# US 2025/0158691 A1 · Ue operation for multi-trp system for wireless networks

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158691 A1
- Document ID: US20250158691A1
- Status: Published application
- Kind: A1
- Application number: 18/726,343
- Filed: 2022-01-06
- Published: 2025-05-15
- Earliest claimed: 2022-01-06
- Assignees: Nokia Technologies Oy
- Applicants: Nokia Technologies Oy
- Inventors: Timo KOSKELA; Lars DALSGAARD; Daejung YOON
- Web page: https://patentgrep.com/patent/US20250158691A1

## CPC

- H04B 7/06964: {Re-selection of one or more beams after beam failure}
- H04B 7/088: {using beam selection}
- H04L 27/261: {Details of reference signals}
- H04W 72/1273: of downlink data flows
- H04B: TRANSMISSION
- H04L: TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION (arrangements common to telegraphic and telephonic communication H04M)
- H04W: WIRELESS COMMUNICATION NETWORKS (broadcast communication H04H; communication systems using wireless links for non-selective communication, e.g. wireless extensions H04M1/72)

## Abstract

An method includes determining, by a user device, a configuration for a plurality of beam failure detection reference signal (BFD-RS) sets, and a candidate beam set associated with each of the plurality of (BFD-RS) sets; determining, by the user device, a beam failure status of the plurality of (BFD-RS) sets, including determining a beam failure for at least one of the (BFD-RS) sets; adjusting at least one of the following based on the beam failure status of the plurality of (BFD-RS) sets: a candidate beam evaluation period to evaluate candidate beams of an associated candidate beam set after a beam failure of one of the (BFD-RS) sets; a beam failure detection evaluation period for the user device to detect a failure of one of the (BFD-RS) sets; and scheduling restrictions that restrict or not restrict occasions in which the user device is required to monitor a downlink control channel.

## Claims

### Claim at position 1

1-20. (canceled)

### Claim 21

An apparatus comprising:
at least one processor; and
at least one memory including computer program code;
the at least one memory and the computer program code configured to, with the at least one processor, cause the apparatus at least to:
determine a configuration for a plurality of beam failure detection reference signal sets, and a candidate beam set associated with each of the plurality of beam failure detection reference signal sets;
determine a beam failure status of the plurality of beam failure detection reference signal sets, including determining a beam failure for at least one of the beam failure detection reference signal sets;
adjust at least one of the following based on the beam failure status of the plurality of beam failure detection reference signal sets:
a candidate beam evaluation period for the apparatus to evaluate candidate beams of an associated candidate beam set after a beam failure of one of the beam failure detection reference signal sets;
a beam failure detection evaluation period for the apparatus to detect a failure of one of the beam failure detection reference signal sets; and
scheduling restrictions that restrict or not restrict occasions in which the apparatus is required to monitor a downlink control channel.

### Claim 22 (depends on 21)

The apparatus of claim 21, wherein:
the plurality of beam failure detection reference signal sets comprises one or more beam failure detection-reference signals; and
a candidate beam set comprises one or more reference signals for new candidate beam evaluation and detection.

### Claim 23 (depends on 21)

The apparatus of claim 21, wherein the beam failure status of at least one beam failure detection reference signal set of the plurality of beam failure detection reference signal sets is determined based on a request to evaluate candidate beams in a candidate beam set associated with a beam failure detection reference signal set, wherein the request is received from another protocol layer of the apparatus.

### Claim 24 (depends on 21)

The apparatus of claim 21, wherein receiving a request to evaluate candidate beams in a candidate beam set associated with a beam failure detection beam reference signal set indicates a beam failure for the beam failure detection beam reference signal set.

### Claim 25 (depends on 21)

The apparatus of claim 21, wherein:
the adjusting a beam failure detection evaluation period comprises the at least one memory and the computer program code configured to, with the at least one processor, cause the apparatus at least to: adjust, based on the beam failure status of the plurality of beam failure detection reference signal sets, a first scaling factor for the beam failure detection evaluation period; and
the adjusting a candidate beam evaluation period comprises the at least one memory and the computer program code configured to, with the at least one processor, cause the apparatus at least to: adjust, based on the beam failure status of the plurality of beam failure detection reference signal sets, a second scaling factor for the candidate beam evaluation period.

