# US 2025/0158405 A1 · Smart switching panel for secondary power supply

> Agents: this data is available as JSON from the patentgrep API and MCP server — see https://patentgrep.com/llms.txt

- Number: US 2025/0158405 A1
- Document ID: US20250158405A1
- Status: Published application
- Kind: A1
- Application number: 19/025,572
- Filed: 2025-01-16
- Published: 2025-05-15
- Earliest claimed: 2017-12-08
- Assignees: Briggs & Stratton Corporation
- Applicants: Briggs & Stratton, LLC
- Inventors: Brian Northway; Michael Miller
- Web page: https://patentgrep.com/patent/US20250158405A1

## CPC

- H02J 3/14: by switching loads on to, or off from, the networks, e.g. progressively balanced loading
- H02J 3/00: Circuit arrangements for AC mains or AC distribution networks
- H02J 9/061: {for DC powered loads}
- H02J 13/12: Monitoring network conditions, e.g. electrical magnitudes or operational status
- H02J 13/14: the power network being locally controlled, e.g. home energy management systems [HEMS]
- H02J 13/34: the equipment being switches, relays or circuit breakers
- H02J 3/38: Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J 9/068: {Electronic means for switching from one power supply to another power supply, e.g. to avoid parallel connection}
- H02J 2105/12: supplying households or buildings
- Y02B 10/30: Wind power
- Y02B 70/3225: Demand response systems, e.g. load shedding, peak shaving
- Y02B 90/20: Smart grids as enabling technology in buildings sector (smart grids supporting the management or operation of end-user stationary applications in general, or like technologies with no associated climate change mitigation effect Y04S20/00)
- Y02E 10/56: Power conversion systems, e.g. maximum power point trackers
- Y04S 20/12: Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
- Y04S 20/222: Demand response systems, e.g. load shedding, peak shaving
- H02J: ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- Y02B: CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02E: REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y04S: SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS

## Abstract

A smart switching panel includes a plurality of switching elements each connected to both a primary power supply and a secondary power supply and to at least one electric load, a controller operatively connected to each of the plurality of switching elements, and a plurality of current sensors each in communication with the controller. Each of the plurality of switching elements is operable in a first condition and a second condition. The controller is operable to independently control a condition of each of the switching elements. Each of the current sensors is positioned between one of the switching elements and the at least one electric load associated with the switching element.

## Claims

### Claim 1

A switching panel for providing electrical power to a plurality of electric loads from a primary power supply or a secondary power supply, comprising:
a plurality of switching elements each connected to both the primary power supply and the secondary power supply and to at least one electric load within the plurality of electric loads, wherein each of the plurality of switching elements is operable in a first condition and a second condition;
a controller operatively connected to each of the plurality of switching elements, wherein the controller is operable to independently control a condition of each of the switching elements; and
a plurality of current sensors each in communication with the controller, wherein each of the current sensors is positioned between one of the switching elements and at least one electric load of the plurality of electric loads associated with the switching element, wherein each of the plurality of current sensors is operable to detect a current draw of the at least one electric load associated with the switching element;
wherein the primary power supply and secondary power supply are configured to supply power to the switching panel simultaneously; and
wherein the controller is configured to transition one or more of the plurality of switching elements from the first condition to the second condition upon receiving an indication that the detected current draw of the electric load associated with the switching element is below a threshold current value.

### Claim 2 (depends on 1)

The switching panel of claim 1, wherein each of the plurality of switching elements is configured to transition to an open condition upon receiving an indication from a corresponding one of the current sensors that a sensed current downstream of the switching element has exceeded a second threshold current value.

### Claim 3 (depends on 2)

The switching panel of claim 2, wherein the at least one electric load associated with the switching element is connected to the primary power supply when the switching element is in the first condition, is connected to the secondary power supply when the switching element is in the second condition, and is disconnected from both the primary power supply and the secondary power supply when the switching element is in the open condition.

### Claim 4 (depends on 2)

The switching panel of claim 2, wherein the primary power supply is a utility power supply.

### Claim 5 (depends on 2)

The switching panel of claim 2, wherein the secondary power supply is chosen from a group consisting of: solar cells, electric storage batteries, a wind turbine, a photovoltaic generator, and a generator.

### Claim 6 (depends on 5)

The switching panel of claim 5, wherein the secondary power supply includes two or more power sources.

### Claim 7 (depends on 1)

The switching panel of claim 1, further comprising a tertiary power supply, wherein the tertiary power supply is connected to each of the plurality of switching elements, wherein each of the plurality of switching elements is further operable in a third condition, wherein the tertiary power supply is configured to supply power to the switching panel simultaneously with the primary power supply and the secondary power supply, and wherein the controller is configured to transition one or more of the plurality of switching elements to the third condition to connect the tertiary power supply to at least one electric load of the plurality of electric loads.

### Claim 8 (depends on 1)

The switching panel of claim 1, wherein each of the switching elements is a MOSFET.

### Claim 9 (depends on 1)

The switching panel of claim 1, wherein each of the switching elements is an insulated-gate bipolar transistor.

### Claim 10 (depends on 1)

The switching panel of claim 1, wherein each of the switching elements is a multi-position relay.

### Claim 11 (depends on 1)

The switching panel of claim 1, wherein the secondary power supply is connected to a DC-AC inverter, wherein the DC-AC inverter is configured to supply AC electrical power to the plurality of switching elements.

### Claim 12

A switching panel for providing electrical power to an electric load from multiple power supplies configured to supply power to the switching panel simultaneously, the switching panel comprising:
a switching element connected to each of a first power supply and a second power supply, and configured to transmit electrical power received from the first power supply or the second power supply to at least one electric load coupled to the switching element, the switching element being operable in a first condition, a second condition, and an open condition;
a controller operatively connected to the switching element and operable to control a condition of the switching element; and
a current sensor in communication with the controller, wherein the current sensor is positioned between the switching element and the electric load, wherein the current sensor is operable to detect a current draw of the electric load;
wherein the controller is configured to transition the switching element from the first condition to the second condition upon receiving an indication that the detected current draw of the electric load associated is below a threshold current value.

### Claim 13 (depends on 12)

The switching panel of claim 12, wherein a DC-AC inverter is positioned between the second power supply and the switching panel, the DC-AC inverter being configured invert DC electrical power from the second power supply into AC electrical power to supply AC electrical power to the switching element.
