The device of claim 1, wherein the network optimization logic is further configured to transmit the energy optimization configuration to the first set of network devices in the first energy management group.

### Claim 3 (depends on 2)

The device of claim 2, wherein the network optimization logic is further configured to discover the plurality of network devices or transmit the energy optimization configuration to the first set of network devices by utilizing one or more network automation protocols.

### Claim 4 (depends on 3)

The device of claim 3, wherein the energy optimization configuration is indicative of one or more power down times and one or more wake-up times.

### Claim 5 (depends on 4)

The device of claim 4, wherein the first set of network devices switch off at the one or more power down times indicated by the energy optimization configuration, and wherein the first set of network devices switch on at the one or more wake-up times indicated by the energy optimization configuration.

### Claim 6 (depends on 1)

The device of claim 1, wherein the network optimization logic is further configured to:
retrieve historical usage data for the first set of network devices; and
generate the energy optimization configuration based on the historical usage data.

### Claim 7 (depends on 1)

The device of claim 1, wherein the network optimization logic is further configured to group a second set of network devices of the plurality of network devices into a second energy management group based on the device placement data and a second set of device parameters of the plurality of device parameters corresponding to the second set of network devices.

### Claim 8 (depends on 7)

The device of claim 7, wherein the network optimization logic is further configured to:
determine an operational configuration of the second set of network devices; and
generate a device replacement list for the second energy management group based on the operational configuration of the second set of network devices.

### Claim 9 (depends on 8)

The device of claim 8, wherein the device replacement list includes one or more replacement devices corresponding to each network device of the second set of network devices.

### Claim 10 (depends on 9)

The device of claim 9, further comprising a display.

### Claim 11 (depends on 10)

The device of claim 10, wherein the network optimization logic is further configured to:
generate an interactive dashboard indicative of the energy optimization configuration and the device replacement list; and
display the interactive dashboard on the display.

### Claim 12 (depends on 7)

The device of claim 7, wherein the network optimization logic is further configured to:
determine one or more critical network devices of the plurality of network devices based on the plurality of device parameters and the device placement data; and
exclude the one or more critical network devices from the first energy management group or the second energy management group.

### Claim 13 (depends on 1)

The device of claim 1, wherein the plurality of device parameters include one or more of:
device identifiers of the plurality of network devices,
software versions of the plurality of network devices, or
power-saving capabilities of the plurality of network devices.

### Claim 14 (depends on 1)

The device of claim 1, wherein the plurality of device parameters and the device placement data are stored in corresponding plurality of network devices.

### Claim 15 (depends on 1)

The device of claim 1, wherein the plurality of device parameters and the device placement data are stored in a storage device in the network.

### Claim 16

A method, comprising:
discovering a plurality of network devices in a network;
determining a plurality of device parameters corresponding to the plurality of network devices;
retrieving device placement data indicative of placements of the plurality of network devices in the network;
grouping one or more network devices of the plurality of network devices into an energy management group dynamically based on the device placement data and one or more device parameters of the plurality of device parameters corresponding to the one or more network devices;
determining an energy optimization configuration for the energy management group, wherein the energy optimization configuration is dynamically determined based on one or more changes within the network; and
configuring the plurality of network devices to transmit a status signal indicative of switching to an operational mode, wherein one or more ports of the plurality of network devices stays operational to receive one or more control signals.

### Claim 17

A device comprising:
a processor;
a memory communicatively coupled to the processor; and
a network optimization logic, configured to:
discover a plurality of network devices in a network;
determine a plurality of device parameters corresponding to the plurality of network devices;
retrieve device placement data indicative of placements of the plurality of network devices in the network;
group one more network devices of the plurality of network devices into one or more energy management groups dynamically based on the device placement data and the plurality of device parameters; and
determine one or more energy optimization configurations corresponding to the one or more energy management groups, wherein
one or more ports of the plurality of network devices stays operational to receive one or more control signals; and
the energy optimization configuration is dynamically determined based on one or more changes within the network.

### Claim 18 (depends on 17)

The device of claim 17, wherein the network optimization logic is further configured to:
transmit the one or more energy optimization configurations to the one or more energy management groups respectively.

### Claim 19 (depends on 17)

The device of claim 17, wherein the network optimization logic is further configured to:
retrieve historical usage data for an energy management group of the one or more energy management groups;
generate a power down schedule for the energy management group based on the historical usage data; and
transmit the power down schedule to the energy management group.

### Claim 20 (depends on 17)

The device of claim 17, wherein the network optimization logic is further configured to:
determine an operational configuration of an energy management group of the one or more energy management groups; and
generate a device replacement list for the energy management group based on the operational configuration of the energy management group.