### Claim 26 (depends on 21)

The apparatus of claim 21, wherein the adjusting scheduling restrictions comprises the at least one memory and the computer program code configured to, with the at least one processor, cause the apparatus at least to:
adjust of scheduling restrictions that, when applied for the apparatus, restrict or not restrict occasions in which the apparatus is required to monitor a downlink control channel associated with a non-failed beam failure detection reference signal set in order for the apparatus to prioritize or adjust prioritization of, in case of a conflict with candidate beam evaluation, candidate beam evaluation to evaluate candidate beams associated with a failed beam failure detection reference signal set over monitoring a downlink control channel associated with a non-failed beam failure detection reference signal set.

### Claim 27 (depends on 26)

The apparatus of claim 26:
wherein the plurality of beam failure detection reference signal sets comprise a first beam failure detection reference signal set and a second beam failure detection reference signal set;
wherein scheduling restrictions are not used by the apparatus to monitor a downlink control channel associated with a non-failed first beam failure detection reference signal set based on a failed second beam failure detection reference signal set; and
wherein scheduling restrictions are used by the apparatus to monitor a downlink control channel associated with for a non-failed second beam failure detection reference signal set based on a failed first beam failure detection reference signal set.

### Claim 28 (depends on 26)

The apparatus of claim 26:
wherein the plurality of beam failure detection reference signal sets comprise a primary beam failure detection reference signal set and a non-primary beam failure detection reference signal set;
wherein scheduling restrictions are not used by the apparatus to monitor a downlink control channel associated with a non-failed primary beam failure detection reference signal set based on a failed non-primary beam failure detection reference signal set; and
wherein scheduling restrictions are used by the apparatus to monitor a downlink control channel associated with a non-failed non-primary beam failure detection reference signal set based on a failed primary beam failure detection reference signal set.

### Claim 29 (depends on 21)

The apparatus of claim 21, wherein the beam failure status of the plurality of beam failure detection reference signal sets comprises one or more of the following:
only one of the plurality of beam failure detection reference signal sets configured for the apparatus has failed;
at least one of the plurality of beam failure detection reference signal sets, but fewer than all of the plurality of beam failure detection reference signal sets configured for the apparatus, has failed;
all of the plurality of beam failure detection reference signal sets configured for the apparatus have failed;
at least one primary beam failure detection reference signal set configured for the apparatus has failed, but a non-primary beam failure detection reference signal set configured for the apparatus has not failed; and
a non-primary beam failure detection reference signal set configured for the apparatus has failed, but a primary beam failure detection reference signal set configured for the apparatus has not failed.

### Claim 30 (depends on 21)

The apparatus of claim 21:
wherein the plurality of beam failure detection reference signal sets comprise a first beam failure detection reference signal set and a second beam failure detection reference signal set;
wherein a first candidate beam evaluation period is used to evaluate candidate beams of candidate beam sets associated with one or both of the first and second beam failure detection reference signal sets based on a beam failure of both of the first and second beam failure detection reference signal sets; and
wherein a second candidate beam evaluation period, different than the first candidate beam evaluation period, is used by the apparatus to evaluate candidate beams of a candidate beam set associated with the first beam failure detection reference signal set based on a beam failure only of the first beam failure detection reference signal set.

### Claim 31 (depends on 30)

The apparatus of claim 30:
wherein the first candidate beam evaluation period is obtained based on a first candidate beam evaluation period scaling factor; and
wherein the second candidate beam evaluation period is obtained based on a second candidate beam evaluation period scaling factor that is different from the first candidate beam evaluation period scaling factor.

### Claim 32 (depends on 30)

The apparatus of claim 30, wherein the first beam failure detection reference signal set comprises a primary beam failure detection reference signal set, and the second beam failure detection reference signal set comprises a non-primary beam failure detection set, wherein different candidate beam evaluation periods are configured or used by the apparatus for evaluating candidate beams associated with the primary beam failure detection reference signal set and the non-primary beam failure detection reference signal set.

