# US 2025/0158417 A1 · Assessing performance of a power plant

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158417 A1
- Document ID: US20250158417A1
- Status: Published application
- Kind: A1
- Application number: 18/840,174
- Filed: 2022-12-23
- Published: 2025-05-15
- Earliest claimed: 2022-02-22
- Applicants: TotalEnergies OneTech
- Inventors: Louis POLLEUX; Sami GHAZOUANI; John SANDOVAL MORENO; Gilles GUERASSIMOFF; Jean-Paul MARMORAT
- Web page: https://patentgrep.com/patent/US20250158417A1

## CPC

- H02J 3/381: {Dispersed generators}
- H02J 3/466: Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J 3/0075: {for providing alternative feeding paths between load and source according to economic or energy efficiency considerations, e.g. economic dispatch}
- H02J 3/28: Arrangements for balancing of the load in networks by storage of energy
- H02J 3/32: using batteries or super capacitors with converting means
- H02J 2101/24: Photovoltaics
- H02J 2103/30: Simulating, planning, modelling, reliability check or computer assisted design [CAD] of electric power networks
- Y04S 10/50: Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

The disclosure notably relates to a computer-implemented method for assessing performance of a power plant. The power plant comprises a solar field system and a storage system. The method comprises providing one or more sets of inputs. Each set of inputs represents a respective architecture of the power plant. The method further comprises computing, for each set of inputs, by a computer system and based on the set of inputs, output data including one or more yearly indicators. For each set of inputs, the computing comprises, for each day of a set of days, optimizing a schedule for the power plant and computing daily indicators for the day. The computing further comprises, for each set of inputs, determining the one or more yearly indicators based on the computed daily indicators. The method forms an improved solution for assessing performance of a power plant.

## Claims

### Claim at position 1

1-15. (canceled)

### Claim 16

A computer-implemented method for assessing performance of a power plant comprising a solar field system and a storage system, the method comprising:
providing one or more sets of inputs, each set of inputs representing a respective architecture of the power plant; and
computing, for each set of inputs, by a computer system and based on the set of inputs, output data including one or more yearly indicators, the computing comprising, for each set of inputs:
for each day of a set of days:
optimizing a schedule for the power plant with the architecture of the set of inputs; and
computing daily indicators for the day based on the optimized schedule, the daily indicators including one or more power quality indicators; and
determining the one or more yearly indicators based on the computed daily indicators.

### Claim 17 (depends on 16)

The method of claim 16, wherein the set of days comprises a number of days less than the number of days of a year or less than representative days in a year.

### Claim 18 (depends on 17)

The method of claim 17, wherein the daily indicators include a daily cumulative irradiance indicator, an average spinning reserve requirement indicator, and a variability index indicator.

### Claim 19 (depends on 17)

The method of claim 17, the method further comprising determining the set of days, the determining of the set of days comprising:
partitioning a set of days forming a year in a set of clusters based on the daily indicators of the day; and
computing a center of gravity for each cluster, wherein each computed center of gravity corresponds to one day of the determined set of days.

### Claim 20 (depends on 19)

The method of claim 19, wherein the partitioning comprises a k-means clustering.

### Claim 21 (depends on 16)

The method of claim 16, wherein the set of days comprises a worst-case scenario, the worst-case scenario corresponding to the day of the year having the highest variability index indicator.

### Claim 22 (depends on 16)

The method of claim 16, wherein the one or more sets of inputs comprise a plurality of sets of inputs, the computing of the output data further comprising, for each set of inputs:
determining whether the architecture represented by the set of input is operable based on the determined one or more yearly indicators.

### Claim 23 (depends on 22)

The method of claim 22, wherein the method comprises iteratively providing a respective set of inputs and computing respective output data for the respective set of inputs, the method further comprising:
when it is determined at a current iteration that the architecture represented by the current set of inputs is not operable, providing a set of inputs at the next iteration representing a modification of the architecture of the current iteration by reducing a power capacity of the solar field system or increasing a storage capacity of the storage system.

### Claim 24 (depends on 16)

The method of claim 16, wherein the one or more yearly indicators include at least one of:
a fuel consumption indicator, the determining of the fuel consumption indicator comprising an occurrence-weighted sum of corresponding daily indicators;
a CO2 emission indicator, the determining of the CO2 emission indicator comprising an occurrence-weighted sum of corresponding daily indicators;
a frequency variation indicator;
a minimum frequency indicator; and
an indicator of cumulated time of frequency disturbances.

