# US 2025/0158686 A1 · Systems and methods for user equipment (ue) initiated beam management

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158686 A1
- Document ID: US20250158686A1
- Status: Published application
- Kind: A1
- Application number: 18/930,453
- Filed: 2024-10-29
- Published: 2025-05-15
- Earliest claimed: 2023-11-13
- Assignees: Samsung Electronics Co., Ltd.
- Applicants: Samsung Electronics Co., Ltd.
- Inventors: Mohamed Awadin; Hoda ShahMohammadian; Yuan-Sheng Cheng; Liang Hu; Jung Hyun Bae; Hamid Saber
- Web page: https://patentgrep.com/patent/US20250158686A1

## CPC

- H04B 7/0632: {Channel quality parameters, e.g. channel quality indicator [CQI]}
- H04B 7/0695: {using beam selection}
- H04B 7/0639: {Using selective indices, e.g. of a codebook, e.g. pre-distortion matrix index [PMI] or for beam selection}
- H04B 7/06952: {Selecting one or more beams from a plurality of beams, e.g. beam training, management or sweeping}
- H04B 17/328: {Reference signal received power [RSRP]; Reference signal received quality [RSRQ]}
- H04B: TRANSMISSION

## Abstract

A system and a method are disclosed for performing a UE-initiated beam-management procedure, the method includes receiving, by a user equipment (UE), configuration information including beam-quality-assessment data, for the UE to determine a quality of a current beam and/or a quality of a new beam, and triggering-event data, for the UE to determine that a condition is satisfied for performing a UE-initiated (UEI) beam-management (BM) procedure, and based on determining, by the UE, that the condition is satisfied, sending a beam report.

## Claims

### Claim 1

A method comprising:
receiving, by a user equipment (UE), configuration information comprising:
beam-quality-assessment data, for the UE to determine a quality of a current beam and/or a quality of a new beam; and
triggering-event data, for the UE to determine that a condition is satisfied for performing a UE-initiated (UEI) beam-management (BM) procedure; and
based on determining, by the UE, that the condition is satisfied, sending a beam report.

### Claim 2 (depends on 1)

The method of claim 1, further comprising:
determining, by the UE, that a first beam is the current beam; and/or
determining, by the UE, that a second beam is the new beam.

### Claim 3 (depends on 1)

The method of claim 1, wherein the determining that the condition is satisfied comprises comparing a characteristic of the current beam with a characteristic of the new beam.

### Claim 4 (depends on 1)

The method of claim 1, wherein the condition comprises the quality of the new beam being a threshold value better than the current beam, the threshold value being based on a reference signal received power (RSRP).

### Claim 5 (depends on 4)

The method of claim 4, wherein the UE determines that the condition is satisfied by determining that a difference between a first RSRP of the current beam and a second RSRP of the new beam is less than the threshold value.

### Claim 6 (depends on 4)

The method of claim 4, wherein the threshold value is configured via a higher-layer signal, the higher-layer signal complying with a radio resource control (RRC) protocol.

### Claim 7 (depends on 1)

The method of claim 1, wherein the condition comprises the quality of the current beam being worse than a threshold value, the threshold value being determined based on a signal strength of the current beam.

### Claim 8 (depends on 1)

The method of claim 1, wherein the condition comprises the quality of the new beam being a threshold value better than a reference signal (RS) derived from an activated transmission configuration indicator (TCI) state.

### Claim 9 (depends on 1)

The method of claim 1, wherein the UE determines that a first beam is the current beam implicitly, based on an indicated transmission configuration indicator (TCI) state or based on an activated TCI state.

### Claim 10 (depends on 1)

The method of claim 1, wherein the current beam is explicitly configured via a radio resource control (RRC) protocol.

### Claim 11 (depends on 1)

The method of claim 1, wherein the UE determines that a second beam is the new beam implicitly, based on an activated transmission configuration indicator (TCI) state.

### Claim 12 (depends on 1)

The method of claim 1, wherein the new beam is explicitly configured via a radio resource control (RRC) protocol.

### Claim 13 (depends on 1)

The method of claim 1, wherein the condition comprises a threshold number of deterioration instances.

### Claim 14 (depends on 13)

The method of claim 13, wherein the threshold number of deterioration instances is based on the deterioration instances occurring consecutively.

### Claim 15 (depends on 13)

The method of claim 13, wherein the threshold number of deterioration instances is configured via a radio resource control (RRC) protocol.

### Claim 16 (depends on 13)

The method of claim 13, wherein the threshold number of deterioration instances is based on the deterioration instances occurring within a time window, the time window being configured via a radio resource control (RRC) protocol.

### Claim 17 (depends on 16)

The method of claim 16, wherein the time window:
starts based on an occurrence of a first deterioration instance; and
terminates based on an expiration of a timer or based on the threshold number of deterioration instances occurring.

### Claim 18 (depends on 13)

The method of claim 13, wherein the threshold number of deterioration instances is based on a beam failure recovery (BFR) procedure.

### Claim 19 (depends on 1)

The method of claim 1, further comprising sending, by the UE as part of a UE capability signaling procedure, information indicating that the UE is capable of supporting the UEI BM procedure.

### Claim 20

A user equipment (UE) comprising a processing circuit, the processing circuit being configured to perform:
receiving configuration information comprising:
beam-quality-assessment data, for the UE to determine a quality of a current beam and/or a quality of a new beam; and
triggering-event data, for the UE to determine that a condition is satisfied for performing a UE-initiated (UEI) beam-management (BM) procedure; and
based on determining that the condition is satisfied, sending a beam report.