### Claim 33 (depends on 21)

The apparatus of claim 21:
wherein the plurality of beam failure detection reference signal sets comprise a primary beam failure detection reference signal set and a non-primary beam failure detection reference signal set;
wherein a first candidate beam evaluation period is used by the apparatus to evaluate candidate beams of a candidate beam set associated with the primary beam failure detection reference signal set based on a beam failure of the primary beam failure detection reference signal set and a failure of less than all of the plurality of beam failure detection reference signal sets; and
wherein a second beam failure detection evaluation period, longer than the first beam failure detection evaluation period, is used by the apparatus to evaluate candidate beams of a candidate beam set associated with the non-primary beam failure detection reference signal set based on a beam failure of the non-primary beam failure detection reference signal set and a failure of less than all of the plurality of beam failure detection reference signal sets.

### Claim 34 (depends on 21)

The apparatus of claim 21:
wherein the plurality of beam failure detection reference signal sets comprise a first beam failure detection reference signal set and a second beam failure detection reference signal set;
wherein a first beam failure detection evaluation period is used to evaluate candidate beams of candidate beam sets associated with one or both of the first and second beam failure detection reference signal sets after a beam failure of both of the first and second beam failure detection reference signal sets;
wherein the first beam failure detection reference signal set has failed, and the second beam failure detection reference signal set has not failed, and the adjusting a beam failure detection evaluation period for the apparatus comprises:
using a second beam failure detection evaluation period, longer than the first beam failure detection evaluation period, to evaluate candidate beams of a candidate beam set associated with the first beam failure detection reference signal set.

### Claim 35 (depends on 21)

The apparatus of claim 21, wherein:
the beam failure detection evaluation period is adjusted based on one or more of:
a number of beams included within the plurality of beam failure detection reference signal sets;
whether a number of beams included within the plurality of beam failure detection reference signal sets is greater than a threshold.

### Claim 36 (depends on 35)

The apparatus of claim 35, wherein the primary beam failure detection reference signal set, the non-primary beam failure detection reference signal set, or a candidate beam set associated with the primary beam failure detection reference signal set or associated with the non-primary beam failure detection reference signal set, is determined based on an index of the beam failure detection reference signal set or an index of a candidate beam set.

### Claim 37

A method comprising:
determining, by a user device within a wireless network, a configuration for a plurality of beam failure detection reference signal sets, and a candidate beam set associated with each of the plurality of beam failure detection reference signal sets;
determining, by the user device, a beam failure status of the plurality of beam failure detection reference signal sets, including determining a beam failure for at least one of the beam failure detection reference signal sets; and
adjusting, by the user device, at least one of the following based on the beam failure status of the plurality of beam failure detection reference signal sets:
a beam failure detection evaluation period for the user device to detect a failure of one of the beam failure detection reference signal sets;
a candidate beam evaluation period for the user device to evaluate candidate beams of an associated candidate beam set after a beam failure of one of the beam failure detection reference signal sets; and
scheduling restrictions that restrict or not restrict occasions in which the user device is required to monitor a downlink control channel.

### Claim 38 (depends on 37)

The method of claim 37 wherein:
the plurality of beam failure detection reference signal sets comprises one or more beam failure detection-reference signals; and
a candidate beam set comprises one or more reference signals for new candidate beam evaluation and detection.

### Claim 39 (depends on 37)

The method of claim 37, wherein the beam failure status of at least one beam failure detection reference signal set of the plurality of beam failure detection reference signal sets is determined based on a request to evaluate candidate beams in a candidate beam set associated with a beam failure detection reference signal set, wherein the request is received from another protocol layer of the user device.

### Claim 40

A non-transitory computer-readable storage medium comprising instructions stored thereon that, when executed by at least one processor, are configured to cause a computing system to perform:
determining a configuration for a plurality of beam failure detection reference signal sets, and a candidate beam set associated with each of the plurality of beam failure detection reference signal sets;
determining a beam failure status of the plurality of beam failure detection reference signal sets, including determining a beam failure for at least one of the beam failure detection reference signal sets; and
adjusting at least one of the following based on the beam failure status of the plurality of beam failure detection reference signal sets:
a beam failure detection evaluation period for a user device to detect a failure of one of the beam failure detection reference signal sets;
a candidate beam evaluation period for the user device to evaluate candidate beams of an associated candidate beam set after a beam failure of one of the beam failure detection reference signal sets; and
scheduling restrictions that restrict or not restrict occasions in which the user device is required to monitor a downlink control channel.