### Claim 25 (depends on 16)

The method of claim 16, wherein the computing of the daily indicators comprises:
discretizing the day in a set of intervals, each interval comprising an average profile of the power generated by the solar field system; and
iteratively for each interval of the set:
optimizing a dispatch of the power plant based on the average profile of the interval; and
simulating grid dynamics in the power plant for the optimized dispatch.

### Claim 26 (depends on 16)

The method of claim 16, wherein the one or more sets of inputs comprises several sets of inputs, thereby computing respective one or more yearly indicators for each set, the method further comprising upgrading a real-world power plant comprising a solar field system and a storage system, the upgrading comprising:
selecting one of the one or more sets of inputs based on the computed respective one or more yearly indicators for each set, wherein the method further comprises, in the real-world power plant, at least one of:
integrating the architecture represented by the selected set of inputs in the power plant; and
performing an improvement of an existing architecture of the power plant based on the architecture represented by the selected set of inputs.

### Claim 27 (depends on 16)

The method of claim 16, wherein the one or more sets of inputs comprises several sets of inputs, thereby computing respective one or more yearly indicators for each set, the method further comprising designing a power plant comprising a solar field system and a storage system, the designing comprising:
selecting one of the one or more sets of inputs based on the computed respective one or more yearly indicators for each set, thereby determining an architecture for the power plant, the selected set of inputs representing the determined architecture.

### Claim 28

A non-transitory computer readable storage medium having recorded thereon a computer program, the computer program comprising instructions for performing a method for assessing performance of a power plant comprising a solar field system and a storage system, the method comprising:
providing one or more sets of inputs, each set of inputs representing a respective architecture of the power plant; and
computing, for each set of inputs, by a computer system and based on the set of inputs, output data including one or more yearly indicators, the computing comprising, for each set of inputs:
for each day of a set of days:
optimizing a schedule for the power plant with the architecture of the set of inputs; and
computing daily indicators for the day based on the optimized schedule, the daily indicators including one or more power quality indicators; and
determining the one or more yearly indicators based on the computed daily indicators.

### Claim 29 (depends on 28)

The storage medium of claim 28, wherein the set of days comprises a number of days lower than the number of days of a year or less than representative days in a year.

### Claim 30 (depends on 29)

The storage medium of claim 29, wherein the daily indicators include a daily cumulative irradiance indicator, an average spinning reserve requirement indicator, and a variability index indicator.

### Claim 31 (depends on 29)

The storage medium of claim 29, the method further comprising determining the set of days, the determining of the set of days comprising:
partitioning a set of days forming a year in a set of clusters based on the daily indicators of the day; and
computing a center of gravity for each cluster, wherein each computed center of gravity corresponds to one day of the determined set of days.

### Claim 32

A system comprising a processor coupled to a memory and a graphical user interface, the memory having recorded thereon a computer program, the computer program comprising instructions for performing a method for assessing performance of a power plant comprising a solar field system and a storage system, the method comprising:
providing one or more sets of inputs, each set of inputs representing a respective architecture of the power plant; and
computing, for each set of inputs, by a computer system and based on the set of inputs, output data including one or more yearly indicators, the computing comprising, for each set of inputs:
for each day of a set of days:
optimizing a schedule for the power plant with the architecture of the set of inputs; and
computing daily indicators for the day based on the optimized schedule, the daily indicators including one or more power quality indicators; and
determining the one or more yearly indicators based on the computed daily indicators.

### Claim 33 (depends on 32)

The system of claim 32, wherein the set of days comprises a number of days lower than the number of days of a year or less than representative days in a year.

### Claim 34 (depends on 33)

The system of claim 33, wherein the daily indicators include a daily cumulative irradiance indicator, an average spinning reserve requirement indicator, and a variability index indicator.

### Claim 35 (depends on 33)

The system of claim 33, wherein the method further comprising determining the set of days, the determining of the set of days comprising:
partitioning a set of days forming a year in a set of clusters based on the daily indicators of the day; and
computing a center of gravity for each cluster, wherein each computed center of gravity corresponds to one day of the determined set of days.